Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Construction of 10’ Diameter Shafts for the Olmsted Approach Walls ProjectBy Thomas G. Tavernaro, Jeffrey A. Schaefer
"The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci
Jan 1, 2006
-
Terminology and Evaluation Criteria of Crosshole Sonic Logging (CSL) as applied to Deep FoundationsBy Greg Canivan, Bernie Hertlein, Les Chernauskas, Joram Amir, Garland Likins, E. Anna Sellountou, Tim Kovacs, Peter Kandaris
Nondestructive testing of drilled shaft foundations via Crosshole Sonic Logging (CSL) is often performed as part of the quality assurance process to assess the soundness of concrete. The intent of CSL
Jan 1, 2019
-
The Aged Reloading Response Of Piles In ClayBy Paul Doherty
It is known that the axial capacity of a displacement piles installed in clay varies with time. Consolidation theory suggests that dissipation of porewater pressure set-up during pile installation wou
Jan 1, 2011
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Effect of Cold Joint on Behavior of Block Type Deep Mixing Improved GroundBy M. Kitazume, H. Imai
The deep mixing method was developed in Japan and put into practice in the middle of 1970s. Since then, the wet and dry type methods have been applied for various improvement purposes in Japan. One st
Sep 8, 2021
-
Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Evolution Of Helical Screw Pile Design And InstallationBy Michael Perlow
Helical screw piles in use since 1838 are routinely used for energy, transportation, municipal, industrial, marine and coastal infrastructure as well as for excavation support, environmental remediati
Jan 1, 2011
-
Automated Pile Load Test MonitoringBy Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line RepairBy Richard Brink, Eric M. Klein, Kenneth B. Andromalos
"A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that it resulted in the development of a large sinkhole in a resid
Jan 1, 2005
-
30 Hudson Street Foundation Design and Construction in Variable RockBy Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
Virginia Route 340 Bridges: Challenges in Karst TerrainBy Chaz Weaver, James Sheahan, Michael Mo
"The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto
Jan 1, 2017
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? SynopsisBy J. P. Burland
The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a
Jan 1, 2010
-
Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)By Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Rehabilitation of U.S. 70 Bridge over Lake HamiltonBy Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
10th International Conference On Piling And Deep Foundations: Amsterdam 2006 - Title ? Table Of Contents - Welcome Address From The Mayor Of Amsterdam, Job CohenIt is my great pleasure as mayor of the city of Amsterdam to welcome you today to Amsterdam, and to the 10th International Conference on Piling and Deep Foundations. The history of Amsterdam has b
Jan 1, 2006
-
Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)By Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in
Jan 1, 2007
-
Piling Framed Tie down Concrete Retaining WallBy Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins