Comparison Of Large Plate Load Test Result With Predicted Deformation In Deep Vibro Techniques Treated Ground For Iron Ore Stockpile Yard In VietnamBy Leong, William. Chong, Kam Weng
Deep Vibro Techniques namely Vibro Compaction (VC) and Vibro Replacement (VR) are widely used in ground improvement to densify sands and strengthen cohesive soils. This paper describes the application
Nov 1, 2022
-
Design And Performance Evaluation Of A Grouting Program In Weak Rock MassesBy George Moses K, Mahendran K
Grouting is performed in rock masses in order to increase its strength properties and also to reduce the seepage. In the design of underground structures such as tunnels or caverns located in weak roc
Nov 1, 2022
-
Response of Pile and Pile Groups against Excavation Induced Ground MovementBy K Ilamparuthi, R. K. Madhumathi
"This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was
Jan 1, 2015
-
Seismic Analysis Of Drilled Shafts As Earth Retaining Structure Based On Site CharacterizationBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan
During the last phase of the Circunvalacion Norte project in San Jose, Costa Rica, preliminary designs for an underpass structure of over 16 km (10 miles) considered drilled shafts as an earth retaini
Oct 1, 2022
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Execution of Pile Installation in Environmentally Challenging SitesBy Dena Morgan, Emre Biringen
"Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t
Jan 1, 2014
-
Hybrid Shoring System for a Deep Temporary ExcavationBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava
Jan 1, 2017
-
Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl TestsBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD
The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval
Oct 1, 2022
-
Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, LondonBy Shields H. Arup
The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi
May 1, 2022
-
Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2009
-
Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BCBy Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li
"Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu
Jan 1, 2015
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test DataBy Mahdi Soudkhah, Akhter Hossain
Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri
Jan 1, 2019
-
Behaviour Of Piled Raft- Importance Of Observational StudyBy Abhirami B., V. Balakumar
Piled raft foundation system is an intelligent geotechnical concept, developed towards reducing the settlement of the raft and the footings by providing pile elements below the raft or footings, as th
Nov 1, 2022
-
Remediation Of Rail Structures Impacted By Landslides Using Sleeved Bored PilesBy Paul Hewitt, Aaron Rastall
The New South Wales South Coast rail corridor is key infrastructure for both freight and passenger transport. Geomorphological and geological evidence suggests that land instability has been widesprea
Nov 1, 2022
-
Impact Of Groundwater Flow On Design Of Open Underground ExcavationBy Heman Manchanda, Sandeep Sharma
Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen
Sep 1, 2022
-
A Study On Performance Of Piles Based On Methods Of InstallationBy Babu K. V., Samyukta P.
The energy demand in India is expected to show increasing growth in the next few decades. The oil companies in India are revamping the existing oil refineries as well as constructing new refineries ac
Sep 1, 2022
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way LimitsBy Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall ConstructionBy Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022