Search Documents

  • SAIMM
    Introducing new Council members (f1ecaec8-d397-4bba-a492-7b63c8dd2f98)

    Mr D. Wilson was born in Vereeniging, where he also completed his schooling, matriculating from General Smuts High School in 1977. Mr K.A. van Gessel was born in 1937. His final studies were condu

    Jan 1, 1989

  • SME
    An Overview Of NIOSH Mine Illumination Research: Past, Present, And Future

    By J. J. Sammarco

    Illumination is essential for mine safety because miners depend most heavily on visual cues to detect hazards associated with slips/trips/falls and powered haulage. The National Institute for Occupati

    Feb 27, 2013

  • SME
    Refractory Copper Ore From Nchanga, Zambia: A Materials Characterization Study

    By O. N. Sikazwe

    The Nchanga Cu-Co ore deposit of the Zambian Copperbelt, is hosted in Neoproterozoic siliciclastic-carbonate sedimentary rocks, and it consists of two orebodies: the Lower Orebody (shale) and the Uppe

    Jan 1, 2008

  • IIMP
    Solución integrada para el control de calidad en canteras de cemento

    By Giorgio De Tomi

    La industria del cemento se caracteriza por una alta inversión en tecnologías de procesamiento, principalmente en la fábrica de producción de cemento. Dicha tecnología incluye el monitoreo continuo y

    Aug 25, 2002

  • ISEE
    Numerical Modeling of the Circular-Cut using Particle Flow Code

    By Young-Dong Cho, Yonghun Jong, Dong-See Shim, Seokwon Jeon, Chung-In Lee

    The most important operation in the tunnel blasting procedure is to create an opening in the face in order to develop more free surface in the rock mass. This operation is highly dependent on the cut

    Jan 1, 2005

  • AIME
    Action of Reducing Gases On Heated Copper

    By W. H. Bassett

    In considering the effects of reducing gases on hot solid copper the following conclusions have been reached. (1) Depth of deoxidation of copper heated in reducing gas is greater the smaller the amoun

    Jan 1, 1926

  • CIM
    Island Copper Mine Milling for Copper and Molybdenum

    By Chris Brown

    "The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil

    Jan 1, 1975

  • SME
    Tonnage Factor – A Matter of Some Gravity

    By I. S. Parrish

    One of the most common errors uncovered while performing a reserve, or resource, audit is not in the geological modeling or grade problems due to poor sampling, prepartion or assaying. The error most

    Jan 1, 1993

  • CIM
    Integration of gyratory crusher liner wear and operational performance for better crusher management

    By P. P. Rosario, D. M. Maijer

    The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC

    Jan 1, 2006

  • SME
    Octyl Diphosphonic Acid As Collector For Niobite Flotation

    By Daniel Tao, Jike Qiao, Hao Ren, Feifei Ji, Gonglun Chen

    The floatation of niobite was studied using a number of collectors at various dosages and solution pH’s. Octyl diphosphonic acid was found to be an effective collector for niobite flotation with good

    Jan 1, 2005

  • SAIMM
    A computer program for estimation of support requirements for circular shafts

    By H. Ozturk

    In this paper, the computer program ‘SHAFT’ developed for estimation of support requirements for circular mine shafts is introduced. Theory of support design is based on the analytical solutions of ci

    Jan 1, 2003

  • NIOSH
    IC 7257 Geophysical Abstracts 113 April-June 1943 - 1. Gravitational Methods

    6889. Aslakson, C. I., and Swick, C. H. Gravity Observations in Peru and Colombia. Coast and Geodetic Survey,-Special Pub. 233, U. S. Government Printing Office, Washington, D. C., 1943, 18 pp. (Price

    Jan 1, 1943

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • NIOSH
    Abrasive Materials (MINERALS YEARBOOK, 1983)

    By J. Fletcher Smoak

    Consumption of abrasive materials in the United States increased 22% in value over that of 1982 to $320 million; of which, 59% was manufactured abrasive, 35% was industrial diamond (natural and synthe

    Jan 1, 1984

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • SME
    Development Of Laboratory Hardware And A Protocol For Direct Determination Of Breakage Functions For Fine Particles In Ball Mills - Introduction

    By D. E. Walsh

    With the exception of the development of large scale mining equipment (haul trucks, draglines, shovels, etc.), there are likely few other candidates responsible for the ability to exploit large tonnag

    Jan 1, 2011

  • DFI
    Conventional And Box-Shaped Piled Rafts

    By Heinz Brandl

    Box-shaped pile and diaphragm wall foundations have proved suitable for transferring heavy loads of bridges, power plants, tanks, towers or other buildings in a concentrated form into the ground. The

    Jan 1, 2002

  • CIM
    American Barrick Goldstrike Operation in Elko Nevada - A Summary of the Operation and Future Expansions

    By R. H. Colquhoun, A. W. Bolland, H. J. H. Pieterse

    "American Barrick Resources Corporation acquired the goldstrike property in north eastern Nevada in early 1987. Since that time, the company has undertaken an extensive development program. This paper

    Jan 1, 1992

  • SME
    Effective Diffusivity Of Ferric Ions And Current Efficiency In Stagnant Synthetic Copper Electrowinning Solutions - Preprint 09-047

    By M. Moats

    Copper electrowinning operations have dramatically improved their ability to produce high quality copper at low costs over the past several decades. Even so, some fundamental understandings are still

    Jan 1, 2009

  • AIME