Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rougher Automation In Escondida Flotation PlantBy S. Kittel, P. Galleguillos, H. E. Urtubia
The rougher flotation at Escondida consists of 80 cells of 100 m3 each, with injected air. Escondida has developed a system of automatic control of the rougher flotation using video cameras, which hav
Jan 1, 2001
-
Evaluation Of Sulfidic Mine Tailings Solidified/Stabilized With Cement Kiln Dust And Fly Ash To Control Acid Mine DrainageBy M. Nehdi
Deficient surface disposal systems of sulfidic mine waste often cause severe contamination of surface streams and groundwater reservoirs due to the oxidation of sulfide phases. The subsequent generati
Jan 1, 2008
-
The effects of ventilation controls and environmental cabs on diesel particulate matter concentrations in some limestone minesBy J. D. Doll
MSHA has promulgated a rule to limit the exposure of underground metal/nonmetal miners to diesel particulate matter (DPM). In May 2008, the final personal exposure limit will be lowered to 160 µg/m3 t
Jan 1, 2009
-
Exploration Strategy And Application At Ashanti?s Obuasi OperationsBy J. A. Cox
The Ashanti mine is located within the Lower Proterozoic Birimian of Ghana, and covers a concession of 474 square kilometres at its Obuasi operations which comprise large scale underground, surface an
Jan 1, 1999
-
Impact of Air Distribution Profile on Banks in a Zn Cleaning Circuit (7e803669-0db8-4622-9392-dbc63c206bdb)By R. Dahlke, J. A. Finch
"A campaign was undertaken during the greater part of 2001 at Noranda’s Brunswick Mine Concentrator to investigate the role of gas (air) superficial rate distribution (Jg profile) to the cells in the
Jan 1, 2004
-
Stratigraphy of the Thomson Orogen – New Insights from Mount McLaren, North-east AustraliaBy C Verdel, M Lee, A Oorloff, K Welsh
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Thomson Orogen is a large but poorly understood element of Queensland geology. Extensiv
Mar 18, 2015
-
Design of the University Link Tunnels and StationsBy Daniel N. Adams
The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter
Jan 1, 2008
-
Design & Development of the Barmac RotopactorBy Bryan A. Bartley
"Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla
Jan 1, 1985
-
Capacity Of Slender Steel PilesBy J. Wennerstrand
Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to
Jan 1, 1989
-
A Standard Column Weathering Test To Estimate Coal Overburden Leachate Quality - Introduction - Preprint 09-086By E. F. Perry
Simulated weathering tests are used to estimate leachate quality of rocks containing varying concentrations of pyrite and carbonates at mines. This study reports the inter-laboratory results from the
Jan 1, 2009
-
Minesite Avalanche – Some Lessons LearnedBy Tim Hurley
On Friday, May 27, 1983 at about 6 p.m., an avalanche occurred at the Revenue-Virginius Mine. Six mine personnel and two contract diamond drillers were trapped when the avalanche covered and blocked
Jan 1, 2006
-
Modelling For Consolidation Around The Pile TipBy Emöke Imre
A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical
Jan 1, 2002
-
Flotation Performance Improvement by Air Recovery Optimisation on Roughers and ScavengersFlotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers
Sep 13, 2010
-
Experimental Scale-Up of the Screen ModelsBy Harri J. Lehto, Marja I. Oja
"The purpose of grinding circuits is to produce a particle size distribution that has as much as possible the wanted particle size class. In practise, however, the production of the wanted size class
Jan 1, 2003
-
Drilled Piers With Base Preloading By Grouting - 1. IntroductionBy Boleslaw A. Klosinski
Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile
Jan 1, 1995
-
Fahlore as an indicator of mineralization temperature and gold finenessBy F. W. Brackebusch, R. O. Sack
"A method for determining the fineness of Au in electrum from the composition of fahlore coexisting with pyrite and chalcopyrite is presented. This method is based on previously published experimental
Jan 1, 2004
-
Extreme Multiple Seam Mining in the Central Appalachian Coalfields (8129456e-a9ee-4edc-84af-bd34aa808bd3)Coal has been mined in the central Appalachian coalfields of southern West Virginia, western Virginia, and eastern Kentucky for more than a century. The dwindling reserve base consists in large part
Jan 1, 2006
-
Innovative Process Control Technology For Milling And Flotation Circuit OperationsBy G. C. Smith
Process control applications in the minerals processing industry have grown extensively over the years due to the many benefits derived, both financially and operation-wise. Although control theory i
Jan 1, 2004
-
The Mineral Industry Of Africa - Introduction (3fc4991a-a9c9-4dd8-b6c1-7890c2b88916)The 53 countries that constituted Africa in 1993 accounted for a significant portion of total world output of a number of mineral commodities. For the continent as a whole, world shares of most commod
Jan 1, 1995
-
The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, LondonBy J. A. Yeats
This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to
Jan 1, 1989