Search Documents

  • CIM
    Waste dump management at Quintette Coal Limited

    By W. P. Tassie

    "The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors

    Jan 1, 1988

  • AUSIMM
    Mineralisation and Structural Setting of the Rise and Shine Shear Zone, Otago Schist: Comparisons to the Macraes Deposit

    By D Craw, L Cox, R J. Norris

    The Rise and Shine Shear Zone is a mineralised low-angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. The zone is commonly believed to

    Jan 1, 2005

  • AUSIMM
    Mount Isa Cut and Fill (MICAF) Stoping

    ABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng

    Jan 1, 1968

  • SME
    Cost Estimating Standards For International Reporting Of Ore Reserves: What Are They? What Should They Be?

    By O. Schumacher

    Guidelines for publication of information defining the amount and grade of resource material available in a deposit are well established in Australasia?s JORC Guidelines, Canada?s National Instrument

    Feb 27, 2013

  • NIOSH
    IC 8176 Bureau Of Mines Boiler-Water Service ? Introduction

    By A. A. Berk

    Other Federal agencies have been coming to the Bureau of Mines for help with the purchase and utilization of fuel, largely coal, almost since the day the Bureau was created in 1910. The requests cover

    Jan 1, 1963

  • AUSIMM
    Stripping of the Southern Exhaust Airway at Mount Lyell

    In the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa

    Jan 1, 1974

  • NIOSH
    Mineral Resources Of The Antelope Creek Study Area, Phillips County, Montana ? Summary

    By J. Douglas Causey

    In 1984, at the request of the Bureau of Land Management, the Bureau of Mines studied 9,600 acres of the 12,350-acre Antelope Creek Wilderness Study Area (MT-065-266) in order to evaluate its mineral

    Jan 1, 1986

  • NIOSH
    OFR-180-82 Guidelines For Environmental Monitoring In Underground Coal Mines ? Phase 1

    By H. A. Wright

    This report assesses the economic, legal, institutional and technical factors that affect the current and future status of implementation of mine monitoring systems in the United States. It begins wit

    Jan 1, 1982

  • CIM
    Improving Fluorine-Bearing Minerals Rejection in the Flotation of a Brazilian Sulphide Copper Ore

    By Keila Gonçalves, Aline Tavares, Danielly Couto

    "The sulphide copper deposits from the Carajás area (North region of Brazil) were generated by the percolation of hydrothermal fluids in volcanic and granitic rock and are denominated as IOCG deposits

    Jan 1, 2011

  • NIOSH
    IC 8046 Trends And Outlook In The Pacific Northwest Aluminum Industry ? Summary

    By Frank B. Fulkerson

    Aluminum production in the Pacific Northwest has a new potential for expansion and increased stability of operation. This new potential results from greater availability of power; lower freight rates

    Jan 1, 1962

  • TMS
    Technological Characterization of Serpentinite Rock from Andorinha (Bahia/Brazil)

    By Aline Maria dos Santos Teixeira

    Serpentinite is an ultra basic and metamorphic rock consisting mainly of magnesium, calcium and silicon oxides. The rock under study is a host rock of chromite mine located in Andorinha, BA. The objec

    Jan 1, 2010

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • DFI
    Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - Introduction

    By W. J. van Niekerk

    Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st

    Jan 1, 2000

  • NIOSH
    RI 6077 Synthetic Mica From Low Cost Raw Materials

    By H. R. Shell

    Fluorphlogopite mica was synthesized from inexpensive and abundant olivine, clay, feldspar, and sand (plus K2SiF6). The raw materials were melted in crucibles and in an internal resistance electric fu

    Jan 1, 1962

  • NIOSH
    Bulletin 186 Investigations of Zirconium with Especial Reference to the Metal and Oxide

    By J. W. Thompson, M. N. RICH

    That there is wide interest in the preparation and properties of metallic zirconium and its salts is indicated by the many articles recently published in scientific and technical journals and the many

    Jan 1, 1921

  • SAIMM
    Educating The Future Mining Engineering Practitioner - Introduction

    By R. Webber-Youngman

    The Department of Mining Engineering at the University of Pretoria accepts that the process of teaching and learning improvement is an ongoing exercise with the ultimate aim to deliver well-rounded mi

    Jan 1, 2011

  • ISEE
    The Relation between Excavator Bucket Loading Time and Particle Size Distribution of Shot Rock

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Kagan Ozdemir

    In the condition that drilling and blasting technique is inevitable depending on the rock mass and material characteristics on mining activities, the fragmentation rate and particle size distribution

    Jan 1, 2007

  • NIOSH
    OFR-20-84 Feasibility Study Of In-Mine Coal Preparation Facilities

    This work examined the feasibility of in-mine coal preparation in two phases. Phase I included a survey of previous investigations and a preliminary analysis of the economic and technical feasibility

    Jan 1, 1982

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • AUSIMM
    The Metallurgical Development of an Enargite-Bearing Deposit

    The Metallurgical Development of an Enargite-Bearing Deposit

    Sep 13, 2010