Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    The Autoxidation of the Thiolate Collectors Catalysed by Cobalt (II) Phthalocyanines and its Influence on the Sulphide Flotation

    By Faidel VV, Yushina TI, Yagodkina NG, Yatsimirsky AK, Chanturiya VA

    Among the problems of the flotation of sulphides by the thiol collectors is the dependence and varieties of the flotation starting with the time and oxygen contents in the slurry. For sulphides, the

    Jan 1, 1993

  • AUSIMM
    Development of the Ernest Henry Underground Mine – The Challenges and the Solutions

    By T Purvis

    Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp

    Mar 21, 2011

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Using a Sustainability Assessment Framework to Achieve Enhanced Legacy Outcomes

    By S R. Green, G D. Corder

    The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the

    Jul 10, 2012

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • AUSIMM
    Regional Trade-Offs Between Mine Water and Energy Use - A Water Treatment Case Study

    By A Woodley, G Keir

    The mining industry faces concurrent pressures of reducing water use, energy consumption and greenhouse gas (GHG) emissions in coming years. However, the interactions between water and energy use, as

    Nov 26, 2013

  • AUSIMM
    Victory Gold Mine û Kambalda

    By Larke R, Warnock J

    Although Western Mining Corporation has been producing high grade nickel ore at Kambalda since 1967, it has only recently become a significant gold producer.The main source of Gold ore has been the Vi

    Jan 1, 1984

  • AUSIMM
    Alternatives to Conditional Simulation for the Estimation of Iron Grade Distributions ù A Case Study From BHP BillitonÆs Mt Whaleback Operations

    Conditional simulation can be used to determine the probabilities of block iron-grades being above selected cut-offs. However, there are much faster alternatives that can produce acceptable results. I

    Jan 1, 2005

  • AUSIMM
    Ventilation and Cooling Design for Long Declines

    Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b

    Jan 1, 2005

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    Prokaryotic Arsenic Metabolism ù Roles in Arsenic Cycling and Bioremediation

    By J M. Santini, I C. A Streimann

    Arsenic is a naturally occurring element in the environment and is toxic to biological systems. Arsenic can exist in the environment in the following redox states, arsenite (+3), arsenate (+5), arsine

    Jan 1, 2004

  • AUSIMM
    Stable Isotope Relationships in Epithermal Gold Deposits, Queensland

    By Wilson AF

    Gold-silver mineralization at Cracow and Ukalunda in Queensland comprise quartz-filled veins, fissures and breccia zones hosted by propylitically altered volcanics and epizonal intrusions which are st

    Jan 1, 1984

  • AUSIMM
    A Banker's View of Cash Flow Methods in Mineral Valuation

    Banks' focus in using cash flow methods can differ markedly from that of equity investors. This paper attempts to explain and describe bankers' approach by: ò outlining the fundamental dif

    Jan 1, 1994

  • AUSIMM
    Australia's Mineral Resources- A Vital Role: An Uncertain Future

    The long-term outlook Tor Australla's traditional mining products is for flat demand and continuing low prices. This has come about because of three far-reaching changes since earlier boom day

    Jan 1, 1987

  • AUSIMM
    Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation (c28c0d5f-5fb9-42f8-9b13-de3161c056c3)

    By M Wortley, J McKay, D La Rosa, O Guyo

    It has been a generally held concept that crushing operations were, by their nature, too simple to benefit from the implementation of advanced process control. The commissioning of an OCS¬ expert cont

    Jan 1, 2006

  • AUSIMM
    Thiosulfate Process for Treating Gold Concentrates

    By P Breuer, X Dai, A Bergamin, D Hewitt

    "Copper-ammonia-thiosulfate?leaching of gold has been researched for several decades as a potential alternative to cyanidation. However, this technology has not yet been applied commercially due to ma

    Sep 26, 2013

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013