Search Documents

  • SME
    Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation Monitoring

    A series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi

    Jan 7, 2020

  • AUSIMM
    Geology and the Search for Mineral Deposits

    For the purposes of this discussion it is assumed that contributors should express the thoughts that arise from their personal experience. So wide is the range of mineral deposits, and so varied the m

    Jan 1, 1950

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • SME-ICGCM
    Innovative Secondary Support Technologies For Western Mines

    By Thomas M. Barczak

    With the development of the shield support, the primary requirement for successful ground control in longwall mining is to provide stable gate road and bleeder entries. Wood cribbing has been the domi

    Jan 1, 1996

  • CIM
    Hydrogen Cracking and Fracture of Galvanized Transmission Tower Bolts

    By J. C. Thornley

    Service failures of seemingly conventional galvanized bolts, in normal operation, on transmission towers in New Brunswick have been found to be the result of hydrogen cracking. In both these cases, si

    Jan 1, 1979

  • DFI
    Starsol Piles Foundation Of A Steel Structure At The San Martin De La Vega Resort Park (Madrid)

    By Claudio Olalla

    This paper relates to the foundation of a steel structure located at the San Martin de la Vega (Madrid) amusement park. The structure has more than 100 supports with various loading conditions, includ

    Jan 1, 2002

  • AUSIMM
    Validation and Simulation of Optimised Compressive Crushing

    Validation and Simulation of Optimised Compressive Crushing Ores and aggregates are used in countless applications all around in the society. The frequent and escalating usage of these natural resour

    Sep 13, 2010

  • DFI
    Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall Performance

    By Reinhard Gnilsen

    Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i

    Jan 1, 1988

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • TMS
    Arsenic Dopant Effect in Nickel Silicide Formation for NiSi/Hf-based/Si Gate Stacks

    By S. Y. Tan

    The thermal stability of fully silicided NiSi with arsenic doping on silicon was investigated. The aims of the work were to investigate the Ni silicide phase-related issues associated with arsenic dop

    Jan 1, 2010

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • DFI
    Innovative Use Of Micropile Load Test Data For 18th Street Expressway Bridge

    By Lance A. Roberts

    Micropiles are commonly utilized for applications other than foundation retrofit. In bridges, for example, micropiles can serve as the permanent foundation elements or can be used in temporary suppor

    Jan 1, 2009

  • SME
    Using Dynamic Anisotropy To Improve Resource Estimation

    By K. Zabrusky

    Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami

    Feb 27, 2013

  • CIM
    Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern Ontario

    By A. H. Mumin, A. K. Somarin, K. S. Oran

    "Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake

    Jan 1, 2007

  • NIOSH
    RI 8485 Structure Response and Damage Produced by Airblast From Surface Mining

    By David E. Siskind

    The Bureau of Mines studied airblast from surface mining to assess its damage and annoyance potential, and to determine safe levels and appropriate measurement techniques. Research results obtained fr

    Jan 1, 1980

  • AUSIMM
    An Investigation into the Relative Efficiencies of Common Brattice Cloths in use in Australian Coal Mines

    Common brattice cloths in use in Australian coal mines are compared by permeability measurements. The respective advantages of twill weave and tarpauling* weave cloths are listed, and the improvements

    Jan 1, 1959

  • NIOSH
    OFR-96-79 Normalizing MESA-HSAC (A Mining Enforcement And Safety Administration-Health And Safety Analysis Center) Injury Data For Coal Mine Mobile Equipment Operators

    By Louis Schaffer

    This report characterizes several coal Dine mobile equipment operator populations with respect to age, mine experience, machine operator experience, and training. The information is used to demonstrat

    Jan 1, 1977

  • AUSIMM
    Pike River Coal - Modern Mine Design

    The Pike River Coal Company is set to develop the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the Brunner S

    Jan 1, 2005

  • SME
    Tunnel Protection by Ground Improvement Prior to Track Lowering

    By Ronald E. Triplett, George K. Burke, Bernard H. Voor

    To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which

    Jan 1, 2001

  • CIM
    The Effects of Nuggety Gold on Gold Deportment – Lessons from Beaton Creek Paleo-Placer Gold Project, Australia

    By Mark McComb, Geoffrey R. Lane

    "Over the years many differing approaches have been developed to clearly understand the nature, mode of occurrence, associations and deportment of both free-milling and refractory gold in a wide varie

    Jan 1, 2015