Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Comparison of Compliance Measures for Blasting near an Industrial Structure Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part IIIBy C. Aimone-Martin, C. Dowding, M. Jern, J. Gjødvad
This article compares percentages of compliance for six national standards to demonstrate how these standards vary on-site in a real project. This, to the best of the authors' knowledge, has not been
Jan 1, 2024
-
Powder Factor Analysis of Quarry Blasts Through the Fragmentation-Energy Fan ConceptBy Ian Bell
This paper investigates fragmentation in an aggregate quarry using the fragmentation-energy fan concept. Six blasts were monitored, located one behind the other in the same quarry area. The rock struc
Jan 1, 2019
-
Ring Blasting Mine to Mill OptimizationBy Joel Chipana, Roberto Laredo, Benjamin Cebrian
Ring blasting is a common production method in underground metal mines. As a drill and blast process, it presents particular features that do not correspond with bench blasting in open pit or undergro
Jan 1, 2017
-
Make a Good ImpressionBy Sandra Penttinen
There are several ways to get a positive reaction from abutters to blasting projects. When you need to enter structures to conduct a blast-blast inspection, the impression you make on the structure ow
Jan 1, 2005
-
Productivity Increases Through Pattern Expansion With Ultra-HighBy Miguel Humpire Huamani, Gustavo Huerta Valer, Jorge C. Cárdenas Miranda
As part of the continuous improvement and increase productivity to achieve the mining and extraction plan of a low-grade open pit copper operation, alternatives are required to expand the blast patter
Feb 6, 2023
-
Testing Electronic Detonators to Increase SAG Mill Throughput at the Red Dog MineBy Norman Paley
A blasting project was undertaken at the Teck Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by using electronic detonators. The Jul
Jan 1, 2010
-
Application of blast control plugs and their positive results on airblast and surface fragmentationBy Lynn Long
We have seen many new developments in the explosive and blasting accessory category, but one of the most useful items is the blast control plug. Blast control plugs are cone shaped units that are plac
Jan 1, 1996
-
Controlled Blasting Technology for Tunnel Crossing Under High-speed Rail in Small DistanceBy Weiying Zeng, Shouwei Wang, Jinbei Zhong, Xiangdong Meng, Lingtian Meng
"Due to a drainage problem, the Lanzhou to Chongqing high-speed rail line had been out of service during the 2015 wet season, so a drainage tunnel is to be constructed for the line and required to be
Jan 1, 2017
-
Assessment of Blast Energy Usage and Induced Rock Damage in a Hard Rock BlastingBy M. S. Dotto
The knowledge of the explosive/ rock mass interaction process is important in predicting blast performance. It includes understanding rock properties, energy usage, and attenuation in the rock mass. T
Feb 1, 2020
-
Flyrock Control - By Chance or DesignBy Adrian J. Moore, Alan B. Richards
Responsible blasting requires that rock throw be controlled to ensure that no danger will result to people and property. This paper describes the development and testing of empirical field calibrated
Jan 1, 2004
-
"Journal: 100 Years / Iron Mining in Minnesota By Charles E Van Barneveld, University of Minnesota, Minneapolis 912 The Mesabi (""Missabe"") RangeTHE MESABI (“MISSABE”) RANGE"By Charles E. Van Barneveld
RBH Note: the following item is a little different than the usual, in that it shows how explosives were used in the past to assist in putting down holes for iron ore prospecting on the early Mesabi Ra
Jan 1, 2013
-
Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine ProductivityBy Tyler Rockley, J. P. Remi Proulx, Ruilin Yang
A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr
Feb 1, 2020
-
Unlocking the Wealth From Benefit Sharing in Drill and BlastBy Lawrie Logan, Mike Wiggin
This paper will be in two parts, a discussion of the benefits available from benefit sharing as a concept followed by an examination of how this approach was applied at Mesa J Mine and what improvemen
Jan 1, 2001
-
Use of Electronic detonators to control blast vibrations – a cautionary taleBy S. Hosein, W. Birch, C. Johnson
The widespread adoption of electronic detonators has given rise to the development of linear superposition to control the environmental impact on both third-party properties and residents resulting fr
Jan 1, 2024
-
Conversion from Two-Pass Overburden Removal to Cast Blasting at Simplot PhosphatesBy Dale Preece, Steven Case, Cassidy McAllister
Simplot Phosphates produces high quality phosphate fertilizer through open pit mining. The operation near Vernal, UT began as a three-pass mining process carried out with drill and blast followed by t
Jan 1, 2012
-
Dust Control in Surface MinesBy John W. Brown
"Adequate dust control in and around rock drills is a problem that must be solvedfor the health and safety of workers running the drill as well as those working around thedrilling operation This paper
Jan 1, 1999
-
Solving Blasting Safety Hazards with Advanced TechnologyBy Ronald W. Roberts
For years, blasters have experienced near-misses, injuries, and yes, even fatalities as a result of the dangerous nature of our business. Yet, some blasters continue to portray the immortal attitude:
Jan 1, 1996
-
Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade ControlBy Peter Dare-Bryan, Will Hunt, Lee Julian
It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule
Feb 6, 2023
-
A Mine-to-Crusher Framework for Aggregate Operations – Part 3By Diogo Fonseca, José Manuel, Nuno Fernandes, Francisco Monteiro, Andrew Palangio, Blessing Taiwo
This study aims to enhance the integration between blasting and primary crushing operations in quarrying by optimizing the size of oversize and bypass fragments, ultimately reducing energy consumption
Jan 26, 2026
-
Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin
An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting
Feb 6, 2023