Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Grinding Circuit Improvements at Evolution Mining’s Edna May Operation

    By D Atheis, S Williams, A Dance, D Taplin

    "Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant

    Sep 1, 2014

  • AUSIMM
    Earthworks or Landforms? Designing for Lease Surrender

    By S J. Henderson

    Over much of Australia, rainfall is highly seasonal and storm-driven. Consequently, operational mines often need extensive earthworks – drains, dams and levees – for protection during the occasional l

    Jun 28, 2016

  • AUSIMM
    Exploration History of the Mbalam Iron Ore Project

    By S E. Thornett, P L. Kitto, R S. Longley

    "The Mbalam Iron Ore Project covers mineralisation in two areas of metamorphosed hematitic banded iron formation (itabirite) in the north-west Congo Craton; namely at Mbarga in south-east Cameroon and

    Aug 12, 2013

  • AUSIMM
    The Effect of Aground-Underground Seamlessly Integrated Modelling in Mine Disaster Prevention

    By Y S. Zhang

    Natural phenomena and human engineering construction activities had great influence on the geosciences space. Natural disasters, particularly mine disaster and other geological disasters happened freq

    Nov 22, 2011

  • AUSIMM
    Heap Leach Development of the Mt. Leyshon Gold, Silver Deposit

    The Mt Leyshon Volcanic Complex lies 24 kilometres south-west of Charters Towers and is part of a major continental volcano-plutonic province of Permo-Carboniferous age in north-east Queensland.The vo

    Jan 1, 1986

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    Unlocking value chain optimisation with a digital mining system

    By S Gulati, N Sarkar, T Vink, S Battersby, L Okada

    This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times

    Sep 1, 2024

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Paper No. 198. Mount Morgan Practice in Recording And Estimating Ore Tonnages And Values.

    By Thomas G. A

    THE irregularity of the Mount Morgan (Queensland) ore body presents problems other than those only of mining. For irregularity of outline is coupled with irregularity of grade, and the ore varies so r

    Jan 1, 1911

  • AUSIMM
    Mineral Exploration Management

    A mineral exploration manager's prime function is to provide a frame- work within which new mine production can be achieved. As part of this framework, the manager should know his employerb fu

    Jan 1, 1980

  • AUSIMM
    Meteorological Forecasting of Blast Noise from the Del Park Minesite (fbcdcfc5-5412-43cd-8805-cbe0739cecc8)

    Alcoa of Australia's Western Australian bauxite mining operations in the Darling Ranges, southeast of Perth, present major challenges in the control of air blast. The close proximity of rural com

    Jan 1, 1983

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011

  • AUSIMM
    Open Stope Mining Strategies at Brunswick Mine

    By P Andrieux

    By 1996 ground control-related problems at Brunswick Mine had raised serious concerns regarding the safe and economical extraction of large portions of the reserves. These difficulties were mainly cau

    Jan 1, 2000

  • AUSIMM
    A Study of Iron Removal from Kine Kaolin by Two-Liquid Flotation

    By Kewu W

    Kaolin used as an industrial mineral, especially that in the paper-manufacturing industry, must be of fine size, with high brightness, a low impurity content, and good crystal shape. However, in mo

    Jan 1, 1993

  • AUSIMM
    Modified Open Cut Equipment in Underground Mining at King Island Scheelite

    By McLaughlin R. G, Brammer R. A J

    King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die

    Jan 1, 1977

  • AUSIMM
    Carbonatites and Ore Deposits

    Carbonatites - igneous carbonate-silicate rocks - host the world's major resources for niobium, phosphorous and REE (rare earth elements).Carbonatites represent the least common products of mantl

    Jan 1, 1994

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)

    Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score

    Jan 1, 2004

  • AUSIMM
    Effluent Treatment System at Pasminco Metals - EZ

    By Plamer D. J, Newman O. M G

    The Effluent Treatment System at Pasminco Metals - EZ (PMEZ) was commissioned in December, 1991 and has operated satisfactorily, ensuring that aqueous discharges from PMEZ comply with the Tasmanian

    Jan 1, 1993