Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USA

    By J Furtney, W Fu, D Nutakor, A Brose

    Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in

    Jun 22, 2022

  • AUSIMM
    A Review of BHP - Utah Coal Limited's Dragline Stripping Operations

    BHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut

    Jan 1, 1989

  • AUSIMM
    Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa Mines

    By J Simpson, M Johnston

    Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n

    Jan 1, 2003

  • AUSIMM
    Effect of alkaline roasting conditions on the dephosphorisation of high-phosphorus iron ore

    By A Batnasan

    The main techniques for removing phosphorus as an impurity element in iron ores are physical separation (eg magnetic separation, flotation) and chemical separation (acid leaching, alkaline leaching an

    Aug 22, 2022

  • AUSIMM
    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    Sep 13, 2010

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Defying Gravity – Brownfield Continuous Improvement

    By J Robinson, L D’Uva

    "The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat

    Oct 10, 2016

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring Locations

    By J Loeb, D Thornton

    Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste

    Aug 18, 2014

  • AUSIMM
    Iron Ore Final Grinding by High Pressure Grinding Rolls and Air Classification

    By F P. van der Meer, E Lessing, E Matthies

    High pressure grinding rolls (HPGR) technology is growing to be a common comminution tool in iron ore processing. The technology finds a wide acceptance and presents specific benefits in coarse ore gr

    Jul 13, 2015

  • AUSIMM
    Dense Medium Separation at Mt Newman

    The Mt Newman Beneficiation Plant uses a combination of heavy media deans, heavy medium cyclones and Reichert cones to produce saleable iron ore concentrates from low grade iron ores. The aim of t

    Jan 1, 1987

  • AUSIMM
    How to Obtain Cost-Effective Continuous High Production from TBMs

    By Jones A

    Today there is a vast amount of information available relative to the performance of tunnel boring machines, and associated systems. The data referred to here consists of project reports, manufacturer

    Jan 1, 1993

  • AUSIMM
    Speech to Australasian Institute of Mining and Metallurgy Sydney 11-15 1988

    I've talked a number of times in the past year or so to audiences like today's about culture -about thinking of it, understanding it, respecting it. So, rather than talk just yet about you

    Jan 1, 1988

  • AUSIMM
    Developments in the Use of Waikato Refractory Clays

    The refractory industry in New Zealand is small, consisting of two main manufacturers - one at Huntly and the other at Kamo. Together these would have an annual refractory production of about 30 000 t

    Jan 1, 1976

  • AUSIMM
    Developing a TSF design concept – experience helps but numbers don’t lie

    By L D. Munro, S A. Jackson

    This paper provides a logical approach to developing a TSF design concept through: • Identifying key properties of tailings and containment structures; • Reviewing underlying principles for effective

    Jul 1, 2021

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • AUSIMM
    Transition to Sulphide Treatment - Laboratory Testwork to Operations

    As the oxide reserves in an oxide/sulphide deposit are exhausted transition to the treatment of sulphides should be investigated in detail and well before processing the sulphide ore commences. The

    Jan 1, 1989

  • AUSIMM
    The Soft Ground Bored Tunnel Under Sydney Airport

    The New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway

    Jan 1, 1999

  • AUSIMM
    An assessment of the rate of construction of an upstream raised tailings dam

    By J J. Moreno, J Willis, P Garvey

    Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.

    Jul 1, 2021

  • AUSIMM
    The Design of Carbon-in-Pulp Plants

    The efficient design of carbon-in-pulp (C.I.P.) plants involves the integration of both process engineering and design engineering.Many recently constructed plants have not recognised the above interr

    Jan 1, 1986