Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
The Autoxidation of the Thiolate Collectors Catalysed by Cobalt (II) Phthalocyanines and its Influence on the Sulphide FlotationBy Faidel VV, Yushina TI, Yagodkina NG, Yatsimirsky AK, Chanturiya VA
Among the problems of the flotation of sulphides by the thiol collectors is the dependence and varieties of the flotation starting with the time and oxygen contents in the slurry. For sulphides, the
Jan 1, 1993
-
Development of the Ernest Henry Underground Mine – The Challenges and the SolutionsBy T Purvis
Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp
Mar 21, 2011
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
Using a Sustainability Assessment Framework to Achieve Enhanced Legacy OutcomesBy S R. Green, G D. Corder
The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the
Jul 10, 2012
-
Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower ProjectsBy A G. Noble
Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of
Mar 8, 2011
-
Regional Trade-Offs Between Mine Water and Energy Use - A Water Treatment Case StudyBy A Woodley, G Keir
The mining industry faces concurrent pressures of reducing water use, energy consumption and greenhouse gas (GHG) emissions in coming years. However, the interactions between water and energy use, as
Nov 26, 2013
-
Victory Gold Mine û KambaldaBy Larke R, Warnock J
Although Western Mining Corporation has been producing high grade nickel ore at Kambalda since 1967, it has only recently become a significant gold producer.The main source of Gold ore has been the Vi
Jan 1, 1984
-
Alternatives to Conditional Simulation for the Estimation of Iron Grade Distributions ù A Case Study From BHP BillitonÆs Mt Whaleback OperationsConditional simulation can be used to determine the probabilities of block iron-grades being above selected cut-offs. However, there are much faster alternatives that can produce acceptable results. I
Jan 1, 2005
-
Ventilation and Cooling Design for Long DeclinesDeclines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b
Jan 1, 2005
-
Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity SeparationBy M I. Pownceby
High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the
Oct 5, 2011
-
Prokaryotic Arsenic Metabolism ù Roles in Arsenic Cycling and BioremediationBy J M. Santini, I C. A Streimann
Arsenic is a naturally occurring element in the environment and is toxic to biological systems. Arsenic can exist in the environment in the following redox states, arsenite (+3), arsenate (+5), arsine
Jan 1, 2004
-
Stable Isotope Relationships in Epithermal Gold Deposits, QueenslandBy Wilson AF
Gold-silver mineralization at Cracow and Ukalunda in Queensland comprise quartz-filled veins, fissures and breccia zones hosted by propylitically altered volcanics and epizonal intrusions which are st
Jan 1, 1984
-
A Banker's View of Cash Flow Methods in Mineral ValuationBanks' focus in using cash flow methods can differ markedly from that of equity investors. This paper attempts to explain and describe bankers' approach by: ò outlining the fundamental dif
Jan 1, 1994
-
Australia's Mineral Resources- A Vital Role: An Uncertain FutureThe long-term outlook Tor Australla's traditional mining products is for flat demand and continuing low prices. This has come about because of three far-reaching changes since earlier boom day
Jan 1, 1987
-
Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation (c28c0d5f-5fb9-42f8-9b13-de3161c056c3)By M Wortley, J McKay, D La Rosa, O Guyo
It has been a generally held concept that crushing operations were, by their nature, too simple to benefit from the implementation of advanced process control. The commissioning of an OCS¬ expert cont
Jan 1, 2006
-
Thiosulfate Process for Treating Gold ConcentratesBy P Breuer, X Dai, A Bergamin, D Hewitt
"Copper-ammonia-thiosulfate?leaching of gold has been researched for several decades as a potential alternative to cyanidation. However, this technology has not yet been applied commercially due to ma
Sep 26, 2013
-
Mining for Water - Partnering for Sustainable Water Use in Semi-Arid RegionsBy N Lefebvre, M Jakeman, R Aseervatham
Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr
Jan 1, 2006
-
Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production SchedulingBy P Cesare, S Munro, D Wandel, R A. Bearman
Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t
Nov 24, 2014
-
Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)By L Stitz, S Kinnear, L D. Fabbro
Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further
Nov 26, 2013