Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Field Assessment of the SIUC Innovative Spray System for Continuous Miners

    By Yoginder P. Chugh

    Beginning in 2010, a scientifically-founded water spray system for continuous miners (CMs) has been in development at Southern Illinois University that significantly reduces respirable dust exposure f

    Aug 1, 2013

  • CIM
    Blast Improvements at the EKATI Fox Pit

    By Dwayne D. Tannant

    The Fox Pit at EKATI Diamond Mine reached a depth of approximately 150 m as of September 2005. The pit is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high

    May 1, 2006

  • CIM
    Use of microscoop in narrow stope mining

    By F. Lambert

    "Amok Ltd./Cluff Mining operates a uranium mine at Cluff Lake in northern Saskatchewan. The project consists of one open pit and one underground mining operation along with a full-scale milling instal

    Jan 1, 1990

  • CIM
    The Development of the 'Dosco Miner

    By F. Doxey

    Introduction In order to improve outputs and to reduce or hold mining costs, many attempts have been made to mechanize the getting and loading of coal in the major coal producing countries, and machi

    Jan 1, 1951

  • CIM
    The Influence of the Anode Inclination on the Hydrodynamics of the Hall-Heroult Cell

    By L. I. Kiss, S. Perron, D. Toulouse, S. Poncsák, A. Perron

    Bubbles play an important role in many industrial processes. In a Hall-Heroult cell, used for aluminum production, bubbles contribute to induce flow in the cell. The induced flow is important for the

    Jan 1, 2006

  • CIM
    Slurry Pumping at Inco Metals Company (Ontario Division)

    By J. E. Lee

    "This paper describes the current practices and experiences, and discusses design parameters concerning slurry pumping at Inco Metals Company in the Sudbury District. It deals mainly with the long tai

    Jan 1, 1978

  • CIM
    Mineralogy of the Ross Veins, Ramore, Ontario

    By W. A. Jones

    THE Ross mine, a subsidiary operation of Hollinger Consolidated Gold Mines, Limited, is situated near the north end of lot 1, concession 2, Hislop township, Ontario. The property comprises the north h

    Jan 1, 1944

  • CIM
    The Geology and Mineralization of the High Lake Volcanic-hosted Massive Sulfide Deposit, Nunavut

    By C. A. Petch

    Abstract - The High Lake polymetallic deposit is located in the northern Slave province, 40 km south of Coronation Gulf, Nunavut. The main zone, the AB zone, hosts an estimated resource of 3.56 Mt gra

    Jan 1, 2004

  • CIM
    Determination of High Concentration Rare Earth Elements in Metallurgical and Geological Samples Using Inductively Coupled Plasma Mass Spectrometry

    By A. Dunnett, N. J. Turner, J. Koyanagi, M. Ji

    The analysis of rare earth element (REE) samples is a necessary part of the metallurgical process for rare-earth bearing ores, providing invaluable information during testing procedures. This requires

    Jan 1, 2014

  • CIM
    Autonomous Thin Spray-on Liner Application in Irregular Tunnel and Mine Roadway Surfaces

    By M. P. Tibbs

    An autonomous spray application system for a structural Thin Spray-on Liner (TSL) is targeting productivity and safety on underground coal continuous miners by potentially replacing steel mesh, and ha

    Aug 1, 2013

  • CIM
    Chapter III-Continued PART 7. - Sudbury Area - Regional Structure of the Lake Huron-Sudbury Area

    By H. C. Cooke

    "This paper has reference in a general way to the region extending from the north shore of lake Buron to the northern limit of the elliptical-shaped area generally known as the Sudbury Basin, and more

    Jan 1, 1954

  • CIM
    Aspects of Sustainability Following Closure of the Steep Rock Iron Mines, Ontario

    By Victor A. Sowa

    "Abstract - In 1938, a body of goethite and hematite was discovered beneath Steep Rock Lake near Atikokan, northwestern Ontario. This was at the time the largest and richest undeveloped iron ore body

    Jan 1, 2003

  • CIM
    Integrating Work Index into Mine Planning at Large Scale Mining Operations

    By Jose A. Caceres

    Mine planning and mineral processing optimization are usually treated as two unconnected problems, especially at open pit and panel caving mines where the cut-off grade is practically the only variab

    May 1, 2004

  • CIM
    Méthode hybride de minage long trou et récupération de piliers de niveau dans les chantiers de la mine Géant Dormant

    By Patrick Chabot

    Ce document présente une méthode hybride de long trou favorisant une méthode de minage initiale par chambre-magasin et complétée par une méthode de minage long trou. Cette méthode a été adaptée suite

    Feb 1, 2008

  • CIM
    The Renard Diamondiferous Kimberlitic Bodies, Quebec

    By Tyson C. Birkett

    Initial indicator mineral sampling covering 425,000 square km of northern Quebec and subsequent follow-up of positive results convinced the Ashton ? SOQUEM joint venture to acquire mineral rights to 3

    May 1, 2003

  • CIM
    AC Drive System with Active Front End (AFE) for Mining Excavators

    By Walter Koellner

    Today?s large electric mining shovels are significant users of power and represent peak loads of more than 3.5 MW to a mine?s distribution system. The power swings during normal operation can influenc

    May 1, 2001

  • CIM
    Impressed Current Cathodic Protection of Pipeline

    By H. Houali

    Corrosion is an electrochemical process that causes degradation and deterioration of various steel works (pipelines, drains, cisterns) whether they are buried, immersed, or not. Worldwide, we estimate

    Jan 1, 2005

  • CIM
    Processes, Information Requirements and Challenges Associated With Corrective Maintenance in Relation to Indoor Air Problem Related Work Orders

    By Xue Yang

    Even though many approaches have been proposed for automated fault detection and diagnosis of Heating Ventilation and Air Conditioning (HVAC) systems, and advanced maintenance programs, such as preven

    Aug 1, 2013

  • CIM
    Carbon-in-Pulp and Carbon-in-Leach Adsorption Circuits -Optimization of Design Using the Carousel System

    By N. Morrison, E. J. Rogans, A. J. Macintosh, N. Schoeman

    "The design of carbon-in-pulp (CIP), and carbon-in-leach (CIL) adsorption circuits has essentially remained unchanged since the early days of the carbon process for gold recovery. For CIP circuit the

    Jan 1, 1998

  • CIM
    Electrostatic separation circuits

    By Diego L. Romero, Joy P. Romero

    "IntroductionThe purpose of this paper is to explain the theory and demonstrate the industrial applications of electrostatic separation. Wabush Mines' use of this type of processing for the concentrat

    Jan 1, 1989