    High-Capacity Driven-Pile Foundation for a 33-Story High-Rise in Milwaukee, Wisconsin, USA

    By Patrick J. Hannigan, William H. Walton, Ryan C. Rusk, Van E. Komurka

    "The project consists of a 33-story building with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engine

    Jan 1, 2017

  • DFI
    Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BC

    By Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li

    "An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized

    Jan 1, 2017

  • DFI
    High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary Foundations

    By Brian D. Barkauskas, Terence P. Holman

    A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr

    Jan 1, 2017

  • DFI
    Reverse Circulation Drilling (Rcd) Technology For Largediameter Piles

    By Nikolas Schmitz

    For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling

    Nov 1, 2022

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • DFI
  • DFI
    Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - Synopsis

    By Uwe Hess

    For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th

    Jan 1, 1996

  • DFI
    Real-Time Anchor Testing and Data Management

    By Bora Okumusoglu, Devon K. V. Mothersille

    "AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front

    Jan 1, 2017

  • DFI
    Case Studies Demonstrating The Effectiveness Of Vibroreplacement Stone Columns In Variable Soil Types

    By Lee R. Buhagiar

    As a result of the increased seismic risk and the highly variable geology of Christchurch, finding costeffective foundation solutions has been a challenge for the Canterbury rebuild. The soil profile

    Nov 1, 2022

  • DFI
    The Emerging Technology Of EHDE As Applied To Deep Foundations

    By Jerold Bishop

    The application of the ?electro-hydrodynamic effect? (EHDE) to civil engineering has been made in the construction of drilled piles. Equipment for the commercial application of this process was devel

    Jan 1, 2007

  • DFI
    Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility Tunnel

    By Amit Srivastava, Monica Malhotra

    In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through

    Sep 1, 2022

  • DFI
    Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle East

    By Brian Metcalfe, Kord Wissmann, Gianni Martinez

    The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large

    May 1, 2022

  • DFI
    Load And Resistance Factor Design Of Pullout Of A Single Driven Pile In Sands And Clays

    By Dongwook Kim

    Recently, load and resistance factor design (LRFD) is gradually being adopted internationally in geotechnical design due to the advantages of LRFD over the existing allowable stress design (ASD). LRFD

    Jan 1, 2010

  • DFI
    Lexicon Of Foundation Terms - Deep Foundations Institute Lexicon Of Foundation Terms

    [ENGLISH active earth pressure adapter additive adhesion admixture, addition adsorbed water aggregate air air entrainment air hose allowable bearing value allowable pile bearing l

    Jan 1, 1994

  • DFI
  • DFI
    Improvement Of Toe Resistance Of Drilled Shaft Foundations Using Smart Cells

    By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci

    A Smart Cell is a closed-type tip post-grouting device that is attached to the bottom of the steel reinforcement cage of a drilled shaft and is used to enhance performance and to reduce uncertainty th

  • DFI
    Repair Methods For Corroded Steel Piles

    By C. Vipulanandan

    With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but als

  • DFI
    Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial Sand

    By Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos

    "Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p

    Jan 1, 2017

  • DFI
    Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)

    By C. Vipulanandan, M. Dawood, Dongmei Pan

    "With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al

    Jan 1, 2017

  • DFI
    Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth Transitions

    By Michael Hughes, Selva Selvamohan, Ray Costa

    "Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back

    Jan 1, 2015