Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Managing steep seam dips and floor shears related dragline bench and lowwall instabilitiesBy J Li, J Regan, D Payne
The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge
Nov 29, 2022
-
An Approach to Optimising Coal Mine Design for Sustainable DevelopmentBy M E. Karmis
Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh
Jan 1, 2009
-
Effect of Mineral Density for Milling Magnetite OresBy P Holtham, W Valery, P Baguley, A Jankovic
There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m
Jul 13, 2015
-
Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving MineBy N Petropoulos and M J Thurley, E Righetti, M Wimmer
Fragmentation in sublevel caving (SLC) is vitally important. Both gravity flow and any downstream processes are affected. Reasonably coarse fragmentation may lead to larger draw bodies (isolated extra
Aug 24, 2015
-
Evolution of the modern surge-bin in mineral processing plants with highly variable feedsBy J Lyons, S Baker, D MacHunter, D Pepper
Mineral processing plants require a storage buffer to bridge differences in production rates between mining and processing. Where coarse ores are processed, such as coal or hard rock, this buffer may
Aug 24, 2022
-
Cost Effective Concentrator DesignBy G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron DepositBy G Hall
BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo
Jan 1, 2002
-
Strategic Sustainable Development – Creating Shared Value in the Mining IndustryBy M Jones, G Corder, A C. Keith
"Sustainable development has become an issue of ever increasing importance to the mining industry. The Ernst & Young (EY) mining industry risk radar regularly shows several sustainability elements
Jun 22, 2016
-
Economic and Environmental Constraints on Use of South Island Resources for Power GenerationSince the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated
Jan 1, 2003
-
Canada's Mineral Policy Since 1945 - Forty Years of EvolutionResponsibility for the administration of mineral resources is divided between federal and provincial governments. The paper traces the evolution of mineral policies at both levels of government, f
Jan 1, 1986
-
An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore finesBy T Walkemeyer, R Elliott, D Chang-Martin
Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins
Sep 18, 2023
-
Mining Bench Height Evaluation for the Wallaby Resource ù A Conditional Simulation Case StudyBy M Titley, M NoppT
A study on the feasibility of mining the recently discovered Wallaby gold deposit is due for completion by mid-2000. Open pit mining is the favoured method. Determination of the impact of mining bench
Jan 1, 2000
-
A new look at detrital iron deposit geology of the Hamersley Province of Western AustraliaBy C Simpson, J M. F Clout, G Plummer
Detrital iron deposits (‘DID’) in the Hamersley Province of Western Australia have been successfully mined and processed as small quantities of saleable standalone or blended lump and fine ore product
Nov 8, 2021
-
Raise bore stability and risk assessment empirical database updateBy A Penney, M J. Pascoe, R M. Stephenson
The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been
Nov 30, 2018
-
The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold MinesBy D Hillier, A Giblett, K Parker, V Ramsell
Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo
Oct 29, 2012
-
Increasing production systems availability through remote support disciplineBy A Innis, A Bye, B McCarthy, S Glover
Technology adoption in the mining industry has been steadily increasing over the past decade, driven by the need to improve operational efficiency, safety, sustainability, and profitability. As mining
Sep 1, 2024
-
Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway ProjectBy W M. Tekano, T S. Coulter, N M. Hutt
The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell
Jan 1, 2003
-
Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen DemandBy D R. Seaman, B Adamson, P Sharman, M McMahon
"The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold
Oct 10, 2016
-
Managing remediation, and risk of failure, to complete extraction of a short life open pitBy C E. Woolley, A Hosseini, J Foster
Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m
Jun 22, 2022
-
Metso SmartTag - The Next Generation and BeyondBy K J. Riihioja, E Nozawa
SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f
Sep 26, 2011