Search Documents

  • DFI
    Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The Eurocodes

    By Niels Krebs Ovesen

    Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer

    Jan 1, 1994

  • AUSIMM
    The Coromandel Epithermal Gold-Silver Province: A Result of Collision of the Northland and Colville Volcanic Arcs in Northern New Zealand

    By D N. B Skinner

    Changes in the configuration of late Cenozoic volcanic arcs related to Pacific-Australian plate convergence in northern New Zealand may have localised large-scale epithermal gold-silver mineralisation

    Jan 1, 1997

  • NIOSH
    OFR-52-77 Alternate Conveyor Design For Mine Machinery

    By James H. Snyder

    This final report presents results of a program to develop a new conveyor system, adaptable to existing miners or loaders, which reduces the noise level to 90 dBA without reducing machine performance.

    Jan 1, 1976

  • NIOSH
    OFR-35(1)-73 Evaluation Of Mine Electrical Systems With Respect To Safety, Technology, Economics And Legal Considerations - Volume I ? Introduction

    By Robert Stefanko

    This report, rather than attempting to replace previous annual reports, supplements, and more importantly, coordinates and summarizes the entire effort. Even with such restrictions, the report is volu

    Jan 1, 1973

  • ISEE
    Tall Structure Response to Close-in Urban Blasting in New York City

    By Cathy Aimone-Martin, Robert Brentar, Brent Meins, James Lauer

    Vibration measurements of multi-story structures in an urban environment began 3 years ago in New York City during close-in blasting to adopt correct measurement procedures and recommend revised groun

    Jan 1, 2014

  • AUSIMM
    Towards More Sustainable Minefills - Replacement of Ordinary Portland Cement with Geopolymer Cements

    By G F. Brent, R D. Hart, C Carr, F Felipe

    In underground operations, where copper, gold and other metals are mined, the open stopes can be backfilled to stabilise surrounding workings. This fill may consist of tailings from the processing pla

    Jan 1, 2007

  • NIOSH
    OFR-41-80 Underground Vibrations From Surface Blasting At Jenny Mine, Kentucky

    By Dennis E. Jensen

    Field studies were performed during blasting operations for strip coal mining above the room and pillar workings at Jenny mine in eastern Kentucky. The study is part of the Bureau of Mines program to

    Jan 1, 1979

  • NIOSH
    IC 7854 Exploration Development, And Costs Of The Stormy Day Tungsten Mine, Pershing County, Nev. ? Summary

    By A. C. Johnson

    This report describes exploration, development, and exploitation methods, and summarizes costs at the Stormy Day mine, which was discovered in 1941. Several shipments of tungsten ore were made in 1944

    Jan 1, 1958

  • CIM
    A hydrometallorgical process for the extraction of copper

    By W. A. Ahrens, J. H. McNamara, J. G. Franek

    "An economical, pollution-free process has been developed for the hydrometallurgical extraction of copper from sulphide ores. The extracted copper, in the form of cuprous chloride (CuC/), is converted

    Jan 1, 1980

  • SAIMM
    Rapid Sensors For Ferroalloy Production And Processing

    By A. McLean, M. Iwase, K. Wakimoto, K. Katogi

    For many decades control strategies have been based upon samples taken from liquid steel, molten slag and gas phase as well as from solid products. Because of recent developments in the areas of dynam

    Jan 1, 2004

  • SAIMM
    CFB technology provides solutions for reducing CO2 emissions ? Synopsis

    By V. Bari?ic

    The scheduled power cuts of early 2008 were a disturbing reminder that South Africa needs to expand its power-generating capacity. Low-grade and discard coals, of which South Africa has much, are a so

    Jan 1, 2009

  • NIOSH
    RI 5987 Columbium-Vanadium Binary Alloys For High-Temperature Service ? Summary

    By H. R. Babitzke

    The purpose of this investigation was to develop an alloy of columbium for use at high temperatures and for nuclear applications. The properties of possible alloys were determined, and the more promis

    Jan 1, 1962

  • SME
    The Effect Of Bit Geometry And Size On Cutting Parameters In Linear Cutting

    By A. W. Khair

    This paper deals with the design characteristics of cutting tools and the operating parameters these tools are usually subjected to. Eight types of cutting tools/bits with different geometrical shapes

    Jan 1, 2001

  • AUSIMM
    The Geology of Iron Monarch Orebody

    To date Iron Monarch is the most important Australian source of iron ore and since HH5 has produced about 84 million tons of direct shipping ore containing 62 per cent iron and 3 per cent manganese.Pr

    Jan 1, 1964

  • AUSIMM
    An Analysis of Breakage Processes Within Rod Mills

    By Lynch A. J

    Comminution within rod mills has been investigated by use of a matrix analysis of breakage processes. A parameter, the number of breakage stages, has been introduced and comminution within all rod mil

    Jan 1, 1964

  • SAIMM
    Identification of Key Performance Areas in the Southern African Surface Mining Delivery Environment

    By A. W. Dougall, T. M. Mmola

    "SynopsisThe global resources and commodities market has become highly competitive. While southern Africa’s abundance of minerals resources is still unrivalled, it has lost considerable dominance in t

    Jan 1, 2015

  • DFI
    A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place Piles

    By Sridhar Krishnan

    This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p

    Jan 1, 2006

  • SME-ICGCM
    Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ Monitoring

    By Andreas Hucke

    For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry

    Jan 1, 2006

  • NIOSH
    OFR-8-73 Evaluation Of Methanometry In Coal Mines

    By Ralph D. Gift

    This report describes a program of research to evaluate methanometry in coal mines. The program commenced by conducting an extensive state-of-the-art survey. Details of the survey are presented which

    Jan 1, 1972

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012