Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Characteristics of Propagation Process of Detonation in Charge Under Influence of Channel EffectBy Minglin W, Zhixing L
The laws of detonation wave velocity variation in propagation process along the charge under channel influence are investigated widely in this paper. The result is obtained by blasting experiments.
Jan 1, 1990
-
The Use of the Ring-Loaded Disc Test in the Quantification of Rock Comminution BehaviourBy S Blackburn, T Veasey
The physical and mechanical properties of rock can be measured by a variety of standard tests, and studies have shown that there should be a fundamental connection between breakage in comminution and
Jan 1, 2000
-
The Implementation of Bulk Emulsion Explosives at Big Bell Mine (5ba8492f-dd77-4906-9379-17f94c93e0d9)By J Player, K Braddon
High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices and o
Jan 1, 1999
-
A New Approach to Planning New Coal-Fired Power Stations in Developing CountriesBy Walsh V
The Australian economy has been adversely affected by the hesitation in developing countries to commit to the construction of .new coal-fired power stations. World coal trade which was expected to
Jan 1, 1987
-
A Study of the Reaction between Lead Sulphate and a Number of Base Metal SulphidesBy Wright S, Jorgensen F. R A
The reaction between lead sulphate and a number of base metal sulphides (galena, sphal- erite, chalcopyrite and synthetic pyrrhotite was studied as a means of desulphurizing lead sulphate containin
Jan 1, 1987
-
A Preliminary Approach to Simulating Blast VibrationBy Qisu W
The ground vibration produced by the bench blasts of a single hole and a row of two or three holes is recorded in an iron mine. Using the seismic signal generated by a single-hole shot as the source
Jan 1, 1990
-
Maintaining the Benefit - How to Ensure Mine to Mill Continues to Work for YouBy D La Rosa, W Valery, A Jankovic, S Ese
Metso Minerals Process Technology Asia-Pacific (MMPT-AP) has been working with many mining companies worldwide performing æMine to MillÆ or Process Integration and Optimisation (PIO) studies. MMPT-AP
Jan 1, 2007
-
Pressure Drop in Swirled LancesBy Gray N. B, Floyd J. M
To gain further understanding of the operating efficiency of the BHP Slab and Plate Products Division (SPPD) RH vacuum degasser, physical and mathematical model studies of the process have been un
Jan 1, 1987
-
The Treatment of South Alligator Valley Uranium OresBy Fisher WJ
The'treatment of the South Alligator valley uranium ores passed through three phases dictated by economic circumstances during the years 1956- 640 In the first phase high grade ores were treated
Jan 1, 1968
-
Numerical Modelling in Excavation DesignBy Kuruppu M
Geotechnical design plays a key role in mine design. A proper geotechnical design provides a safe working environment and facilitates efficient mining operation. There are mainly three design appro
Jan 1, 1995
-
Hoisting in Raise-Bored ShaftsBy Northcote GG
There are many underground mines with shaft or decline access with limited production capacity or where the mine may become uneconomical as trucking costs escalate with increasing depth of the decl
Jan 1, 1978
-
Identification of Shale and Ore Boundaries Using Gaussian ProcessesBy K L. Silversides
Shales form distinctive peaks in natural gamma downhole logs, which are used to manually identify the location of ore boundaries. These shales form important lithology markers that can potentially be
Jul 11, 2011
-
Geology, Mining and Grade Control at the Wemen North Mineral Sands DepositDespite mineral sand occurrences having been noted since the 1970s, the Wemen North Mine is the first operation to commence commercial mining within the inland Murray Basin. The deposit was discovered
Jan 1, 2003
-
Advanced Concepts in Large Slurry Storage TanksOne of the most frequently asked questions at the feasibility study stage of a project is, æhow big can one go?Æ This important question effects costing and efficiency of metallurgical equipment, the
Jan 1, 2006
-
The Effect of Liberation on EluraÆs Lead Flotation PerformanceBy Peck RC
The ore body at Elura contains fine grained galena and sphalerite in a matrix which is mostly pyrite. A differential flotation circuit concentrates lead and silver in the first section and zinc in t
Jan 1, 1991
-
Use of Monte Carlo Simulations in the Evaluation of a Large Copper-Gold DepositValuers will often intuitively express the probability that property value will exceed a certain amount . . . 'I think the chances that the value will exceed $50 million are excellent. The chan
Jan 1, 1994
-
Continuous Assaying in a Copper/Lead/Zinc Mineral Flotation Pilot Plant Using In-Stream Analysis InstrumentationBy Lovett EP, Johnson CR, Dunlop GA
Seven streams of a low tonnage pilot plant operation on Cu/Pb/Zn ore from the Golden Grove Project were continuously assayed using an AMDEL In-Stream Analysis (ISA) system. The ISA instrumentation
Jan 1, 1986
-
Practical Reserve Estimation in a Shear-Hosted Gold Deposit, ZimbabweEvaluation of reserves on a production scale within a shear-hosted gold deposit is complicated by the nature of the mineralisation itself. The 'payable' ground seems to be confined to areas
Jan 1, 1993
-
Exploration Philosophy and Future TrendsProjections of metal requirements for Japan and the United States indicate growing competit- ion for Australia's mineral output and a critical need for continuing discovery of new reserves. Th
Jan 1, 1973
-
3D Geological Modelling of the Campbell Mine, Ontario, CanadaBy G Kuntz, V Wall, B New
The prime aim of the Campbell Mine project was to develop a 3D geological model for the Campbell-Red Lake system to contribute to an exploration model for the region. The base data is composed of over
Jan 1, 2003