BLASTCAD - Noranda's three-dimensional computer-aided underground blast design systemBy P. Favreau
"This paper describes the progress accomplished at the Noranda Technology Centre in the field of three-dimensional computer-aided underground blast design. Traditional methods of laying out undergroun
Jan 1, 1993
-
Research and the Coal Industry in CanadaBy W. A. Lang
Introduction That the coal industry has entered a new phase in its development is now evident. Coal, besides being the chief source of heat and power, has become a potential raw material for many i
Jan 1, 1946
-
Arctic mineral wealth: Equitable participation with aboriginal landowners — a slow or fast process?By Donald E. Wakefeld
"The pace at which mining will occur in Northern regions and Arctic lands will depend on the answers to a number of questions. Who are the local aboriginal participants? What land uses are they pursui
Jan 1, 1996
-
Mining Geology of the Vipond Gold Mine, Porcupine District, OntarioBy E. Y. Dougherty
Introduction As practised during the last two years at the Vipond Consolidated gold mine, mining geology has meant the application of geology to the problem of finding, developing, and mining ore. Th
Jan 1, 1934
-
Electrochemical Kinetics of Ferric/Ferrous Reduction-Oxidation on SphaleriteBy F. Rashchi, A. Ghahreman, J. Moghaddam, S. Karimi
"In this work, the kinetics of ferric-ferrous redox reaction on a passivated sphalerite electrode is studied by the application of chronoamperometry method in 0.5 mol L-1 H2SO4 solution. The electroch
Jan 1, 2017
-
Mechanism of Scorodite Formation at Ambient Temperature as Determined by Tem AnalysisBy H. Itou
A mechanism of scorodite formation at ambient pressure was investigated using transmission electron microscopy (TEM). Several types of iron arsenate were obtained from Fe/As solutions (Fe/As = 1.0 and
Jan 1, 2006
-
Monitoring Insights from a Ventilation on Demand Collaborative Research InitiativeBy Stephen Hardcastle
Presentation Outline ? Introduction ? Mine Ventilation Facts ? Ventilation-on-demand (VOD) ? Sensors/Controls ? Continuing Work ? Conclusions ? Mine ventilation engineering practices were publ
Nov 1, 2011
-
Case study of a hoisting facility upgradingBy D. C. Brady
"Within six months from award of a project management contract, Les Mines Dumagami Limitée, Cadillac, Quebec, was operating its new hoisting facility. This was accomplished with less than a six-week s
Jan 1, 1991
-
Obtaining Ammonium Ortomolybdate from Erdenet LLC Molybdenum ConcentrateBy J. Oyunaa, P. Munkhbaatar, A. Sarnai
"The molybdenum mining process used at Mongolia Erdenet Company is a selective flotation of molybdenite from the copper porphyry ores in which the extraction of molybdenum comes as a byproduct of the
Jan 1, 2016
-
Creep of Mg-AlloysBy W. Blum
Progress made in improving the creep resistance of Mg alloys is reviewed with the emphasis on microstructural interpretation. Experimental results on the increase of creep strain with time at constant
Jan 1, 2006
-
Balance of Feed Split to Ball Mills in ParallelBy E. You
The concentrator at Kennecott Utah Copper currently has 4 lines with a configuration of one SAG mill feeding two ball mills. The slurry that reports to each ball mill will vary resulting in an unequal
Jan 1, 2007
-
The Underground Power Plant at GranducBy J E. McMynn
The development of the Granduc mine presents a number of problems which are peculiar to its location and surrounding terrain. Because the development tunnels portal onto an area which is covered by an
Jan 1, 1963
-
Closing of a Goethite Pond at Umicore Balen, BelgiumBy P. Mengé
The covering of a hydraulically filled goethite pond is discussed from a geotechnical point of view. The characteristics of the goethite were defined in order to allow a detailed study of the procedur
Jan 1, 2006
-
Surface Temperature, Rock Temperature and The Rate of Heat ExchangeBy R. W. Thompkins
MINE operators are concerned with temperature conditions in their mines, particularly the effects of high temperatures on the l1ealth and efficiency of tl1eir employees. This paper is written to focus
Jan 1, 1962
-
The Tectonic, Magmatic and Mineralization History of the Sudbury Structure (4c0ad050-3f5c-4d02-9b1c-381b1fa8e9bb)By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson
"The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of shatter-coned
Jan 1, 1997
-
Latest Developments with Copper Isasmelt?By P. S. Arthur
The copper I SAS MELT? process is a submerged lance bath smelting technology. In the 20 years since the process was first demonstrated on a semicommercial scale at Mount Isa in north-west Queensland,
Jan 1, 2007
-
The Respirable Dust Concentration Information Transmission Method Based on Led Light EquipmentBy C. R. Tang
The respirable dust real-time monitoring equipment export information is complex, and electromagnetic wave wireless transmission is affected largely under mine conditions. The respirable dust concentr
Aug 1, 2013
-
Geology and exploration history of the Lone Gull propertyBy H. Fuchs, W. Hilger, E. Prosser
"The Lone Gull discovery of Urangesellschaft Canada Limited was made in 1974 as a result of extensive exploration activities for unconformity related uranium deposits in the Baker Lake area of the Nor
Jan 1, 1986
-
The Tectonic, Magmatic and Mineralization History of the Sudbury StructureBy Harold L. Gibson, Don H. Rousell, Ian R. Jonasson
"Abstract - The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of sh
Jan 1, 1997
-
Problems Involved In Shutting Down a Mill on Week-Ends and HolidaysBy Gordon. I. M., J. Blackshaw
"The wet part of the Hollinger mill is housed in two buildings, the grinding plant and the treatment plant. In the grinding plant there are four 7xl5 ball mills which grind the ore to 60 per cent thro
Jan 1, 1968