Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Investigating the tunnel closure using convergence confinement method and 2D plane strain finite difference analysis

    By E Kabwe, E Chanda, M Karakus, S Akdag

    The Convergence Confinement Method (CCM) is one of the frequently used methods that considers the ground response to the advancing tunnel face. The CCM analytical solutions represent stress relaxation

    Nov 30, 2018

  • AUSIMM
    Resource and Reserve Calculations - The Experience at BHP-Utah Coal Limited

    The process of evaluating orebodies at the feasibility study stage is extremely important. In recent times many groups have indicated that they would like ore reserve estimation to be numeric and o

    Jan 1, 1990

  • AUSIMM
    The Ability of Current Gas Monitoring Techniques to Adequately Detect Spontaneous Combustion

    This paper investigates the adequacy of current gas monitoring techniques to adequately detect spontaneous combustion in underground coalmines. Despite being in the 21st century spontaneous combustion

    Jan 1, 2005

  • AUSIMM
    Longwall Extraction at South Bulli Colliery

    The Bellambi Coal Company Limited com menced longwall mining at South Bulli Colliery in 1965. At present it operates three long- wall units in two seams. Although results to date have been less succ

    Jan 1, 1976

  • AUSIMM
    Performance of Vertical Flow Systems for Passive Treatment of Acid Mine Drainage

    Vertical flow systems (SAPS, vertical flow wetlands) are increasingly used for passive treatment of mine drainage that is net acid. Data on 30 systems in eastern US show that well designed systems typ

    Jan 1, 2003

  • AUSIMM
    Non-Ideal Explosive Performance Prediction Using the CPEX Model

    By Minchinton A

    CPeX is a non-ideal explosive performance prediction model. The model takes into account the rate of energy release, the extent of chemical reac- tion and the effect of confinement on energy release.

    Jan 1, 1988

  • AUSIMM
    Application of Synthetic Rainfall Data to Long-term Modelling of a Rehabilitated Landform

    By G R. Hancock, D Verdon-Kidd, M J. Saynor, J B. C Lowry, T J. Coulthard

    The ability to simulate the stability of post-mining landscapes over time scales ranging from decades to millennia is a critical element in the assessment of closure designs for uranium mines. Landsca

    Jun 28, 2016

  • AUSIMM
    The Fitzroy Aqua-Eco Health Project

    By C Sellens, L D. Fabbro, S Vink

    The Fitzroy River Aqua-Eco Health Project is a collaborative research project between the Central Queensland University, the University of Queensland and BMA. It is designed to assess the aquatic ecol

    Nov 26, 2013

  • AUSIMM
    The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IES

    By J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney

    Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and

    Nov 10, 2020

  • AUSIMM
    A Field Demonstration of a Modified Wet Scrubber for Dust Control in an Illinois Coal Mine

    By A Patwardhan, M M. Alam, K K. Thatavar

    A commercial wet scrubber was used in the SIU-Joy dust control laboratory to test several concepts for improving the dust control efficiency of a wet scrubber. The concepts tested included two filter-

    Jan 1, 2005

  • AUSIMM
    An Overview of the Weathering Process, Preliminary Density and Unconfined Compressive Strength Correlations for Fresh Itabirites in Vale Mines on the Western Side of the Iron Quadrangle, Brazil

    By E A. G Marques, P M. Dight, T A. V Costa, K Mercer

    Brazilian banded iron formation (BIF), known as ‘itabirite’, is the main host rock for iron ore in the Iron Quadrangle mines, Brazil. Their geneses are controversial and it is agreed that diagenetic,

    Jul 13, 2015

  • AUSIMM
    Characterisation of SFCA phases in iron ore sinter by combined optical microscopy and electron probe microanalysis (EPMA)

    By M I. Pownceby, S Hapugoda, H Han, E Donskoi, L Lu

    Iron ore sinter mineralogy and its associated macro-/micro – structure has a strong impact on sinter quality. At a macroscopic scale, sinter ideally consists of a strong, porous matrix which bonds rel

    Nov 8, 2021

  • AUSIMM
    Minerals Processing ù Continuing Down the Path of Innovation

    Mining and mineral processing makes a vital contribution to AustraliaÆs national export income, and our society today is critically dependent on its products. Despite the importance of this industry,

    Jan 1, 2004

  • AUSIMM
    Peanuts and Tunnel Stuffing - The Brightwater Conveyance System East Contract

    By M E. Trim, J J. Johnson, W Cranston

    The Brightwater conveyance system is located near Seattle, Washington in the north-western United States. The East Contract portion of the system consists of a 4.3 km long, 5.9 m diameter tunnel in so

    Jan 1, 2008

  • AUSIMM
    The Use of Risk Analysis in the Selection of a Mining Method

    It is very rare in the underground hard rock environment to find a deposit that is ideally suited to a specific mining method. Usually the irregular shape of the orebody will allow the deposit to be e

    Jan 1, 1998

  • AUSIMM
    Production Drill Optimisation at Telfer Underground - A Move Towards Automation

    By P F. Knights, P Boniwell

    This paper investigates the causes of low effective utilisation of the production drill fleet at the Telfer Underground Gold Mine, as measured by the percussion hours per shift. The first part of this

    Jan 1, 2008

  • AUSIMM
    Validation of the AMIRA P9 Flotation Model Using the Floatability Characterisation Test Rig (FCTR)

    By J-P Franzidis

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant. It was developed as part of the AMIRA P9 project, primarily to determine ore floatabilit

    Jan 1, 2007

  • AUSIMM
    Reproduction of inequality constraint between iron and silica for accurate production scheduling

    By N Madani, S Abulkhair, N Morales

    Conventional geostatistical algorithms cannot reproduce bivariate complexities such as inequality constraint, nonlinearity and heteroscedasticity. Poor reproduction of these features may decrease the

    Nov 8, 2021

  • AUSIMM
    Commercial Underground Space – Planned Development for the Future

    By A C. Robertson

    World urban expansion puts constraints on the available land surface area of our major cities both for accommodating people as well as providing infrastructure and services whilst at the same time att

    Sep 17, 2014

  • AUSIMM
    Truck Haulage Developments in the 80's

    A brief history of the significant haulage truck feature changes and the factors that influenced those changes during the 60's and 70's provide a basis for forecasting the changes that ca

    Jan 1, 1982