Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Malartic Gold District, Abitibi Greenstone Belt, Quebec: geological setting, structure and timing of gold emplacement at Malartic Gold Fields, Barnat, East-Malartic, Canadian Malartic and Sladen Mines

    By Claude Hubert, Robert Sansfaçon

    "The Malartic gold camp includes the Malartic Gold Fields, Barnat, East-Malartic, Canadian Malartic and Sladen mines. From 1935 to 1984, these mines have yielded 212 403 kg of gold. They occur within

    Jan 1, 1990

  • CIM
    Performance Prediction of Rock TBMS Considering Uncertainties in the Geotechnical Parameters

    By G. V. Theja, V. B. Maji

    Large infrastructure projects like tunnel excavations, underground constructions face innumerable risks. For successful completion of these projects, it is essential that we foresee and understand ris

    Jan 1, 2015

  • CIM
    Mapping Sandstone-hosted Lead Deposits at Yava, Nova Scotia, by Ground EM Methods

    By Ajit K. Sinha

    "Abstract - Electromagnetic surveys were conducted over the Yava sandstone-hosted lead deposit in Nova Scotia to evaluate the usefulness of such surveys for detecting and mapping sedimentary­ hosted m

    Jan 1, 1993

  • CIM
    Toward Optimum Value in Underground Mine Scheduling

    By P. G. Dunn, J. Fitzgerald

    ABSTRACT The scheduling of underground mining activities is a complex task that must simultaneously satisfy a large number of constraints. A schedule optimization tool (SOT) for underground mine plann

    Jan 1, 2010

  • CIM
    Insurability of Unknown Postclosure Liabilities

    By C. Kunze

    ABSTRACT Although closure sureties cover works that are carried out during the existence of a mining company, certain liabilities are not known when the surety is established and become apparent only

    Jan 1, 2013

  • CIM
    Impurity Effects on the Synthesis of Crystalline Scorodite

    By M. Abumiya, N. Onodera

    "The synthesis of large scorodite particles in non-ferrous metallurgical industries usually requires a high-cost operation involving heating and high-pressure autoclaving. To overcome these obstacles,

    Jan 1, 2012

  • CIM
    A Brief Summary of the Development of the Sponge Iron Process

    By Edward P. Barrett

    Iron ore, when subjected to reducing gases at a temperature suitable for reduction of the oxide but not high enough to melt the ore or metal formed, is converted into metallic iron. The product, being

    Jan 1, 1925

  • CIM
    Study of the Inert Anode for Al Electrolysis Based on Nickel Ferrite Cermet Com 2015 - 54th Annual Conference of Metallurgists Held in Conjunction with AMCAA - America's Conference on Al Alloys

    By Yihan Liu, Jintao Zhang, Chen Xiao, Xiaomeng Zhao, Guanglei Song

    To estimate the performance of the inert anode materials based on NiFe2O4 spinel ceramic during it used for aluminum electrolysis, we investigated the wetting process of cryolite molten salt which is

    Jan 1, 2015

  • CIM
    Long distance commuting in the mining industry: a wife's point-of-view

    By Joanna LaForte

    "IntroductionIn respect to The Human Dimension by M. Phyllis Bray, this author's impression is that research on long distance commuting (LDC) is long overdue. This type of mining is not new to ma

    Jan 1, 1991

  • CIM
    A Technical Investigation of Northern Ontario Lignite

    By C. Tasker

    Introduction In the Early part of 1930 the Ontario Research Foundation was asked by the Minister of Mines, the Hon. Charles McCrea, K.C., M.P.P., to undertake a technical and economic investigation o

    Jan 1, 1933

  • CIM
    Methods to Reduce the Environmental Hazards of Mining and Processing of Minerals in the Arctic Regions

    By P. V. Amosov, V. A. Masloboev, D. V. Makarov, S. G. Seleznev, A. A. Baklanov

    "The development of industry and intensive use of natural resources leads to a significant decrease in the share of reserves of rich ores, deposits of which have nearly all been exploited. Large amoun

    Jan 1, 2016

  • CIM
    Sampling density and grade control

    By P. Groleau, O. Tavchandjian, D. Marcotte

    In open pit mining, each small mining unit (SMU) is selected for mill processing based on an estimate of its true grade. The estimation is usually done using analyses of cuttings from blast holes with

    Jan 1, 1998

  • CIM
    Investigation of KCI Crystal/Nac1-KCI Saturated Brine Interface and Octadecylamine Deposition with the use of Atomic Force Microscopy

    By N. Schreithofer

    The deposition of octadecylamine (ODA) at the KCI crystal/NaCI-KCI brine interface was investigated using atomic force microscopy (AFM). The AFM images of freshly cleaved KCI specimens immersed in KC

    Jan 1, 2006

  • CIM
    Electrodeposition Behavior Of Dendritic Copper From Aqueous Copper(I) Chloride Solutions Containing Condensed Sodium Halides

    By K. Murase

    Potentiostatic electrodeposition behavior of dendritic copper from acidic copper(I) chloride (cuprous chloride) baths containing sodium chloride and sodium bromide was investigated. The morphology, or

    Jan 1, 2007

  • CIM
    The Mechanical Properties of Gas Shale under Uniaxial Stress

    By Xiaoqiong Wang, Daobing Wang, Fanbao Meng, Jianbo Wang, Hongkui Ge

    "Shale gas has become an important unconventional oil and gas resources. Its effective development relies on comprehensive and accurate understanding of shale gas reservoirs. Rock mechanical propertie

    Jan 1, 2015

  • CIM
    A methodology for rock mechanics feasibility studies

    By Dave Ecobichon, Éric Côté, Simon Nickson, Michel Leclerc

    The feasibility assessment of a mineral deposit requires the construction of a geo mechanical model of rock mass properties, for the purpose of preliminary mine design. The Noranda Technology Centre h

    Jan 1, 1996

  • CIM
    The Ecstall Story: The Open-Pit Mine

    By George C. Coupland

    "THE PRELIMINARY EVALUATION of the orebodies was computerized for tonnages and grades on a 20- by 20-ft grid. The evaluation was based on drill-core intersections over 40-ft vertical projections coinc

    Jan 1, 1974

  • CIM
    Aeroprospecting in the Yellowknife Area

    By A. W. Jolliffe

    AEROPROSPECTING may be defined as the application of the air view to the search for mineral deposits. The term is suggested as a preferable alternative to either aerial prospecting (which may be confu

    Jan 1, 1945

  • CIM
    Gold Solubility in Smelting Slags for the Recycling of Industrial and Mining Wastes

    By Joo Hyun Park, Hyun-Sik Park

    "Gold is one of the most valuable and precious metals. But, the extraction efficiency of gold from natural resources is very low and labor-intensive due to very low concentration of gold, i.e.,1–5 ppm

    Jan 1, 2017

  • CIM
    Modelling of Cracking in Concrete Tunnel Lining by Continuous-Discontinuous Approach

    By J. L. Feng, F. Zhang, S. K. Hu

    "Cracking is one of the most serious damages in tunnel linings, which is often observed by in-situ inspection to tunnel engineering. It is difficult to better characterise for the deformations from co

    Jan 1, 2015