    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Development Status of Thin, Spray-on Liners for Mining and Civil Engineering Applications

    By James F. Archibald

    Research has been conducted for the Workplace Safety and Insurance Board of Ontario (WSIB) to characterize thin, spray-on lining materials (TSLs), as well as combinations of TSLs and conventional spra

    May 1, 2006

  • CIM
    The Response of Cemented Backfill to Dynamic Loads from Field Observations and Split Hopkinson Pressure Bar Tests

    By J. C. Johnson

    Underhand mining with cemented mill tailings for backfill has proven to be a safe and effective alternative to conventional overhand mining for rockburst prone mines. The ability of the cemented sand

    May 1, 2007

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard Mine

    By Véronique Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling

    May 1, 2003

  • CIM
    Precious-Metal-Bearing Volcanogenic Massive Sulphide Deposits, Campo Morado, Guerrero, Mexico

    By Robert Cluff

    The Campo Morado precious-metal-bearing, volcanogenic massive sulphide district occurs in a Lower Cretaceous felsic volcanic sequence in a northerly trending belt in the Guerrero Terrane in northeaste

    May 1, 2006

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009

  • CIM
    Interactions between Slurry Density and Grinding Media Size

    By Claude Bazin, Patricia Obiang

    "The slurry density (pulp percentage of solids) and the size of the grinding media are often used for the optimization of an operating ball mill. In many cases a change of ball size is made at the slu

    Jan 1, 2007

  • CIM
    Evaluating the Applicability of Gold Pre-Concentration by Sensor Based Sorting of Quartz Ore

    By A. Takala, B Nielson, J. Schunicht

    "Pre-concentration in minerals processing presents clear advantages in energy efficiency, water efficiency, reduction of consumables and minimization of capital and operating costs. Outotec’s sorting

    Jan 1, 2017

  • CIM
    Use of the Enviro-Clear Thickener at Quirke Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt

    Jan 1, 1977

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • CIM
    Geostatistical simulation of optimum mining elevations for nickel laterite deposits (b9d9907f-58af-4f31-a4f0-796631528f37)

    By J. A. McLennan, J. M. Ortiz

    Nickel laterite deposits are typically formed from tropically weathered mafic-to-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular doz

    Jan 1, 2006

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    Where Did that Earbud Come From? Current Rare Earth Production Facilities

    By J. R. Goode

    Rare earth elements (REE) and their compounds are critical ingredients in numerous necessities of modern life including: the permanent magnets used in electric motors, generators, speaker and hard dri

    Jan 1, 2016

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Ball Charge Dynamics and Liner Wear Simulation

    By Peter Raziszewski

    "A ball charge dynamics model is presented. Simulation results are compared with observed data showing good correlation. Based on the charge dynamics models, a liner wear model is presented along with

    Jan 1, 1997

  • CIM
    A new approach to waste dump site selection according to the fuzzy decision-making process

    By F. Samimi Namin

    During the process of developing surface or underground mines, some sites are considered for dumping of surface soils, while others are applied to reclaiming surface and waste disposal. For each kind

    Jan 1, 2007

  • CIM
    Violence Per Ounce: Is There a Correlation Between Mineral Values and Conflict Intensity?

    Despite the fact that mined minerals and gemstones have allowed human beings to continuously improve their standard of living throughout the ages, mining has also been implicated in violent conflict f

    Aug 1, 2013