Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Expansion of the Mount Isa Mines Copper Concentrator Phase One Cleaner Circuit ExpansionBy G Harbort, V Lawson
Mount Isa Mines Limited operates one of the worldÆs largest underground mines in North West Queensland. ItÆs mining and smelting complex produces copper anode, crude lead bullion (containing silver),
Jan 1, 2003
-
Outside Auger Hollow Claw Tipped Mechanical Sampler for CoalBy Z-Y Pi, B Zhang, S Wen
"The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i
Aug 21, 2012
-
Optimal ore blending given geological uncertaintyBy M Forbes, R Jeuken
Brownfields geoscience measurement such as drilling and surface geophysics can be costly and it is often difficult to weigh the cost of data collection and processing against the value it unlocks at t
Mar 22, 2022
-
A Geostatistical Contribution to Assess the Risk Embedded in Resource Classification MethodsBy J F. C L Costa, J C. Koppe
It is recognised by the major international codes that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological and grade con
Jan 1, 2009
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
The Alluvial Gold Mining Industry in New Zealand (e23f7043-5a67-4ea8-8bc5-209535977150)By Cowie WJ, Utting BS
The alluvial gold industry of New Zealand is based on the placer deposits in Otago and on the West Coast. Production from these since discovery in the 1850's has been an estimated 480 tonnes (15
Jan 1, 1990
-
Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous MineBy F Ramos
Conventional techniques for resource estimation generally involve the laborious analysis of variograms and the specification of parameters for covariance functions. In large deposits, construction of
Sep 26, 2011
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Long hole plug – addressing the hazard of bogged rods in ‘upholes’By G Noonan, S Thomas, M Limbert
Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of
Oct 16, 2017
-
Unique Coal Mine Drift Construction MethodBy C Donnelly
Redpath Australia is using a unique mining method for the Australian underground coal industry at Kestrel Mine Extension in the Bowen Basin, Central Queensland.The project involves completing two sepa
Mar 21, 2011
-
Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting
Jan 1, 2001
-
A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine ClosureBy B N. Noller, J C. Ng, S L. Bruce
Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc
Jul 16, 2014
-
Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical TechniquesBy D J. Bradshaw, B Lottermoser, A Parbhakar-Fox
"Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency
Sep 29, 2013
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Automatic Material and Boundary Layer Detection During the Process of Mining on a Bucket Wheel ExcavatorBy V Gau, L Overmeyer, M Kesting
Economically efficient mining processes can be significantly assisted by the implementation of sensor technologies for the detection of materials and boundary layers between materials inside the strat
Sep 26, 2011
-
Opportunities an Implications of Developments in the Utilisation of Underground SpaceBy White B
The domestic and commercial use of underground space dates back to Neanderthal man living in caves. There are many examples worldwide of the imaginative use of underground excavations, either left b
Jan 1, 1997
-
Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)By D Cumming-Potvin
Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe
Mar 24, 2014
-
Underground Auxiliary Ventilation Monitoring and Diagnostic SystemBy S Viviers, G Ratner
Ventilation is part of all underground mine operations and is undertaken in order to introduce fresh, cool air to the workings and to remove stale, affected air. It is problematic to obtain efficient
Jul 1, 2013
-
A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold MineBy M Brockman, M Cowan, A Robeson
"Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and
Nov 15, 2016
-
The Tooloom Gold Project, NSW ù æForgotten But Not Gone!Æ Rediscovering a 147-Year-Old Gold FieldBy B A. Wake, G G. Lowder, M J. White
The Tooloom gold field is located within the New England Fold Belt in the far northeast of New South Wales, approximately 130 km south southwest of Brisbane. Gold was first discovered at Tooloom in 18
Jan 1, 2004