Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Keeping Airblasts Under Control

    By Jaak J. K Daemen, Clayton R. Morlock

    A study was performed to evaluate the predictability of airblast overpressures induces by production mine blasting. Thirty-seven production blasts were monitored using 3 blasting seismographs giving o

    Jan 1, 1983

  • ISEE
    The Hercudet Nonelectric Delay Blasting Cap System New Developments in Field Usage

    By Robert B. Hopler

    The Hercudet ? Nonelectric Delay Blasting Cap System has undergone significant changes since the last paper on the subject was presented at the 1978 S.E.E. Conference. The changes have been made to im

    Jan 1, 1980

  • ISEE
    Journal: 100 Years / A PRIMER ON EXPLOSIVES FOR COAL MINERS Bulletin 17 by Charles E. Munroe & Clarence Hall U.S. Bureau of Mines, Washington, D.C.

    By Robert Hopler

    Of the common causes of the larger mine accidents, such as falls of roof and coal, gas and dust explosions, mine fires, and the misuse of explosives, all of which are often closely related, each must

    Jan 1, 2012

  • ISEE
    Computer Modelling of Bench Blasting for Grade Control

    By Lindsay Wade, Peter Dare-Bryan

    Benches in surface mines often contain known areas of ore and known areas of waste, which must be mined selectively. When rock is blasted it not only fragments but is also physically, and non-uniforml

    Jan 1, 2001

  • ISEE
    Diagnostics of Production Blasts in a Deep Underground Mine

    By F. Malek

    An extensive blast monitoring program has been carried out to study explosive performance and the effectiveness of blast designs in production blasts in a deep underground mine. Comprehensive monitori

    Jan 1, 2013

  • ISEE
    Transient Vibration and Complaints an Emperical Study of Coal Mine Detonation

    By Gerald R. Coonan

    Laboratory research is being conducted to substantiate suggested levels for voluntary standards on human response to transient vibration. The application of those findings to actual field conditions,

    Jan 1, 1982

  • ISEE
    Integration of Big Data from Drilling and Blasting for Plant Throughput Optimization at Constancia Mine

    By Hernan Escalante, Jonathan Alvis, Paulo Alcazar

    Constancia Mine, operated by Hudbay Perú and located in the district of Velille, Chumbivilcas province, Cusco, is an open-pit operation characterized by low-grade ore. In this context, operational eff

    Jan 26, 2026

  • ISEE
    Site Specific Blasting Model Using Schmidt Tensile Strength and Image Analysis

    By K. M. Kim, J. B. Kemeny

    A case study was conducted with 5 shots with varying pre-blast block sizes and explosive energies. From this case study a site-specific predictive fragmentation model was developed. There are two main

    Jan 1, 2011

  • ISEE
    Electronic Detonators: Delivering the Advance in Hong Kong

    By Ashlin Pillay, Osamu Iwata

    Hong Kong is ranked as the world’s third most important international financial hub and attracts significant growth and development annually. The city is also known as the world's most vertical city,

    Jan 1, 2015

  • ISEE
    Shaft Holing Project at Bulyanhulu Gold Mine, Tanzania

    By W. De Graaf, C. Mkumbo

    Bulyanhulu Gold Mine Limited (BGML) commissioned a project of sinking a Bulk Air Cooling Shaft during its programme to improve the ventilation system on the mine. As part of this project, a ventilatio

    Jan 1, 2011

  • ISEE
    Regulatory Review of Blasting Related Citizen Complaints

    By Kenneth Eltschlager

    The Surface Mining Control and Reclamation Act of 1977 requires that blasting be conducted so as to prevent injury to people and damage to public or private property. The three adverse effects are fly

    Jan 1, 2001

  • ISEE
    Arlanda Link - A New Railway Beneath Arlanda Airport in Stockholm, Sweden, - A Technical Blasting Challenge

    By Donald Jonson

    The Arlanda Link project is for the time being the most interesting project in Sweden, concerning rock and blasting technology. The total amount of rock excavated beneath Arlanda airport comprises 800

    Jan 1, 1997

  • ISEE
    Protection Techniques for Explosive Demolition of RC Pillar

    By Seung-Kyu Baek, Chang-Ha Ryu, Yang-Kyun Kim

    Safety concern is one of the most important parameters in the design of building demolition by explosive blasting. Accidents were sometimes reported due to the flying chips of fragmented materials in

    Jan 1, 2002

  • ISEE
    Assessment and Application of a Single-Charge Blast Test at the Kiruna Mine, Sweden

    By U Nyberg

    Peak particle velocity (PPV) and distance measurements from a single-charge blast test conducted by Swedish researchers in iron ore at the Kiruna Mine in northern Sweden are presented. They are used a

    Jan 1, 2011

  • ISEE
    Missouri S&T Experimental Mine Expansion and Associated Risk Safety Analysis

    By Patrick Cahill, Jacob Miller, Nolan Mundwiller, Catherine Johnson

    "The Experimental Mine at the Missouri University of Science and Technology is undergoing major developments. The underground workings are being expanded to include a ramp down to a second level which

    Jan 1, 2017

  • ISEE
    Application of Factor of Safety Concept for Evaluation of Flyrock Risk in Some Limestone Mines

    By A K. Raina, P B. Chourdhury

    Flyrock is the unwanted throw of rock fragments to excessive distances in opencast blasting. The incidence is relative in nature incorporating the distance of objects of concern like structures within

    Jan 1, 2008

  • ISEE
    Blasting Effects on Water Wells

    By D T. Froedge

    Before this study was started, literature was searched and cases of alleged water well damage were investigated. Occurrence of ground water in Appalachia is primarily in low yield, fractured, water ta

    Jan 1, 1983

  • ISEE
    The Effect of Air Filled Voids on Impulse Delivered by a Buried Explosive

    By Ulrich Leiste, David M. Fox

    This paper presents the results from small scale testing aimed at measuring the loads on a rigid target due to the detonation of a buried mine. The aim of this research is to find how the impulse deli

    Jan 1, 2013

  • ISEE
    Numerical investigation of impact of misfires and out-of-sequence delays on fragmentation and gravity flow in SLC

    By C. Yi, D. Johansson, C. San Miguel, M. Wimmer

    Sublevel caving (SLC) is a mass mining method based upon the utilization of gravity flow of blasted ore and caved waste rock. Production blasting has significant impact on the efficiency and productiv

    Jan 1, 2024

  • ISEE
    Blasting for Wall Control and Stability using Electronic Detonators at the Bald Mountain Mine, Nevada

    By Kurt Oakes, John Williams

    Placer Dome, US operates the Bald Mountain Mine. The Bald Mountain Mine is a surface operation located in remote northwestern White Pine County in east-central Nevada, approximately midway between Elk

    Jan 1, 2004