Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure Load

    By Don W. Dotson

    In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be

    Aug 1, 2013

  • DFI
    Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch Bridge

    By William Auyeung

    Micro-piles are small-diameter, drilled and grouted reinforced piles used for both structural support and in situ earth reinforcement. They were conceived in Italy in 1952, but have become popular in

    Jan 1, 2004

  • DFI
    Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer Approach

    By Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon

    "Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled

    Jan 1, 2005

  • DFI
    Dynamic Load Testing Of Non-Uniform Piles

    By Thai Nguyen Ph. D

    Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes

    Oct 1, 2022

  • DFI
    Nicholson In The Neighborhood: Virginia’S North Hill Project

    By Dominic Ammon, Mark Rothbauer, Paul Landers P. E.

    Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct

    Oct 1, 2022

  • DFI
    Design Of Ground Improvement By Inclined Dsm Columns For Railway Embankment (Türkiye)

    By Emre Turk, Suat Gullu, Candan Gokceoglu, Ahmet Sirri, Asli Can

    In this study, the ground improvement application applied under the live railway bridge's approach embankments in Sivas, Türkiye was investigated as a case study. The soil profile is mainly composed o

    Oct 1, 2022

  • DFI
    Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DST

    By Gerald Verbeek, Erick Baziw

    "Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit

    Jan 1, 2017

  • DFI
    Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)

    By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann

    Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and

    Sep 1, 2022

  • DFI
    Observing Friction Fatigue using High Strain Dynamic Pile Testing

    By Ronald Damen, Dion Denes

    "Friction fatigue is the loss of soil-pile friction around the shaft area of the pile. It has been observed during impact driving of piles, and has been modelled to a limited degree using physical sca

    Jan 1, 1900

  • DFI
    Soil Fatigue Analysis for Pile Driving Simulations Using an Impact Hammer

    By Peter Middendorp, David J. Tara, Gerald E. Verbeek, Jan Fischer

    "For pile driving simulation the model used must be accurate for the entire process, i.e. from the start of pile driving until the pile has reached its target depth. Of the various model components (h

    Jan 1, 2017

  • DFI
    D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls

    4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article

    Jan 1, 1989

  • DFI
    Design and Construction of Pile-Supported Mechanicallystabilized-Earth Slope Stabilization

    By Nasr Sheta

    "After Hurricane Sandy, the stability of an earth slope in the Atlantic Highlands, New Jersey in the United States was deteriorating due to slumping soils and erosion from flooding. A slope stability

    Jan 1, 1900

  • DFI
    Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case Study

    By Krishnendu Mandal

    "For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile

    Jan 1, 2015

  • DFI
    Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise Building

    By A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane

    Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha

    Jan 1, 2019

  • DFI
    Marine Clay Stabilisation Using An Encased Stone Column With Tyre Chips As Aggregates

    By Rangaswamy. K, Naga Sivaji

    A stone column is one of the most commonly employed methods of ground improvement techniques. This method used to increase the strength, decrease the compressibility of loose granular and finegrained

    Nov 1, 2022

  • DFI
    Laboratory Modeling of Internal Erosion in Dam Foundations

    By Kenneth E. Henn, David B. Paul, John D. Rice, Brian H. Greene

    "Several laboratory modeling programs have been conducted to investigate the mechanisms associated with internal erosion of dam embankments and foundations. The investigation consists of developing l

    Jan 1, 2016

  • DFI
    Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts

    By Michael Arnold, Jignyash Manyam, Yoav Rappaport

    The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun

    Oct 1, 2022

  • DFI
    Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s Perspective

    By A. David Miller, Chika Oya

    "Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi

    Jan 1, 2017

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021