Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Biological Monitoring and its Use in the Mining IndustryBy S. W. Stogran
"Chemical and limited biological monitoring of mine and mill effluents are being used by regulatory agencies to monitor and control discharges to the environment. Amendments to the Federal Fisheries A
Jan 1, 1994
-
The Highmont Concentrator StartupBy R. S. Fukuhara, M. J. Allan
"Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the
Jan 1, 1982
-
Rock Mechanics Aspects of the Use of Underhand Cut-and-Fill Paste Sill Pillars: Case StudiesBy Paul Hughes
This paper summarizes current underhand paste backfill mining as applied to Goldcorp Inc?s Red Lake Mine, Newcrest Mining Ltd?s Kencana Mine and the Lanfranchi Nickel Mine as well as ongoing research
May 1, 2011
-
Evolving Equipment Health, a Rio Tinto Case StudyBy Daniel D. M. Adams
Over the last 100 years industry in general has been trying to advance the ability to maintain systems through management processes. Mining has looked to utilize onboard data systems in our mobile min
May 1, 2011
-
Optimisation of Coke Breeze Addition in Iron Ore PelletsBy G. Paquet, E. Godin
"Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as
Jan 1, 1986
-
CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra LeoneBy Peter Dunn
London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for
May 1, 2011
-
Developments in at-Face/in-Pit Processing TechnologiesBy Martin Stoklossa
Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho
May 1, 2008
-
Treatment of Carnallite Potash Ores by Selective FlocculationBy Samantha Beeson, Collin Poole
"This paper examines the development of two new selective flocculation techniques for recovering KCI values from low grade carnallite potash ore.Direct recovery of KCI was achieved using one of two mi
Jan 1, 1997
-
International Scheme for Assessment of Arsenic Treatment FacilitiesBy N. Yamazaki
The supply of clean copper ores, which have high copper concentration and low impurities like arsenic, has declined year by year. Therefore, both mine and smelter sides have to consider how to remove
Jan 1, 2019
-
Role of dispersants in the production of fine particle size calcium carbonate and kaolin slurries (e12f2493-980b-4bb7-a3ca-e2b0966be8ac)By J. S. Phipps, D. R. Skuse
"Aqueous slurries of fine particle size calcium carbonate are used in a diverse range of end-use products. In many cases, the end use performance is governed by the fineness of the particle size distr
Jan 1, 2003
-
Thompson Mill MgO RejectionBy Johnna Muinonen
"The Thompson Mill processes ores from the Thompson and Birchtree Mines. While the Thompson ore has very little magnesium containing gangue, the Birchtree orebody consists of veins of massive sulphide
Jan 1, 2006
-
Optimization and Increasing Throughput at JacobinaBy Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008
-
The Millennium Iron Range ProjectBy Robert Martin
New Millennium ?a new project for an experienced mine building team ?Owns 100% of KeMag(Harris Lake) property ?Owns 80% of LabMag(Howells River) property -20% owned by Naskapi Nations of Kawawachika
May 1, 2007
-
Towards Formalizing Qualitative Operations Input Data into Mine PlanningBy E. Lampard
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
May 1, 2011
-
The Application of the Stackcell Technology for Fine Coal RecoveryBy E. S. Yan, R. Graley
"The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell
Jan 1, 2013
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
Functional Performance of Ball MillingBy K. Wood, R. McIvor, P. Blythe, M. Lavallee
A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p
Jan 1, 1990
-
Flotation Feed Size DistributionBy Claude Bazin
"Laboratory semi-batch flotation tests were conducted using two different sulphide ore samples. The size reduction was adjusted to cover a wide range of flotation feed size distributions. Results show
Jan 1, 2006
-
Improvements in Column Flotation Through the Use of Microcel™ Spargers at AntaminaBy David Estrella, Hector M. Lizama, Jhonny Carrión
"Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin
Jan 1, 2008
-
Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, CanadaBy Robert Harris, Peter Pheeney
"The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility
Jan 1, 2001