Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Towards a More Cost Effective Mining Truck – Preprint 97-55

    By A. W. Dickerson, G. Hollier, F. A. Bartley

    Following on from many years of research aimed at improving the effectiveness of truck haulage operations in mines operated by BHP Minerals, BHP Research developed a concept for an Innovative Large Mi

    Feb 24, 1997

  • SME
    Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)

    By M. L. Harris

    In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo

    Jan 1, 2008

  • SME
    Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143

    By N. Merriam

    This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo

    Feb 24, 1997

  • SME
    In-Mine Study Of High-Expansion Firefighting Foam - Preprint 09-095

    By L. L. Chasko

    A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Tw

    Jan 1, 2009

  • SME
    2010 Permeation Test Results For Grouts Made With Ultrafine Cement

    By Raymond W. Henn

    The 31th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, in Golden, CO June 7-11, 2010. The field demonstration portion of the course was con

    Jan 1, 2010

  • SME
    Trapezoidal Tapered Ring—Key Position Selection in Curved Tunnels

    By Shimi Tzobery, John E. Shamma, Samuel Swartz, Gary B. Hemphill

    The trapezoidal tapered ring method has made significant progress in recent years for shielded-TBM projects, excavating tunnels with high overburden, strict water tightness criteria, and multiple curv

    Jan 1, 2005

  • SME
    Battery Park Trunk Sewer Emergency Tunnel Project

    By Mark Rybak

    On Aug. 31, 2006, Tropical Storm Ernesto hit the city of Richmond, VA. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapsed a sewer

    Jan 1, 2008

  • SME
    Materials Flows Generated by Pyromet Copper Smelting

    By Thomas G. Goonan

    Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind

    Jan 1, 2005

  • SME
    Coal Pillar Strength Based On The Ground Reaction Curve ? A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME
    Effects of Longwsll Subsidence on Escarpment Stability

    By Valois R. Shea-Albin

    Increasing pressure from State and Federal agencies to mitigate mining-induced subsidence damage to overlying structures has presented a unique problem to the coal industry in the western United Stat

    Jan 1, 1986

  • SME
    Cresson Mine Completes Two-Year Expansion

    By William R. Yernberg

    The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini

    Jan 1, 2002

  • SME
    Analysis Of A Dense-Medium Separator For Coarse Coal Separation Using Computational Fluid Dynamics

    By F. F. Peng

    The raw-coal feeding system and the upward medium current flow in a dense-medium vessel (DMV) are, in addition to the residence time of particles in the separator, important factors for efficient coar

    Jan 1, 2007

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • SME
    Minerals Education Through The National Science Teachers Association Meetings: The Past And The Future

    By J. N. Murphy

    The use of the National Science Teachers Association (NSTA) regional meetings as a forum to educate teachers on the role of minerals in our society has been immeasurably successful. Each year, on ave

    Jan 1, 2001

  • SME
    Condition Assessment And Rehabilitation Of Tunnels: Case Histories From California?s Water Tunnels

    By David Van Horsen

    Operation and maintenance of California?s water tunnels is an important factor and vital link in California?s infrastructure. These tunnels are owned and operated by a variety of large and small priva

    Jan 1, 2008

  • SME
    Tamerlane Hoist And Vertical Belt Project

    By Shawn Collins

    BACKGROUND The history of the Pine Point Mine is a rich one. This property once boasted one of the largest and most profitable lead-zinc mines in Canada's long and storied mining history. The Pi

  • SME
    Industrial Minerals 1995

    The United States continued to depend on imported bauxite during 1995. Domestic bauxite mine production remained at about the same level as in 1994. It amounted to less than 1% of total world produc

    Jan 1, 1996

  • SME
    Integration Of Operations And Underground Construction: Sound Transit University Link

    By John Sleavin

    As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove

    Jan 1, 2010

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • SME
    Laboratory And Field Evaluation Of Dust Collector Bags For Reducing Dust Exposure Of Roof Bolter Operators (77cf6e87-f7a5-4d47-85c2-324b471775be)

    The National Institute for Occupational Safety and Health conducted laboratory and field tests to evaluate the effectiveness of dust collector bags for reducing dust liberation and operator exposure f

    Jan 1, 2008