Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Magdalen Islands salt deposits

    By Marcel Vallee, D. C. Gagnon, C. CARBONNEAU, P. ST-JULIEN

    The Magdalen Islands archipelago, a cluster of fifteen islands, is located near the centre of the Gulf of St. Lawrence on the thickest portion of the Carboniferous Fundy Basin of the Maritime Pro vinc

    Jan 1, 1984

  • CIM
    The Uncertainty Modeling Process

    By Jason Mewis

    Jason Mewis is the founder and president of ENGCOMP, a consulting engineering firm in Saskatoon Saskatchewan focusing on the mining sector. He has over 17 years of experience working on projects for t

    May 1, 2013

  • CIM
    Large-scale treatment of a concentrated cyanide waste solution by acidification

    By P. A. Riveros, R. Molnar, F. J. Baša

    "An acidification circuit was installed and operated at the Agnico-Eagle Silver Division refinery in Cobalt, Ontario, for treating ~300 m3 of a concentrated cyanide waste solution with the purpose of

    Jan 1, 1998

  • CIM
    Field Trials of a Shaft Conveyance Monitoring System

    By Michael J. Beus

    The National Institute of Occupational Safety and Health-Spokane Research Laboratory (NIOSH-SRL) have developed a Shaft Conveyance Monitoring System (SCMS). Assessment of current hoisting technology h

    May 1, 2001

  • CIM
    The Dissolution Rate of Fresh and Passivated Chalcopyrite Electrodes in the Presence of Pyrite

    By O. G. Olvera, D. G. Dixon, E. Asselin, L. S. Quiroz

    Dissolution rates of chalcopyrite (CuFeS2) were calculated using electrochemical impedance spectroscopy (EIS). The calculated dissolution rate decreased by a factor of 3.2 after the electrode was pass

    Jan 1, 2014

  • CIM
    Centralizing Maintenance Resources in Mining Operation

    By Pedram Sahba

    In today?s emerging economy, pooling resources is a growing trend to reduce overall system costs. Two important resources of every maintenance department are repair shops and spare parts. In this work

    May 1, 2013

  • CIM
    Scientifically Difficult and Challenging Issues in Chinese Rock Engineering

    By P. Lin, S. G. She

    "In June 1985, Chinese Society for Rock Mechanics and Engineering (CSRME) was established. During the past 30 years, various major achievements are made in the discipline of rock mechanics and rock en

    Jan 1, 2015

  • CIM
    Wall Control Techniques at Inco's Pipe Open Pit

    By J. Janeson

    Wall control at the Pipe Open Pit is of primary importance in ensuring the long-term stability of the operation, while keeping costs to a minimum. Blasting techniques have been adapted to the variatio

    Jan 1, 1979

  • CIM
    Laboratory Simulation of Induced Seismicity

    "Successive seismic waves may cause progressive weakening of a fault zone, which has been recognized as the mechanism of earthquake aftershocks. However, it is unclear that how a fault zone slips unde

    Jan 1, 2015

  • CIM
    Elimination of Lead and Cadmium by the Fluid Column Process at Sherbrooke Metallurgical Co.

    By R. F. Neider, W. R. Bain

    "Expanding upon one aspect of a recent paper on ""Fluid Column Roasting at Sherbrooke Metallurgical Co. Ltd.,"" the present paper deals with the operation of the fluid column process to achieve substa

    Jan 1, 1967

  • CIM
    The Effectiveness of Different Methods of Methane Drainage for Selected Longwall of Katowice Coal Holding

    By R. Loj

    Katowice Coal Holding (KHW) is one of the largest coal companies in Europe. The company owns five coal mines with a daily output of around 60 000 tons of coal. In the Katowice city area, very good qua

    Aug 1, 2013

  • CIM
    Creative Options for Development of New Metallurgical Processing Technologies

    By R. H. Schonewille

    One of the many challenges in developing new metallurgical processes is choosing the best option for validating process design parameters and establishing the process operating window. Historically th

    Jan 1, 2011

  • CIM
    3-Dimensional Numerical Modelling of Stope Sequencing for Mine Planning

    There are many inherent risks in creating a mine plan for a new ore zone in an underground mine; one of such risks is the redistribution of stresses that could be a cause of instability. Using numeric

    May 1, 2009

  • CIM
    Real-Time as-Built Tunnel Product Modeling and Visualization by Tracking Tunnel Boring Machines

    By X. Wu

    Tunnel Boring Machines (TBMs) are widely used for tunneling in urban areas because of their high advance rate, precise as-built profile and minimal impact to buildings and traffic on the ground. For a

    Aug 1, 2013

  • CIM
    The Dynamic Evolution Behaviours of the Mining Induced Fissure Elliptic Paraboloid Zone and its Application

    By Shugang Li

    Coal and coal-bed methane are valuable energy resources. If they can be extracted simultaneously and safely, the triple purposes of mine safety production, new energy resource supply and environmental

    Aug 1, 2013

  • CIM
    Comparison of Two Failure Criteria for the Assessment of Haulage Drift Stability Using Stochastic Analysis and Numerical Modelling

    By Wael Abdellah

    Mine haulage drifts are the primary access to the mining blocks of an orebody in a multilevel mining system of a tabular ore deposit. The stability and functionality of haulage drifts are thus crucial

    Jun 1, 2012

  • CIM
    Ross Mine

    By W. A. Jones

    "The Ross mine, a subsidiary operation of Hollinger Consolidated Gold Mines, Limited, is near the north end of lot 1, con. II, Hislop tp., Ontario. The property comprises the north half of lot 1, con.

    Jan 1, 1954

  • CIM
    Some Pre-Cambrian Rocks in Northern Quebec

    By James H. C. Martens

    Among the many interesting problems of the pre-Cambrian of the Canadian Shield is that of the origin of certain types of gneisses which are intimately associated with the granites on the one hand and

    Jan 1, 1927

  • CIM
    Numerical Simulation of Accumulated Damage in Critical Mine Infrastructure and Prediction of Further Damage Over Mine Life

    By Kathy S. Kalenchuk

    Damages have been observed in shafts, backfill infrastructure and the slick line at the Leeville Mine. Shaft damage (shearing and spalling of the concrete liner) is attributed to mine-induced rock mas

    Jun 1, 2012

  • CIM
    "Numerical Simulation of the Mode-I Fracture Toughness Measurement via Cracked ChevronNotched Semi-circular Bend Rock Specimens"

    By N. W. Xu, M. D. Wei, F. Dai, B. Li

    "Chevron notched samples achieve general acceptance for measuring the Mode-I (opening mode) fracture toughness of rocks. The cracked chevron notched semi-circular bending (CCNSCB) sample, which is dev

    Jan 1, 2015