Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sampling and blending in geoenvironmental campaigns – current practice and future opportunities

    By A Parbhakar-Fox, S C. Dominy

    The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact

    May 9, 2017

  • AUSIMM
    A Study of Electrokinetic Properties of Activated Carbon in Relation to Gold Adsorption

    By Ofori-Ansah K

    The zeta potential on the surface of activated orit carbon were estimated in lhe presence of selected cations and anions that are normally associated with gold bearing ores in Kalgoorlie area of Weste

    Jan 1, 1984

  • AUSIMM
    Secondary Breakage Practice at the DOZ Block Cave Mine

    By A Sinuhaji, H Kalangi, T B. Setyoko

    Ore fragmentation at the DOZ block cave mine is highly variable, both as a function of rock type and column height of draw. Initially, the mine was constructed and equipped with limited capability to

    Jan 1, 2005

  • AUSIMM
    Chilean Ore Deposits and Mineral Belts

    By Lowell J. D

    This paper is an outgrowth of a continuing compilation of the geology of Chilean ore deposits by Carlos Ruiz who was the author in 1965 of Geologia y Yacimientos Metaliferos de Chile which was the def

    Jan 1, 1990

  • AUSIMM
    Smelting of nickel and vanadium wastes to produce green steel

    By D Lalor, N Goodman

    The increasing demand for batteries is resulting in the development of large-scale projects for the production of key battery metals such as nickel and vanadium. Several of these projects plan to extr

    Sep 18, 2023

  • AUSIMM
    Value in Use ù Developing an Improvement Program for Success

    By M Gill, A Mathias

    The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi

    Jan 1, 2004

  • AUSIMM
    The Planning and Design of the Prospect to Pipehead Tunnel

    The Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet

    Jan 1, 1993

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Intragraben Fault Zones, Volcanism, and Geothermal Evolution in the Oregon-Idaho Graben, U.S.A. (cb62322a-c63b-484d-a72f-a99e158b5dcc)

    The Oregon-Idaho graben evolved after widespread Uwleiitic flood basalt volcanism associated with the arrival of the plume head of the Yellowstone hotspot beneath southeastern Oregon approximately 17

    Jan 1, 1995

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Carrapateena Crusher Station One – Optimisation and excavation

    By A Mooney, G Balog, P Burns, R Brooks

    This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as

    Mar 15, 2021

  • AUSIMM
    Roof Falls in Australian Longwalls

    By Savidis GM

    This report outlines the experience of Australian mining operators in dealing with large falls of roof in advance of longwall supports. Previous and present techniques used for face stabilisation

    Jan 1, 1986

  • AUSIMM
    Large Diameter Tunnel Excavation Through Mixed Ground of Clay and Basalt Using Tunnel Boring Techniques

    The excavation of a tunnel through rock and mixed ground of basalt and silty clays presents a challenge to engineering organisations. Such was the situation facing the Melbourne and Metropolitan B

    Jan 1, 1987

  • AUSIMM
    Evaluation of sustainability of copper production value chain from ore to metal using advanced simulation

    By A Remes, A Dennis, M Talikka, T Kotiranta, S Horn

    A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan

    Jul 25, 2018

  • AUSIMM
    Recent advances in tailings testing methods

    By D J. Williams

    The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos

    Jul 23, 2018

  • AUSIMM
    An Alternative Genesis for Pisolites and Channel Iron Deposits in Western Australia

    The current genesis of pisolites and channel iron deposits (CID) has been defined in a way that presents CID as unique in the world. The published material on detrital pisolites mostly details the Wes

    Jan 1, 2009

  • AUSIMM
    The Geology of the Wonthaggi Coalfield, Victoria

    By Knight J. L, Baker G

    The Wonthaggi coalfield is in South Gippsland, about 90 miles southeast of Melbourne. It is situated on the down-faulted block of the South Gippsland highlands that lies south of the Kongwak fault, be

    Jan 1, 1944