    An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests

    By Hayel M. El-Naggar, Sherif A. Akl

    Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese

    Jan 1, 2018

  • DFI
    Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development Projects

    By K. Viking

    This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and

    Jan 1, 2013

  • DFI
    Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical Soil

    By Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa

    "Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating

    Jan 1, 2014

  • DFI
    Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus

    By Robert E. Fosse

    Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr

    Jan 1, 2002

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • DFI
    Geotechnical Investigation For Deep Foundation Projects In Shanghai Area ? Synopsis

    By E. R. Wang

    This paper outlines the engineering properties of shallow soil in Shanghai area. The main points that should be paid attention to during deep foundation investigation, and general conditions of experi

    Jan 1, 2010

  • DFI
    Design And Construction Of The Deep Stations For The Copenhagen Metro - Synopsis

    By David R. Beadman

    This paper discusses how modern techniques of design and construction were used to create the deep stations for the Copenhagen Metro. The deep stations are located in small squares within the city adj

    Jan 1, 2000

  • DFI
    Vibwall Installation - Cardiff Bay Barrage ? Synopsis

    By Graeme McWhirter

    This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe

    Jan 1, 2000

  • DFI
    Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • DFI
    Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The Netherlands

    By Klaus Pöllath

    The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri

    Jan 1, 2006

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • DFI
    Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant Structure

    By Tsunenobu Nozaki

    "AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr

    Jan 1, 2014

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • DFI
    Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) Wall

    By Allan Sylvester

    Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel

    Jan 1, 1997

  • DFI
    Formation Of Interlocking Jet Grout Columns At Large Depth

    By Chu E. Ho

    Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl

    Jan 1, 2008

  • DFI
    Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts

    By Harry Schnabel

    A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi

    Jan 1, 2011

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    Quality Control Of Augered Cast-In-Place And Displacement Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is

    Jan 1, 2002

  • DFI
    Design Of The Foundation Of Zhu Jiang Fanying High-Rise Building Complex ? Synopsis

    By A. F. Deng

    A general description of the project, mainly the pier foundation design of the ZHU JIANG FANYING is presented in the paper. The major contents include the foundation scheme, the evaluation of bed-rock

    Jan 1, 2010

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane