Pile Load Testing At JFK International Airport - SynopsisBy J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000
-
Compressive Behaviour of Hollow Core Micropiles in Cohesive SoilBy M. Hesham El Naggar, Osama F. E. Drbe
"Abstract: The use of micropiles has greatly increased the last twenty years, including applications involving low capacity micropile networks, seismic retrofitting, underpinning of existing foundatio
Jan 1, 2014
-
A New Method of Quality Control for Construction Joints in Diaphragm WallsBy Nikolaus Schneider
"Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta
Jan 1, 2014
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Reliability of the Bearing Capacity of Axial Piles Using In Situ TestsBy António A. Henriques, António Gomes Correia, Ana Teixeira
"Abstract Pile foundations are often used for important structures, and thus, reliability evaluation is an important aspect of the design. Reliability methods have become increasingly important as dec
Jan 1, 2014
-
Estimating N Value from Data in Press-In PilingBy Yukihiro Ishihara, Nanase Ogawa, Ming Lei
"Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro
Jan 1, 2014
-
Working Platforms In Geotechnical Jobs: Recommendations For Execution And MaintenanceBy Gustavo Armijo
Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha
Jan 1, 2006
-
Plastic PilingBy Magued G. Iskander
The deterioration of concrete, steel, and timber is a serious hindrance to construction in marine and corrosive environments. Composite materials such as fiber-reinforced polymers (FRP) can offer perf
Jan 1, 2002
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
Theoretical Examination of Initially Bent PilesBy Janne P. Isohaka, Anssi M. Laaksonen
"Abstract In Scandinavia the use of steel pipe piles in bridge foundations started in the mid-1980s and has increased steadily since. As the piles driven in soft soils are slender, they can fail by bu
Jan 1, 2014
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - SummaryBy Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
Deep Mixing Method: A Global PerspectiveBy Donald A. Bruce
Various types of contemporary Deep Mixing Method (DMM) techniques have been used in the United States since 1986. Such techniques owe their origins to Japanese and Scandinavian developments, which beg
Jan 1, 1998
-
The State Of The Art Of Jet Grouting In The United StatesBy George K. Burke
Jet grouting was first introduced into North America in the late 1970's, soon after the conception of the system in Japan. However, it was not until the mid-1980's that the technique began t
Jan 1, 2002
-
Railroad Bridge Approach Embankment Settlement MitigationBy Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery
Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate
Jan 1, 2018
-
Micropile And Soil Nail Load Transfer Rates In The Puget Sound Region Of Washington StateBy Carole L. B. Mitchell
The increased use of micropiles and soil nailing presents a growing database of verification and sacrificial load test data. In Washington State, the use of micropiles is becoming common, and soil na
Jan 1, 2006
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case HistoryBy Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
Analysis Of Piles Reinforced By Jet-Grouting MethodBy JO Choi
Jet-grouting method is a useful technique to reinforce foundations on relatively soft or vulnerable soil layers such as fractured zone and stratum with cavities. Although jet-grouting has been widely
Jan 1, 2006
-
Harmonization and Status of Geotechnical Standards in EuropeBy Trevor L. L. Orr
"AbstractThe background to the harmonization of geotechnical standards that has taken place in recent years in Europe has been the move to more economic and political integration following World War I
Jan 1, 2014
-
Reducing Downdrag Loads With BitumenBy J. -L. Briaud
This presentation shows the results of laboratory and field tests to date for the NCHRP project entitled "Downdrag on Bitumen-coated Piles". This project required to test a variety of bitumens in the
Jan 1, 1991
-
A Brand New Barrier Wall Installed at Wolf Creek DamBy Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014