Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Molecular Gate® Adsorption System For The Removal Of Carbon Dioxide And / Or Nitrogen From Coalbed And Coal Mine MethaneBy Micheal Mitariten
The recovery of natural gas (primarily methane) from coalbed deposits is an established and growing source for the U.S and accounts for over 7% of its total production. The gas from on-purpose degass
Jan 1, 2005
-
Taconite Mining – Concerns and ChallengesBy William R. Yernberg
The combined 75th Annual Minnesota Section of SME meeting and 63rd Annual University of Minnesota Mining Symposium was held April 9 and 10, 2002, in Duluth, MN. This year’s theme was “Keys to the Fut
Jan 1, 2002
-
Sulfur From Surface OresBy John M. Dale
Now that the price of sulfur has reached unexpected high levels, it is little wonder that sulfur from surface ores is again receiving attention. In most instances, it is advantageous for an ore to be
Jan 9, 1981
-
Geophysical Assessment Of The Mount Princeton Geothermal Area, Colorado ? SummaryBy M. Batzle
The upper Arkansas basin has some of the greatest potential for geothermal development in Colorado. Over several summers, students conducted an investigation using seismic, gravity, and magnetics in
Jan 1, 2011
-
Development And Large-Scale Testing Of Innovative Tunnel Support SystemsBy Robert M. Semple, Harvey W. Parker
INTRODUCTION Two promising innovative tunnel support systems are being developed by the Civil Engineering Department of the University of Illinois. One of these is a lining which can be placed by a
Jan 1, 1997
-
Pillar Recovery At The Buick MineBy David E. Nicholas, Steven R. Dismuke, Paul F. Cicchini
The Buick mine, located 195 kilometers (120 miles) southwest of St. Louis in the Viburnum Trend, is owned and operated by Homestake Mining Company. The mine produces lead and zinc ore from a room and
Jan 1, 1986
-
Construction of a Mixed Face Reach Through Granitic Rocks and ConglomerateBy John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler
The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol
Jan 1, 2007
-
Numerical Evaluation of Tunnel Lining in Visco?elastic creep active groundBy Kyoosang Yoo
The report presents the results corresponding to the analysis of a lining system for tunnels in soil and soft rock in creep-active ground. The purpose of the analysis is to evaluate the performance of
Jan 1, 2010
-
The Longest Drive?Portland?s CSO MicrotunnelsBy Christa Overby
As part of the City of Portland, Oregon?s East Side Combined Sewer Overflow Tunnel Project, nine separate 2,130 mm (84-inch) diameter reinforced concrete pipe microtunnel drives totaling approximately
-
Colorado Miners Discuss Challenges of the New CenturyBy Steve Kral
The mining industry in Colorado faces the same problems the industry faces throughout the United States and the world — record low commodity prices and increasing regulatory and environmental restrict
Jan 1, 2000
-
CoalBy F. Freme
Coal production in the United States increased in2004 by 36 Mt (39.7 million st) to end the year at 1 Gt(1.11 billion st), according to the U.S. Energy Information Administration (EIA). This was a 3.
Jan 1, 2005
-
Data Evaluation for Sustainable Development IndicatorsBy S. Möllerherm
"The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A
Jan 1, 2005
-
METSI - Innovative solutions and technologies for management of mining related water in South AfricaBy R. Schwarz, E. Pusch, A. Juch
"The paper describes in general the objectives, goals as well as theoretical background of "METSI"-project proposal submitted to German BMBF (Federal Ministry of Education and Research). The METSI pro
Jan 1, 2011
-
TECHNICAL NOTE - Accommodating the Land Use Planning Provisions of the Surface Mining Control and Reclamation ActBy L. W. Saperstein
Public Law (PL) 95-87 contains explicit demands for land use planning in its reclamation and designation sections. Both sections require recognition of local land use plans; however, they are not well
Jan 12, 1983
-
Metallogenic Characteristics Of The “Borska Reka” Porphyry Copper Deposit In The Bor Copper And Gold Deposit, East SerbiaBy D. Kozelj
Introduction The porphyry copper deposit “Borska Reka” is the biggest undeveloped deposit in the Timok Magmatic Complex (TMC). Total reserve calculated manually is 611 Mt (cut-off grade 0.3% Cu) of 0
Jan 1, 2007
-
Development of buffer station for safe and eco-friendly mining of seabed mineral resourcesBy Tae-kyeong Yeu, Jong-Choi, Cheon-Hong Min, Hyung-woo Kim, Jae- Won Oh, Sup Hong, Minuk Lee, Sung-Soon Kim, Chang-Ho Lee, Ki-Young Seong
"Collecting mineral resources from the seabed using a seafloor crawling robot is the firststep in the mining operation. The second-step is lifting the collected ore up to the water surface. For liftin
Sep 1, 2014
-
Mining to play a larger role at bauma 2010Once every three years the eyes of the construction and mining industry?s turn to Munich, Germany for the bauma trade fair and exhibition. From April 19-25, Messe München International (MMI) will host
Jan 4, 2010
-
Mining Lawyers Meet, Mark a Half Century of WorkBy Tim O’Neil
Question: Looking forward, do we face a future in which energy markets, energy policy and energy conflicts threaten to preoccupy, if not dominate, our concerns over economic growth, national security
Jan 1, 2004
-
On-Line Particle Analysis Of AggregatesBy R. Owen, T. Canty, C. Marks
The industrial vision system provides on-line 2D particle size analysis for aggregate slurries in both the overflow and underflow of hydrocyclones. This paper covers required vision system features a
Jan 1, 2002
-
Geotechnical Exploration for a Lake Mead IntakeBy Richard F. Coon
Six potential locations along the west shore of Lake Mead were evaluated to site anew water intake pumping station for the SNWA. The evaluations were based upon geotechnical exploration results and c
Jan 1, 1997