Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002

  • SME
    The Northwest Side Relief Sewer Tunnel—Challenges Became Success Stories

    By Faruk Oksuz, Clay Haynes, Miguel Sanchez, Patrick Finn, Roger J. Maurer

    The Milwaukee Metropolitan Sewerage District’s (MMSD)’s challenges of basement flooding and wet weather sewer overflows are being creatively addressed with the Northwest Side Relief Sewer tunnel. The

    Jan 1, 2005

  • SME
    Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New Jersey

    By Keith Schaeffer

    This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f

    Jan 1, 2008

  • SME
    Real Options: A Tool For Managing Technical Risk In A Mine Plan

    By J. A. Botín

    NPV is a static measure of project value which does not discriminate between levels of internal and external risk in project valuation. Due to current investment project?s characteristics, a much more

    Jan 1, 2012

  • SME
    Effect Of Ph And Electrolyte On The Stability Of Surfactant-Free Foam Films - Preprint 09-130

    The stability of surfactant-free foam films was studied using the thin film pressure balance (TFPB) technique. In pure water, it was not possible to produce foam films due to weak film elasticity and

    Jan 1, 2009

  • SME
    Impact Of Consolidation On The Shear Strength Of Coal Refuse Impoundments – Preprint 97-110

    By R. J. Sweigard, C. T. Justice, T. Beckham, E. D. Thompson, T. C. Hopkins

    Fine coal refuse is often pumped, as slurry, into surface impoundments as a means of permanent disposal. As the available volume is filled, the height of the embankments are frequently increased. Many

    Feb 24, 1997

  • SME
    Tire maintenance requires an entire team effort

    By Roger Best

    In the mining industry, where some of the vehicles are larger than a one-story house, tire maintenance cannot be accomplished by the tire shop alone. It takes an army of people to maintain a fleet of

    Jan 2, 2010

  • SME
    Processing researchers continue efforts to streamline US mining

    By P. Rosten

    US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing

    Jan 5, 1985

  • SME
    Effects of Temperature and pH on Pressure Filtration of Coal Refuse Slurry

    By G. S. S. Raman, M. S. Klima

    Coal refuse slurries stored in tailings impoundments can potentially lead to environmental concerns such as effluent seepage, property devaluation, and in extreme cases, dam failures. Pressure filtrat

    Jun 17, 2019

  • SME
    Drive Options For Belt and Apron Feeders

    By Laszlo Toth

    A feeder is used to control the gravity flow of bulk solids from storage areas, like a bin or a stockpile. For this type of application, it is important to select a proper drive that can fulfill all

    Jan 1, 2003

  • SME
    Alumar: Improving Local Communities Capacities For Implementation A Sustainable Development Model. São Luis- Maranhão-Brazil.

    By D. Campos, J. M. Macedo, S. Chadwick

    The incorporation of low cost technology transfer to increase the ability of locals to acquire and maintain long term employment are key ingredients for sustainable industrial development. Alcoa’s Alu

    Jan 1, 2004

  • SME
    Secondary Grouting at the Chattahoochee Tunnel

    By Judy B. Jones, Bradley A. Crenshaw, Theodore DePooter

    This paper reviews groundwater issues leading to a secondary grouting program at the Chattahoochee Tunnel that was implemented subsequent to the contact grouting program. The secondary grouting progra

    Jan 1, 2005

  • SME
    The As-Built Geotechnical Report: Its Use For Design Of Support For Three Rock Stations Washington, D.C. Metro

    By Carl G. Bock

    INTRODUCTION The Washington Metropolitan Area Transit Authority (WMATA) has let a contract for the excavation of three rock stations, spaced about 3550' (1082m) apart, beneath Connecticut Aven

    Jan 1, 1976

  • SME
    Shaft Sinking In The Hemlo Gold District

    By Peter White

    The Hemlo Gold District, located on the north shore of Lake Superior, was discovered in 1981 and will become one of the largest gold mining camps in Canada. Three major Canadian mining companies are p

    Jan 1, 1985

  • SME
    Second Manapouri Tailrace Tunnel Design and Construction Considerations

    By Brian Heer, David Young, Randall Essex

    The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and

    Jan 1, 1997

  • SME
    Revamp And Modernization Of Gearless Mill Drives

    By M. Ahrens

    Gearless mill drives (GMD) are a well established solution for grinding applications in the minerals and mining industries. The paper describes the functionality and technical features of such drive s

    Jan 1, 2008

  • SME
    Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons – Preprint 97-54

    By J. J. Gusek

    Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without king reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land conditions

    Feb 24, 1997

  • SME
    Utilization of Strain Measurements on Shielded Tunnel Boring Machines

    By Brad Murray

    Evaluating the performance of a shielded tunnel boring machine (TBM) can be difficult because the ground cannot be observed directly and in relation to the TBM attitude within the excavation. It is di

    Jan 1, 2008

  • SME
    Planning to meet the required DPM concentration levels in underground mines ? a calibration model

    By k. Osei-Boakye

    This paper presents the calibration of a real-time aerosol monitor, the TSI DustTrak?, to the NIOSH 5040 method being used by the Mine Safety and Health Administration (MSHA) for compliance enforcemen

    Jan 1, 2009

  • SME
    Automatic Selection of Fragment Images From a Moving Conveyor Belt

    By W. X. Wang

    In the mining and quarry industries, rock fragments are often transported by conveyor belt. To estimate the qualities of the rock fragments (i.e., size distribution and shape), an operator must take

    Jan 1, 1996