Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracyBy D Reid, J McKibben, M Noppe
International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo
Mar 22, 2022
-
Understanding ore heterogeneity and effective bulk ore sorting using PGNAA/PFTNABy S Ferguson, G Noble
The mining industry is facing economic pressures to treat more challenging and lower grade ore types, as well as pressure relating to environmental impact and social license to operate. Preconcentrati
Nov 10, 2020
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Dependence of Flame Front Speed on Iron Ore Sintering ConditionsBy J Zhao, C E. Loo
The flame front is a narrow region in the iron ore sintering bed where coke particles combust. The maximum flame front temperature is as high as 1400°C. At high temperatures, the sinter mix compo
Jul 13, 2015
-
Influence of Water on Particle Size Distribution of Clay Mineral-rich Coarse Coal RejectBy D J. Williams, M S. Zbik, A Shokouhi
There is a considerable difference in the particle size distribution (PSD) of clay mineral-rich coarse coal reject with variations in the test moisture state and the chemistry of the water used for te
Jul 27, 2015
-
Geometallurgical Characterisation of Australian Iron Ores – from Ore to Processed ProductBy M I. Pownceby, J Manuel, S Suthers, A Poliakov, E Donskoi, N Ware
"The mining industry is constantly seeking methods for optimising the exploitation of mineral resources, such as iron ore, in a sustainable and eco-efficient manner for economic and social benefit. Wh
Jun 15, 2016
-
Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation DataBy F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz
A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical
Sep 29, 2013
-
21st century relining – the path to greater mine site profitabilityBy P Rubie, J Russell
This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary
Aug 29, 2018
-
A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation CircuitBy D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott
"Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or
Oct 10, 2016
-
Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)By G Zhang, I Glacken
Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p
May 24, 2023
-
Mount Isa Mines Rehabilitation Materials Sampling and Analysis program for closure planningBy C Nucifora, M Landers, J Jones, G Maddocks, K Mandaran, A Forbes, W Wilson, S Newman
Glencore’s Mount Isa Mines Limited (MIM) operates the Mount Isa open cut and underground copper (Cu) and zinc-lead (Zn/Pb) mines near Mount Isa in Queensland, Australia. Tailings from processed Cu and
Jul 25, 2018
-
The Gold and Silver QuestionThe able address on the currency question given by the Right Honorable A. J. Balfour, M.P., late leader of the Government, at the Mansion House lately, before a large and influential audience, will st
-
(U-Th)/He Geochronology of Channel Iron Deposits, Robe River, Hamersley Province, Australia – Implications for Ore GenesisBy M Danišík
Two drill core samples of haematite/goethite from the Robe River (Western Australia) channel iron ore deposits (CID) were dated using (U-Th)/He methods in order to constrain the timing of iron oxide f
Jul 11, 2011
-
Mine-to-Mill Optimisation ù Research and PracticeMining companies around the world are seeking methods to coordinate operations between the mine and the concentrator to achieve an overall improvement in enterprise performance. In several instances v
Jan 1, 2000
-
Application of Different Drive Systems for Horizontal MillsBy M Neurohr, B Wacker, D Mensing, C Murphy, W Kitz
Mining operations have large power requirements. The biggest consumers of energy are the drives for the mills located in the concentrators. Assuming that the decision is made on how many mills are nee
Jul 13, 2015
-
The Geology of the Kidston Gold MineBy Lewis RW, Tullemans FJ, Gallo JB
Gold mineralization at Kidston occurs in a semicontinuous zone near the margin of a large, late Palaeozoic breccia pipe. The pipe is ovoid in plan, funnel-shaped in cross section and straddles a c
Jan 1, 1986
-
In-pit Tailings Disposal at Langer Heinrich – Tailings Storage Facilities in a Unique Hydrogeological SettingBy D Luppnow, C Hore
In-pit tailings storage can provide many advantages when compared to typical above-ground tailings storage facilities (TSFs). As regulations become more restrictive and existing mines expand into new
Jul 27, 2015
-
Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro CoronaBy D La Rosa, K Caron, H Mamani, W Valery, R Diaz
The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these
Aug 24, 2015
-
The Role of On-Line Analysis and Control in Sustainable Minerals ProcessingBy B D. Sowerby, N G. Cutmore
Improved process control can be achieved through the accurate and reliable on-line measurement of critical process parameters in real time. Over the past few decades on-line analysis techniques have b
Jan 1, 2002
-
Mapping and Three-Dimensional Modelling of Structural Controls in the Chirano Gold Deposits, Ghana û Keys to Better Near-Mine Exploration TargetingBy P Hodkiewicz, K Noormohamed
Gold deposits in the Chirano district in south-west Ghana are hosted in a variety of structural settings along the Chirano shear zone (CSZ), in Paleoproterozoic rocks of the Sefwi-Bibiani belt. Most g
Jan 1, 2009