Search Documents

  • AUSIMM
    Image Processing of Central Volcanic Region Geophysics

    By M A. Mongillo

    Most geophysical and geochemical data collected during regional exploration programmes are in vector form (location, value), and have traditionally been presented and interpreted in a profile or conto

    Jan 1, 1992

  • SME
    Policy to Practice: Strategic Environmental Assessment in the Real World

    By F. M. McEvoy, E. J. Steadman, R. Murfin

    In England, the provision of aggregate is determined by the historical relationship between construction and aggregate consumption. This approach does not necessarily lead to sustainable decision-maki

    Jan 1, 2005

  • SAIMM
    Improving Cfd Analysis Of Dc Furnace Operation By Refining And Addition Of Transportation Phenomena Models

    By M. Shapiro, L. A. le Grange, B. Henning

    A paper was presented by Bateman Minerals and Metals at INFACONX (2004) describing a simplified Computational Fluid Dynamics (CFD) Model for predicting the temperature and velocity distributions in al

    Jan 1, 2007

  • SME
    Micro Tunneling 1.2-Mile, 72-In RCP With Crossings Of NJ Turnpike And CSX Railroads

    By Zhenqi Cai

    The ongoing Overpeck Valley Parallel Sewer Project of Bergen County Utilities Authority (BCUA), New Jersey, is a US $65 million CSO improvement program to meet a State DEP consent order by 2010. One m

  • AUSIMM
    Slurry Loading of Ironsand Concentrate Attaharoa

    By D E. Gadd

    Since October 1972, New Zealand Steel Mining Ltd has loaded around ten million tonnes of ironsand concentrate from single-point mooring buoys located off-shore at Taharoa on the west coast of the Nort

    Jan 1, 1980

  • ABM
    AVALIAÇÃO DE MICRODUREZA DE LIGAS Hf–Si–B

    By João Carlos Jânio Gigolotti

    O avanço tecnológico tem gerado demanda crescente por materiais que possam ser utilizados em alta temperatura e ambientes oxidantes, o que inclui ligas intermetálicas MR–Si–B (MR = metal refratário) c

    Aug 17, 2017

  • NIOSH
    OFR-71-75 Wedge Longwall Cutterhead Development - Phase I ? Executive Summary

    Longwall minim; is a highly mechanized, high productivity mining method that is finding increasing applications in coal. Although the method would be highly advantageous in certain hard rock mining ap

    Jan 1, 1974

  • DFI
    Evaluation Of The Originally Published, Meyerhof Empirical Correlations Of Shaft Friction And End Bearing Capacity For Driven Piles Using Dynamic Test Data

    By Karl A. Higgins

    In 1976, Prof. G. G. Meyerhof published a famous article in the Journal of Geotechnical Engineering titled ?Bearing Capacity and Settlement of Pile Foundations?. This article presents the authors opi

    Jan 1, 2011

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • DFI
    "Underpinning By Jet Grouting" - Summary

    By George K. Burke

    Underpinning of a structure has been traditionally expensive, time consuming, and, in many cases, caused as much settlement to the existing structure as it was trying to prevent. As underpinning is no

    Jan 1, 1991

  • AUSIMM
    The Relationship of Structure and Ore Deposition at Stawell Goldfield, Victoria

    The Stawell Goldfield, the westernmost of the main Victorian fields, has produced over a million and a quarter ounces of gold from one and three-quarter million tons of ore. The lodes are quartz reefs

    Jan 1, 1960

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • SME
    Weathering of freshly exposed sulphides at the Arctic Mid-Ocean Ridge

    By Rolf B. Pedersen, Ana Filipa Marques, Ingunn H. Thorseth, Ingeborg Okland

    "Deep sea mining of polymetallic sulphides will change the physical and chemical conditions at the seafloor by creating scars when sulphides are removed, and potentially also by deposition of mine tai

    Sep 1, 2014

  • SAIMM
    SAIMM Base Metals Conference, Namibia, July 2007 - The Minerals Industry And Syndicated Research

    By P G. Gaylard

    The minerals Industry carries out over US$ 2 billion of R&D annually. The R&D is performed at three levels ? in house research facilities; on a one-on-one basis with a research provider; as syndicated

    Jan 1, 2007

  • SME
    Mining And Marketing Altered Volcanic Tuff At The Heart Of Nature?s Alum/Sulfur Mine

    By John Heter

    An alum/sulfur deposit (USDA organic registered) was mined underground for alunite (K,Na) Al3 (SO4)2 (OH)6 from the early 1900s to the 1930s. It is now being mined as an open pit quarry. A larger as

    Jan 1, 2008

  • AUSIMM
    Continuous Vacuum Dezincing Plant at B.H.A.S. Pty Ltd., Port Pirie

    By Williams K. C

    This paper presents a brief account of the plant which has been developed at Port Pirie to recover, by vacuum distillation, the greater part of the zinc content of desilverized lead. The present plant

    Jan 1, 1956

  • NIOSH
    RI 3545 Progress Reports - Metallurgical Division ? 41. Matte Smelting Of Manganese ? Introduction

    By C. E. Wood

    Because of the renewed importance of the strategic metal manganese the Bureau of Mines in conducting further research on pyrometallurgical methods of beneficiating manganiferous iron ores and low-grad

    Jan 1, 1940

  • AUSIMM
    Cave Propagation and Open Pit Interaction at the Ernest Henry Mine

    By E Ah Mu and C R Lilley, A D. Campbell

    Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC

    May 9, 2016

  • SME-ICGCM
    Three-Seam Interaction: A Case Study

    By N. P. Kripakov

    Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath

    Jan 1, 1996

  • SME
    Instrumentation Of Open Cut Subway Excavation For The Metropolitan Atlanta Rapid Transit Authority (MARTA)

    By Rodney K. Morrison

    MARTA, The Metropolitan Atlanta Rapid Transit Authority, is building a 53 mile heavy rail transit system to serve the City of Atlanta. Phase A of the Rail System, consisting of approximately 14 miles

    Jan 1, 1979