Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Convergence Characteristics of the Rocks Surrounding the Tailgate Supported with Roof Bolts in the Fault-Affected ZoneBy Xinxian Zhai
Jining No. 3 Coal Mine, a subsidiary of Yanzhou Coal Company Limited. China, is a super-large modern mine. The coal mine is not only the first one constructed with five-million tons of designed produc
Jan 1, 2007
-
Coal Pillar Loading Mechanisms and Progress in Pillar DesignBy David Hill
The Australian underground coal mining industry is increasingly operating in an environment that challenges traditional concepts of coal pillar design, against a background of heightened expectations
Jan 1, 2008
-
Alleviation of Rock Bursts by Identifying Burst-Prone Mine WorkingsBy S. Paul Singh
Rock burst is one of the most serious mining hazards, adversely affecting the safety, economy and productivity of mines. It is a sudden manifestation of the release of strain energy stored in the rock
Jan 1, 2008
-
Seismic Tomography, an Ideal but Immature Tool for Coal Bump PredictionBy Erik Westman
Coal bumps remain one of the industry?s most devastating but least understood phenomena. If changes to the internal conditions of the rock mass could be observed there is hope that bumps could be fo
Jan 1, 2008
-
Main Gate Roof Support Design and Management During Longwall Retreat in the Australian Coal IndustryBy Rob Thomas
Main gate roof control during longwall retreat is subject to a significant increase in horizontal stress and risk. The implementation and management of an appropriate roof support design is as a resul
Jan 1, 2006
-
Characterization of Internal Insertion Pressure During Installation of Fully Grouted BoltsBy Luis Giraldo
The installation procedure of fully grouted rebar bolts requires that the bolt be pushed through the resin grout until it is fully inserted in the borehole. Resin grout is a highly viscous fluid that
Jan 1, 2006
-
Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall RecoveryBy Thomas A. Bailey
Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c
Jan 1, 2006
-
Some Thoughts on Calibrating LaModelBy Keith Heasley
In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa
Jan 1, 2008
-
Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-ReviewBy Frank E. Chase
During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga
Jan 1, 2006
-
Relationship between Mining Subsidence and Mining Depth in Strip Pillar MiningBy Wenbing Guo
Strip pillar mining method is one of the most important techniques for mining subsidence control in China. Mining depth is one of the most important factors that affect subsidence in strip pillar mi
Jan 1, 2007
-
Evaluation of the Effect of Length on Strength of Slender Pillars in Limestone Mines Using Numerical ModelingBy Dennis Dolinar
In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a
Jan 1, 2007
-
The Contributions of the Alpha Foundation to Ground Control Research and DevelopmentBy Tom Barczak, Julian Restrepo, Zach Agioutantis
"The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States
Jan 1, 2016
-
The Initial Collapse of the Overburden Over Longwall PanelsBy Gennaro Marino
Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing
Jan 1, 1987
-
Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 MineBy J. B. Lizak
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Field Measurements of Overburden and Chain Pillar Response to Longwall MiningBy Daniel W. H. Su
Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main
Jan 1, 1987
-
The Origin and History of U.S. Mine ResinBy Carl Tom Blevins
Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti
Jan 1, 2006
-
Ground Pressure Control With Use Of Freezing Rocks On The Ore Deposits Of YakutiaBy G. P. Neobutov
The near surface inclined gold ore deposit is mined out at freezing temperature. The replacement of ore pillars by artificial freezing rocks during the rock pressures control in this conditions presen
Jan 1, 1996
-
A Pipeliner's Perspective on Longwall MiningBy Robert B. Francini
Longwall mining and pipelines have coexisted since longwall mining was introduced into the United States. How the pipeline operator reacts to longwall mining under their line depends on many factors.
Jan 1, 2011
-
Yield Pillar Applications--Impact On Strata Control And Coal ProductionThis paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in IndonesiaBy Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya
"Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su
Jan 1, 2017