Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Managing steep seam dips and floor shears related dragline bench and lowwall instabilities

    By J Li, J Regan, D Payne

    The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge

    Nov 29, 2022

  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009

  • AUSIMM
    Effect of Mineral Density for Milling Magnetite Ores

    By P Holtham, W Valery, P Baguley, A Jankovic

    There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m

    Jul 13, 2015

  • AUSIMM
    Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving Mine

    By N Petropoulos and M J Thurley, E Righetti, M Wimmer

    Fragmentation in sublevel caving (SLC) is vitally important. Both gravity flow and any downstream processes are affected. Reasonably coarse fragmentation may lead to larger draw bodies (isolated extra

    Aug 24, 2015

  • AUSIMM
    Evolution of the modern surge-bin in mineral processing plants with highly variable feeds

    By J Lyons, S Baker, D MacHunter, D Pepper

    Mineral processing plants require a storage buffer to bridge differences in production rates between mining and processing. Where coarse ores are processed, such as coal or hard rock, this buffer may

    Aug 24, 2022

  • AUSIMM
    Cost Effective Concentrator Design

    By G Lane

    This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati

    Aug 8, 2011

  • AUSIMM
    The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron Deposit

    By G Hall

    BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo

    Jan 1, 2002

  • AUSIMM
    Strategic Sustainable Development – Creating Shared Value in the Mining Industry

    By M Jones, G Corder, A C. Keith

    "Sustainable development has become an issue of ever increasing importance to the mining industry. The Ernst & Young (EY) mining industry risk radar regularly shows several sustainability elements

    Jun 22, 2016

  • AUSIMM
    Economic and Environmental Constraints on Use of South Island Resources for Power Generation

    Since the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated

    Jan 1, 2003

  • AUSIMM
    Canada's Mineral Policy Since 1945 - Forty Years of Evolution

    Responsibility for the administration of mineral resources is divided between federal and provincial governments. The paper traces the evolution of mineral policies at both levels of government, f

    Jan 1, 1986

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    Mining Bench Height Evaluation for the Wallaby Resource ù A Conditional Simulation Case Study

    By M Titley, M NoppT

    A study on the feasibility of mining the recently discovered Wallaby gold deposit is due for completion by mid-2000. Open pit mining is the favoured method. Determination of the impact of mining bench

    Jan 1, 2000

  • AUSIMM
    A new look at detrital iron deposit geology of the Hamersley Province of Western Australia

    By C Simpson, J M. F Clout, G Plummer

    Detrital iron deposits (‘DID’) in the Hamersley Province of Western Australia have been successfully mined and processed as small quantities of saleable standalone or blended lump and fine ore product

    Nov 8, 2021

  • AUSIMM
    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold Mines

    By D Hillier, A Giblett, K Parker, V Ramsell

    Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo

    Oct 29, 2012

  • AUSIMM
    Increasing production systems availability through remote support discipline

    By A Innis, A Bye, B McCarthy, S Glover

    Technology adoption in the mining industry has been steadily increasing over the past decade, driven by the need to improve operational efficiency, safety, sustainability, and profitability. As mining

    Sep 1, 2024

  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Metso SmartTag - The Next Generation and Beyond

    By K J. Riihioja, E Nozawa

    SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f

    Sep 26, 2011