Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Consolidated rockfill optimization at Kidd Creek Mines

    By Parviz N. Farsangi, Ferri P. Hassani, Allen G. Hayward

    "Kidd Creek Mines places approximately 10 000 tonnes of consolidated rockfill (CRF) daily. Consolidated rockfill comprises sized aggregate mixed with different ratios and amounts of binders. Consolida

    Jan 1, 1996

  • CIM
    Development of the Heavy Minerals Potential of the Athabasca Tar Sands

    By Lloyd W. Trevoy

    Titanium and zirconium heavy minerals occur in the tailings streams from processing plants which use the hot-water extraction process for recovery of bitumen from tar sand. In a research program cond

    Jan 1, 1978

  • CIM
    Mining At Noranda (69fba177-b419-47b0-a3c4-b02c2dfc83f3)

    By Oliver Hall

    WITH the friendly consent both of the Institution of Mining and Metallurgy, for whom this paper was written, and of the author, we had the pleasure of publishing Mr. Oliver Hall's paper on Mining

    Jan 1, 1937

  • CIM
    Planning and Operation of Gaseous Mines

    By A. J. Hargraves

    "It is difficult to quantify comparatively the gassiness of a property. The most common index to gassiness, cubic feet of gas per ton of coal mined, is very arbitrary and does not take into account th

    Jan 1, 1973

  • CIM
    Au/SiO2/Si(100) and Fe2O3/Au/SiO2/Si(100) Model Nanosystems: Size Effect on Electron Structure and Catalytic Activity in CO Oxidation

    By László Guczi1

    Nanosize model gold particles with varying size were fabricated by deposition of a 10 nm thick gold film onto SiO2/Si(100) substrate by electron beam evaporation followed by modification using low ene

    Oct 1, 2003

  • CIM
    Interactive tools for learning basic geostatistical concepts

    By A. Vervoort, A. Govaerts

    Geostatistical concepts are often difficult for students to understand, even those with a strong mathematical background. One of the main problems is the link between the variation of the parameter va

    Jan 1, 2014

  • CIM
    Lead Blast Furnace Feeding at Cominco

    By E A. Mitchell

    In the fall of 1961, Cominco dis-carded its long-established system of feeding the lead blast furnaces by narrow-gauge tram and V-cars, and installed an elevated monorail bucket system. This system au

    Jan 1, 1963

  • CIM
    Preparations for, and Early Action in, the Preservation of Life at the Time of a Mine Fire

    By G. Reuben Yourt

    This paper consists of two main parts. The first, under the heading Preparations, deals with suggested preparations to be carried out in advance so that loss of life might be prevented should a fire o

    Jan 1, 1947

  • CIM
    Developing Visualized Schedules for Plant Information Modeling

    By B. Leonard

    As of November 2012, the Alberta government listed 53 oil and gas, oil sands, and mining construction projects either proposed or currently under construction. These industrial plant construction proj

    Aug 1, 2013

  • CIM
    L'entretien de I'equipement minier dans les mines à ciel ouvert

    By Gaston Gingras

    "IntroductionL'entretien de l'equipement minier dans les mines à ciel ouvert est une activité qui est aussi vieille que I'existence des mines et qui a progressé au cours des années pour

    Jan 1, 1988

  • CIM
    Financial and Geomechanical Optimization for Mine Pushbacks

    By M. Grenon

    OBJECTIVE ?To link slope stability and financial assessment algorithms into a commercially available mine design software packages to provide integrated global pit optimization.

    May 1, 2013

  • CIM
    Fast PB Process: Plating Lead at 10,000 A/M2

    By M. Maccagni, J. Nielsen

    "The recovery of lead from battery paste has been investigated for a long time and with the use of many different electrolytes. A number of processes have been presented, but none of them reached even

    Jan 1, 2016

  • CIM
    Pneumatic Backfilling With Crushed Rock at the Sullivan Mine

    By J. W. Reynolds

    Use of crushed waste rock recovered by sink-float separation from normal ore production for backfill is an established procedure at Commco's Sulhvan mme, Kimberley, British Columbia. Need for a safe m

    Jan 1, 1972

  • CIM
    Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design

    By R. J. Rotzinger

    The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du

    Jan 1, 2012

  • CIM
    Profitable Production: Nevada's First Paste Backfill Plant

    About Barrick Paste Backfill at Barrick Goldstrike Rodeo Paste Plant Cyclone Lab Testing Challenges and Lessons Learned Future Barrick Projects

    May 1, 2013

  • CIM
    Government Versus Voluntary Sediment Pond Design Standards and Achieving Discharge/Receiving Water Quality for Total Suspended Solids at Mine Sites

    Keeping the sediment on the mine site and out of the water course is essential from the regulatory, environmental and sustainability perspectives. Regulation of this aspect of mining is embedded in en

    Aug 1, 2013

  • CIM
    Canada's coal resources in an international setting

    By A. Ignatieff

    "THE WORLD'S coal resources represent the largest component of non-renewable energy resources. Coal is now regaining Its position following a temporary decline, particularly in North America during a

    Jan 1, 1985

  • CIM
    Internal Micros train and the Deformation and Failure of Metals: 1.- The Possibilities of Using the Correlation between Internal Microstrain and Magnetic Properties in the Study of Metal Failure

    By P. Cavanagh

    Summary This paper discusses the fundamental principles which allow the development of a new method for studying the deformation and failure of metals in terms of 'internal microstrains'.

    Jan 1, 1950

  • CIM
    Red Lake Area of Patricia

    By E. L. Bruce

    Red lake is a body of water some thirty miles in length lying about forty miles northwest of the outlet of Lac Seul. It forms one of several large lake expansions on a river which enters the English r

    Jan 1, 1926

  • CIM
    Implementation of APC at Freeport-Mcmoran’s (FMI) Morenci Metcalf Concentrator

    By A. Supomo, H. Resendiz, C. Burbidge

    "Freeport-McMoRan Inc. (FMI) commissioned the expansion of the Morenci Metcalf concentrator in 2014. The concentrator included many design and equipment innovations, including the first-of-its-kind Me

    Jan 1, 2019