Search Documents

  • NIOSH
    OFR-46(7)-81 Risk Analysis For Rock Slopes In Open Pit Mines - Final Technical Report - Appendices A Through M Detailed Geologic Data Underlying Developments

    By Herbert H. Einstein

    Appendices A through M contain information that is the basis for many developments reported in the main text (Parts I through V); this information is, however, not needed in applying the research resu

    Jan 1, 1979

  • NIOSH
    OFR-5-74 Summary Of Heavy Metals Study At San Juan Ridge, Nevada County, California

    By Russell R. McLellan

    The Tertiary channel gravel deposits in northern California were selected Or detailed investigation by the U. S. Bureau of Mines as part of a national program to locate potential sources of gold that

    Jan 1, 2012

  • NIOSH
    RI 7800 Degasification Of Virgin Pittsburgh Coalbed Through A Large Borehole (6080190f-0d98-45f0-83dd-b714a20ad923)

    By H. H. Fields

    The Bureau of Mines is in the process of degasifying a virgin area in northern West Virginia from the base of an 839-foot-deep vertical borehole¬. An in situ gas pressure hole 199 feet long, and seven

    Jan 1, 1973

  • CIM
    Paste Fill Design at the Louvicourt Mine

    By Pierre Lacombe

    "The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be

    Jan 1, 1995

  • DFI
    Large-Scale Earthquake-Induced Landslide Repair Following New Zealand’s Kaikoura Earthquakes

    By Mathew Avery, Colby Barrett

    In November 2016, a 7.8-magnitude earthquake caused more than 100,000 cubic meters of rock and debris to tumble down and bury the transportation infrastructure below Ohau Point in New Zealand. All rou

    Jan 1, 2018

  • CIM
    Geology of the Two Duck Lake Intrusion and the Marathon Cu-PGE Deposit, Coldwell Complex, Northern Ontario

    By Richard Dahl, Richard P. Taylor, David H. Watkinson

    "Abstract - Detailed mapping of the Eastern Gabbro, Coldwell Complex, Ontario, revealed that the copper and platinum-group-element deposit on the Marathon property is confined to a coarsegrained to pe

    Jan 1, 2001

  • NIOSH
    Bulletin 127 Gold Dredging in the United States

    By Charles Janin

    The recovery of gold from sands and gravels is one of the oldest forms of mining; it antedates history and has been practiced by savage peoples. In North America the search for placer gold has been a

    Jan 1, 1918

  • SAIMM
    The Influence Of The Quality Of Ferrosilicon On The Rheology Of Dense Medium And The Ability To Reach Higher Densities - Introduction

    By H A. Myburgh

    The beneficiation of heavy metal oxides, such as iron ore, is usually performed with heavy medium separation in cyclones, static baths and lately with Larcodems. Atomized ferrosilicon is most suitable

    Jan 1, 2006

  • TMS
    Carbon-thermal Reduction Process for making Al-Si Alloys from Al2O3-SiO2 Containing Industrial Wastes

    By Jilai Xue

    Industrial wastes containing 30-50 wt.% Al2O3 and 40-60 wt.% SiO2 may serve as an alternative resource for producing Al-Si alloys. Various raw materials such as used refractory materials from metallur

    Jan 1, 2010

  • SAIMM
    Mintek Thermal Magnesium Process (MTMP): Theoretical And Operational Aspects

    By M. Abdellatif

    Keywords: Magnesium, pyrometallurgy, Mintek Extensive testwork on atmospheric thermal magnesium production has highlighted certain important fundamental and operational factors that have a major i

    Jan 1, 2006

  • CIM
    Determination of Metal and Mineral Flotation Performance at one of Falconbridge’s Base Metal Operations

    By Dominic Fragomeni, Tony DiFeo, Martyn P. Hay

    "As part of an investigation into flotation modelling of industrial scale operations, Falconbridge Ltd organised a “blind” test of the SUPASIM flotation model developed by Eurus Mineral Consultants (E

    Jan 1, 2006

  • NIOSH
    RI 5960 Precipitation And Electrode Position Of Mercury In Caustic Solutions ? Summary

    By J. W. Town

    This report summarizes the results of laboratory investigations made by the Bureau c! Mines on the recovery of mercury from caustic sulfide solutions by aluminum precipitation and by electrodeposition

    Jan 1, 1962

  • TMS
    Thermodynamic Modeling of copper drossing process in lead refining

    By Pengfu Tan

    Lead blast-furnace bullion cools to near its freezing point in an operation known as copper drossing or hot drossing usually contains 0.02-0.06% copper. The removal of this copper is usually carried o

    Jan 1, 2006

  • NIOSH
    OFR-84(3)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume III - Methane Generator

    By R. V. Ramani

    This report is volume 3 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1974

  • SME
    A 4.75m Contractor Manufactured EPB Machine

    By Bruce Richardson

    A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec

    Jan 1, 2008

  • SAIMM
    Fatigue Properties Of Fabricated Aluminium I-Beams

    By M. Matema

    Paper written on project work carried out in partial fulfilment of BSc (Eng.) Metallurgy and Materials Engineering Small and large welded aluminium specimens were tested in fatigue and the results

    Jan 1, 2005

  • AUSIMM
    Iron Isotope Fractionation in Magmatic-hydrothermal Minerals – A Porphyry Copper Case Study from the Batu Hijau Deposit, Sumbawa, Indonesia

    By C M. Wawryk, S L. Garwin, J D. Foden

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Batu Hijau porphyry Cu-Au deposit in south-western Sumbawa, Indonesia is an ideal natur

    Mar 18, 2015

  • SAIMM
    Some Benefits Arising From The Establishment Of A Mining Infrastructure Prior To The Commissioning Of The Shaft

    By H. C. de Wet

    The predevelopment and preparation of a total infrastructure in a deep level mining environment, prior to the shaft system being commissioned has major advantages. This paper intends to indicate these

    Jan 1, 1997

  • NIOSH
    RI 9089 - Extended Bumper Designs for Large Haulage Trucks

    By Stephen A. Swan

    This Bureau of Mines report discusses research to analyze and evaluate extended bumper systems in order to determine the degree of protection provided to equipment operators in the event of rear-end c

    Jan 1, 1987

  • SAIMM
    Effect Of Residual Tectonic Stresses On Roadway Stability In An Underground Coal Mine

    By B. Unver

    Effective strata control is a prerequisite for maintaining an efficient mining operation. If the strata in the vicinity of an opening are not controlled effectively, it is impossible to perform a safe

    Jan 1, 1999