Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Oxidative Dissolution of Nickel Sulphide Precipitated from a Nickel Refinery Waste StreamBy Dyson NF
Nickel sulphide precipitated from waste liquors at the Yabulu plant of Queensland Nickel Pty Ltd was pressure leached under various conditions. Leaching at 130¦C and 700 kPa of air dissolved 95 pe
Jan 1, 1984
-
Concepts for Estimating Ore Reserves and a Comparative View of Resource Estimation MethodsThe estimate of an ore reserve is a vital statement made about a mineral occurrence by an evaluator. It is important that such a statement communicate reality to all groups involved in a mining proj
Jan 1, 1987
-
Multiparallel Fan Method to Prevent Significant External Air Leakages through a Goaf Area of a Shallow Covered CoalmineBy F Wu, H Wang, W Chen
A pressurisation method with multiparallel fans has been adopted at HongLiuLin Coalmine to control the significant external air leakage through the goaf area of coalface 15207. Potential damaging effe
Aug 31, 2015
-
Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, AustraliaBy A Finch, C Pridmore
The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west
Aug 18, 2014
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Nabarlek Uranium Mine Design, Construction, Operation Monitoring and Decommissioning of the Water Management SystemBy Weatherhead J, Grounds J
The Nabarlek Uranium Project located in Arnhem Land in the Northern Territory of Australia was a small high-grade deposit which was the first uranium mine brought into operation following the extens
Jan 1, 1988
-
Analysis of the Creep Behaviour of Tunnels in Sandstone/ShaleBy J C. Small
Time-dependent deformation occurs when geo-materials are under an applied load; this may lead to additional deflection of a tunnel structure and the stress redistribution in the surrounding rock, shot
Jan 1, 2008
-
Health, Safety and SustainabilityBy D Cliff, K Bailey
Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im
Nov 20, 2012
-
The challenges of removing sulfur from magnetite ores to meet direct reduction specificationsBy D Connelly
Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial
Sep 18, 2023
-
Geoscan Online Analyser Use for Process Control at Fortescue Metals Group Sites in Western AustraliaBy B J. Beven, A Harris, L Balzan
Fortescue Metals Group flagship operation, Cloudbreak, is located in the Pilbara region of Western Australia. The mine is capable of delivering an annualised production rate of 40 Mt/a. Positioned 50
Jul 13, 2015
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
Plate Tectonics and the Precambrian-Phanerozoic Evolution of Australia (4c13f387-6abd-4480-92ff-9b1043445f21)Australian continental crust has accreted and consolidated by thirds: 1/3 during Archean time, 1/3 during Early to mid- Proterozoic time, and 1/3 during latest Precambrian to mostly Paleozoic time. Th
Jan 1, 1995
-
Modular SAG mill discharge trommel for maintenance flexibility and performanceBy K Katov, S T. Ciutina, J D. Pyke
The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s
Aug 29, 2018
-
An Expert Neural Network to Control a Mineral Flotation ProcessBy Durao F
A multi-layer feed-forward neural network was trained (using the error back-propagation algorithm) to learn a subset of rules designed to stabilise the performances of the copper flotation section o
Jan 1, 1995
-
Design of raise caving operations in LKAB minesBy T Ladinig
Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st
Mar 29, 2023
-
Support Appropriate for Dynamic Loading and Large Static Loading in Block Cave Mining OpeningsBy W D. Ortlepp
Seismicity associated with deep block cave mining operations in hard rock can give rise to dynamic loading of the mining openings. A description is given of the source and damage mechanisms associated
Jan 1, 2000
-
Broken Hill Metallurgy - A Story of Innovations in Processes, Equipment and InstrumentsBy AJ LYNCH
Broken Hill metallurgists have been responsible for some of the most important developments in mineral processing technology. These occurred mainly in two periods, 1902 - 15 and 1955 - 70. Mineral
Jan 1, 1992
-
A Review of BHP - Utah Coal Limited's Dragline Stripping OperationsBHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut
Jan 1, 1989
-
Understanding the causes of dilution in narrow vein stopesBy S Thomas, S Ricketts, R Hassell
Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d
Mar 15, 2021
-
The necessity of 3D analysis in open pit, rock slope, stability analysis – in theory and practiceBy A Mcquillan, N Bar
Geotechnical models developed during the open pit mine planning stage are generally three-dimensional (3D) in component to capture the spatial variation in geological, structural, hydrogeological and
Nov 29, 2022