Search Documents

  • AUSIMM
    Integrated Mine Evaluation ù Implications for Mine Management

    By M Armstrong, S J. Coward, A Galli

    Mine management is often expected to make rapid evaluation decisions at different stages of projects based on limited and uncertain data. The challenge is exacerbated by having to distil technical com

    Jan 1, 2006

  • SME
    Evaluations Of Bit Sleeve And Twisted-Body Bit Designs For Controlling Roof Bolter Dust

    By T. W. Beck

    Drilling into coal mine roof strata to install roof bolts has the potential to release substantial quantities of respirable dust. Due to the proximity of drill holes to the breathing zone of roof bolt

    Feb 27, 2013

  • AUSIMM
    Fire and Life Safety - The EastLink Perspective

    By C MacDonald

    There are many technologies available today in terms of fire and life safety in road tunnels. So many in fact that it is becoming more and more difficult for clients and contractors alike to determine

    Jan 1, 2008

  • NIOSH
    OFR-5(1)-77 Comprehensive Ground Control Study Of A Mechanized Longwall Operation - Final Report - Volume I

    Under contract from U. S. Bureau of Mines, Harza Engineering Company in cooperation with Eastern Associated Coal Corporation, conducted a ground control study of two mechanized longwall panels at the

    Jan 1, 1976

  • AUSIMM
    The Alluvial Gold Mining Industry in New Zealand

    By B S. Utting, W J. Cowie

    The alluvial gold industry of New Zealand is based on the placer deposits in Otago and on the West Coast. Production from these since discovery in the 1850s has been an estimated 480 t (15 Moz) of gol

    Jan 1, 1990

  • NIOSH
    OFR-149-84 Development And Validation Of A Training Program For Operators Of Noncoal Equipment - Volume I. Final Report

    This report describes the development of training materials for the operators of underground mining equipment in the underground metal and nonmetal mining industry. The objective was to determine the

    Jan 1, 1984

  • CIM
    Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer Process

    By Yannis Faitakis, Simon Bergeron

    "This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B

    Jan 1, 2003

  • SAIMM
    Design Of A Modern Large Capacity FeNi Smelting Plant

    By J. Kempken, R. Degel, J. Kunze, R. König

    The FeNi technology is currently dominated by high-power submerged arc furnaces, often designed as smelter as "two-inline-solution". To achieve the intended high efficiency, state-of-the-art design in

    Jan 1, 2007

  • IOM3
    Evaluation of static test used to predict the potential for acid drainage generation at sulphide mine sites

    By B. Gazea, A. Kontopoulos, A. Kourtis, K. Adam

    Static tests give a measure of the balance between acid-producing and acid-neutralising mineral components in a material, while kinetic tests determine acid generation and neutralisation over a long p

    Jun 19, 1905

  • CIM
    Evaluation of the Performance of a CIP Gold Recovery Process

    By M. Courchesne, C. Barbery, D. Hodouin, C. Carrier

    "The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat

    Jan 1, 1987

  • AUSIMM
    Philosophy of Slope Design: A Case Study of Geotechnical Investigations at Macraes Flat Gold Mine

    Site specific geotechnical data, deposit characteristics and method of mining are key factors when assessing an appropriate slope design philosophy. Mining geotechnics should be viewed as an iterative

    Jan 1, 1992

  • SAIMM
    Melting And Densification Of Electrode Paste Briquettes In Søderberg Electrodes

    By B. Larsen, S. Z. Nascimento, K. Fidje, J. P. M. Amaro, H. Gran

    Safe and good operation of Søderberg electrodes is dependent upon high quality electrode paste coupled with correct electrode operating procedures. Good electrode performance depends further on proper

    Jan 1, 2004

  • AUSIMM
    The Sulphide Ore Treatment Plant at Mount Morgan

    The ore, as sent to the sulphide mill, is a mixture, in varying proportions, of oxidized ore from above the 450-ft. level and sulphide ore from above and below (to date mainly from above) that level.

    Jan 1, 1939

  • AUSIMM
    Failure of Aluminum to Prevent Experimental Silicosis

    By King E. J

    Department of Pathology, British Post-graduate Medical School, London:The experiments here recorded were devised and carried -out during the last two years in an attempt to corroborate the important w

    Jan 1, 1945

  • NIOSH
    Design Analysis Of Underground Mine Ore Passes: Current Research Approaches

    By Stephen R. Iverson, Bill M. Stewart, Michael J. Beus

    The U.S. Mine Safety and Health Administration (MSHA) has identified ore pass hazards as a significant safety problem in underground metal mines in the United States injury and fatality data show that

  • AUSIMM
    VisuMet – analyses of lumpy iron carriers with image processing

    By H Mali, B Kain-Bückner

    Different types of lump iron ore-bearing particles were investigated in terms of their raw material properties depending on their behaviour during reduction. To predict the reduction behaviour differe

    Jul 24, 2017

  • NIOSH
    IC 8926 Minerals Availability Commodity Directory On Phosphate

    By Dale R. Spangenberg

    This Bureau of Mines Information Circular on phosphate is one of a series of minerals availability commodity directories. Nonconfidential information from the Minerals Availability Program data base c

    Jan 1, 1983

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • ISEE
    Advanced Blast Modeling for Mining Steeply Dipping Coal Seams

    By Dan L'Heureux, Joe Haid, Stephen H. Chung

    Most coal deposits in Western Canada involve steeply dipping multiple seams. An efficient way to recover coal seams would be to drill through the seams and blast both the overlying and underlying wast

    Jan 1, 1998

  • NIOSH
    RI 9458 - Behavior of Simulated Longwall Gob Material

    By Reno M. Pappas, Christopher Mark

    This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models

    Jan 1, 1993