Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mechanical Sampling Plants

    In 1997, the Australian coal industry through Standards Australia committee MN-001 Coal and Coke recognised the need to produce a Standard giving some instruction on how to inspect and audit mechanica

    Jan 1, 2005

  • AUSIMM
    Water as Risk in Mining – Media Analysis and the RISKGATE Body of Knowledge

    By J Harris, M Shi, S Vink, P A. Kirsch

    Across the life-of-mine, water is both an essential commodity to mining, and one of the most significant hazards. In Australia, a land of drought and floods, availability of water is a critical strate

    Jul 16, 2014

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

    By Slater R

    The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The

    Jan 1, 1982

  • AUSIMM
    Geotechnical Investigations for New Strip Mines

    With increasing depth of mining, geotech nical factors assume increasing importance in the design and operation of open pit coal mines. Dragline strip mines are particularly sensitive to stability

    Jan 1, 1981

  • AUSIMM
    Planning the Extraction of the Lead Orebodies Below 15 Level at Mount Isa

    By Clifford C. E

    The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extr

    Jan 1, 1979

  • AUSIMM
    Performance Improvement of Longwall Machinery

    An integrated mining equipment development organisation is typified by Deutsche Montsn Technologic of Essen, Germany. working on improvements in reliability, production and control in coal mines. Exam

    Jan 1, 1991

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    A Day in the Life of a Mine Worker in 2025

    By V Srinivasan, P Knights, C T. Farrelly

    By 2025, with the widespread industry adoption of remote operation centres and advanced analytics, mining companies will find themselves making better, more informed decisions across the value chain.

    Jan 1, 2008

  • AUSIMM
    Computer Assessment of Grades and Tonnages in an Operating Open-Pit Mine

    Digital computers, by virtue of their capacity for high speed repetitive calculation at low cost, are finding increasing application to routine calcula- tions in the mining industry. In this paper te

    Jan 1, 1971

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    The Jianchaling Mine, Shaanxi Province, PeopleÆs Republic of China ù A Carlin-Type Gold Deposit?

    By T Leach, F Kaiqiang

    The Jianchaling gold deposit is located about 1200 km south west of Beijing in central China. The deposit was discovered in 1988 by the Northwestern Geological Exploration Bureau (711 Exploration Team

    Jan 1, 2004

  • AUSIMM
    Methods of Increasing Production in A Travelling Grate Pellet Plant Limited by Drying Capacity

    By Thomas CG, Armstrong GJ, Lynch KS

    A small glass walled pot grate has been used to simulate drying of iron ore pellets in a travelling grate plant. This equipment has enabled the effect of decreasing grind and de- creasing pellet bu

    Jan 1, 1972

  • AUSIMM
    Monitoring and Control in the Recirculation of Underground Ventilation Air

    By Walker K, Burton RC

    An outline of the ventilation and refrigeration requirements of deep South African gold mines is presented. This is followed by a brief description of the history of controlled recirculation in mines

    Jan 1, 1985

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics

    The transgressive sedimentary sequence of the Notnnea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanims of shoshonitic affinities which erupted simultaneously during

    Jan 1, 1995

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    Trial Application of Polyurethane Resin in Australian Coal Mines

    By Russell P

    Polyurethane resin (PUR) is extensively used in almost all coal producing countries. On the local scene, PUR components suitable for underground application were selected and subsequently, trials

    Jan 1, 1986

  • AUSIMM
    Blast Design Optimization to Minimize Induced Vibrations of Structures

    By Kavetsky A, Scott A

    As well as breaking and moving rock, blast energy sets up a seismic wave in the ground which can cause significant damage to rock structures and buildings and disturbance to human occupants. This se

    Jan 1, 1990

  • AUSIMM
    Slot Stopping At Bold Head Mine, King Island Scheelite

    By Snowden C. T

    B Lens Main is a scheelite orebody with an average dip of approximately 15¦ and thickness ranging from 1.5 to 6.0 m. The orebody is overlain by a banded section of ore and waste which tends to slab

    Jan 1, 1977