Methods For Determining Roof Fall Risk In Underground Mines (e9e99c27-c4ac-4dc4-b19d-607c245139c5)By T. Bajpayee, L. Prosser, A. Iannacchione
Reducing the number of roof fall injuries is a goal of the NIOSH mine safety research program. Central to this effort is the development of assessment techniques that will help to identify the nature
Jan 1, 2007
-
Application of Environmental Engineering Models in Systems for Decision Making SupportBy B. Salopek, D. Rajkovic, D. Rumenjak
In decision making support system, that are used in various fields of environmental protection (environmental impact assessment, environmental management systems, setting environmental standards and r
Jan 1, 2005
-
Online elemental and mineral measurement of slurries in iron ore beneficiationBy O Haavisto, N Khajehzadeh, L Koresaar
Online analysis of metal content can be used to optimise the grade and recovery of a flotation circuit. Compared to conventional laboratory analyses, the benefit of an online analyser is the speed of
Jul 24, 2017
-
Wilkes-Barre Paper - Iron Manufacture in MexicoBy J. P. Carson
The works of the Tula Iron Company are in the Republic of Mexico, State of Jalisco, twenty-eight leagues southwest of Guadalajara, ten leagues northwest of the town of Sayula, through which passes the
Jan 1, 1879
-
The Drainage of the New Chum Line of ReefOne of the chief drawbacks to Bendigo mining always has been the difficulty of draining the mines in an equitable manner, so that each company or mine owner bears the properly share. The trouble seems
Jan 1, 1902
-
Characterisation studies of Tectonised Clay shales and implications in the excavation of large size tunnelsBy Marco Barla, Mariacristina Bonini, Giovanni Barla
ABSTRACT: The paper describes the characterisation studies of Tectonised Clay Shales at laboratory and in situ scale. The interest relates to tunnelling under squeezing and swelling conditions, in Ita
Jan 1, 2003
-
Geometric Control for Strategic Mine Planning at El Teniente MineBy J Cornejo, A Pinochet, C Caviedes
The ore extraction rate and the incorporation of new areas are key operational parameters. In massive deposits mined by caving techniques they both control the cave back geometry, which is mostly resp
May 9, 2016
-
Production of Cobalt Oxide, Cobalt Sulphate and Electrolytic CobaltIn, one stage of the purification sequence of the zinc sulphate electrolyte used at Risdon, cobalt is, precipitated as cobalt nitroso-,B-naphtholate, which is separated from the solution by filtration
Jan 1, 1949
-
Basic Principles For Stable Gullies In The Gold And Platinum Mines Of South AfricaGullies are the vital in-stope excavations that provide access for mining personnel and material to, and mined ore from, the producing faces in the tabular hard rock mines. They pose a serious proble
Jan 1, 2002
-
Burning pyrites compared to sulphur ? SynopsisBy W. V. Mutler
Present day capital costs are analysed for a 2 000 metric tonne per day (MTPD) pyrite burning plant and compared with a sulphur burning plant of the same capacity. Power, raw material and steam produc
Jan 1, 2009
-
Excavation Support And Groundwater Control Using Soil-Cement Mixing Wall For Subway ProjectsBy David S. Yang, Osamu Taki
The innovative Soil-Cement Mixing Wall Technique, developed independently in Japan, consists of mixing in-place soils with cement grout using multi-axis augers and mixing paddles to construct overlapp
Jan 1, 1989
-
Water-Powered Scrubber For Auger Miner Dust Control ? ObjectiveCapture airborne respirable dust generated by an auger-type continuous mining machine to reduce workers' dust exposure. Approach Install a water-powered scrubber system, operating at 1,400
Jan 1, 1989
-
Evolución del método de minado de mina Chupa Unidad Minera IscaycruzBy José Cuadros
"El presente trabajo señala el proceso de evolución del método de minado en la mina Chupa, perteneciente a la unidad minera de Iscaycruz. La evolución del método de minado se determinó por la búsqued
Jul 31, 2003
-
Contaminant Problems in Agrium’s Canadian Phosphate BusinessBy Julie Culverhouse, Dennis Grimm, Kieran Harding, Jean-Francois Boulanger
"Agrium’s Canadian Phosphate Business (CPB) is comprised of Kapuskasing Phosphate Operations (KPO) in Northern Ontario, Canada’s only operating phosphate mine, and Redwater Phosphate Operations (RPO)
Jan 1, 2011
-
Benefits of a Good Quality Assurance Program to an Electric UtilityBy W. J. Mahoney
A good quality assurance program at a coal mine or power plant is accurate, timely and consistent. The quality analysis is accurate due to a complete sampling of the coal stream loaded into the unit t
Jan 1, 1994
-
Bagdad Concentrator Process Control UpdateBy Peter Amelunxen, Craig Lockhart
Significant effort was made in 2003 and 2004 to upgrade the existing instrumentation and process control infrastructure at the Phelps Dodge Bagdad copper concentrator. Specifically, • cameras were
Jan 1, 2005
-
Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 CatalystsBy M. Kinne
Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM
Oct 1, 2003
-
Field-Scale Investigation Of Pulverized Coal Mill Power ConsumptionTwenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study
Jan 1, 2008
-
Development of Processing Alternatives for Frankfield East Deposit Using Selective Arsenopyrite-Pyrite FlotationBy R. Jackman, D. Koningen, G. Wilcox
"Gowest Gold Ltd. is in the process of developing the Frankfield East gold deposit located along the largely undeveloped Pipestone fault northeast of Timmins, Ontario. In addition to resource developm
Jan 1, 2012
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006