Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Boddington Gold Mine Moves Closer To Production
Construction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr
Jan 1, 2009
-
Cyprus Coppertone Gold Benefits From Computerized Ore Control Procedures
By Rodrigo Jerez
Advances in inexpensive computer automation led to the development and use of a computerized ore control system at the Cyprus Copperstone Gold Mine near Parker, AZ. These new ore control practices imp
Jan 1, 1991
-
Port of Miami Tunnel Study: Bored or Immersed Tubes?
By Eldon L. Abbott, Rebecca K. Bolan
The Florida Department of Transportation, Florida’s Turnpike Enterprise is studying the feasibility of a 1128 meter (3,700 foot) vehicular tunnel to provide direct access for Port of Miami traffic to/
Jan 1, 2005
-
CSO Control At Detroit?s Upper Rouge Tunnel
By Wern-ping Chen
To mitigate and control the combined sewer over-flows from 17 outfalls in Detroit, MI, three outfalls in Dearborn Heights, MI and eight outfalls in Redford Township MI, the Detroit Water and Sewerage
Jan 1, 2007
-
Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle Harbour
By R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves
Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse
Jan 1, 2001
-
CEET (Comminution Economic Evaluation Tool) (For Comminution Circuit Design And Production Planning)
By G. Kosick, G. Dobby
CEET, an acronym for Comminution Economic Evaluation Tool, was jointly developed by MinnovEX Technologies Inc. and 13 major mining companies for the purpose of designing and predicting the performance
Jan 1, 2001
-
Preliminary Rib Support Requirements for Solid Coal Ribs Using A Coal Pillar Rib Rating
Researchers from the National Institute for Occupational Safety and Health (NIOSH) are developing a coal pillar rib rating (CPRR) technique to measure the integrity of coal ribs. The CPRR characterize
Jan 7, 2020
-
A Case Study of Geological Characterization of Co-rich Ferromanganese Crusts over a Giant Guyot "Takuyo No.5," the Northwestern Pacific
By H. Sato, B. Thornton, K. Nishi, A. Usui
"Northwestern Pacific submarine seamounts are believed to be future marine mining areas of ferromanganese crusts, which contain hi-tech industrial metals, such as Co, Ni, Te, Ti, Pt, and REEs. The Tak
Sep 1, 2014
-
Energy Fuels Prepared To Ride Uranium?s Resurgence
The two candidates in the upcoming presidential election in the United States each say that they have their own solution to the nation?s energy problems - solutions that will increase the amount of en
Jan 1, 2008
-
Vernal Mine: 19 Years Without a Lost-Time Accident
By John B. Spencer
Earlier this year, Simplot Phosphates achieved a safety milestone at its Vernal, UT phosphate operations. In March, the entire operation reached achieved seven years without a lost time accident. An
Jan 1, 2004
-
Cross-Borehole Geophysical Probing For Site Characterization
By R. J. Lytle
INTRODUCTION Prior to excavation in soil and rock, it is useful to know the subsurface structure. This is important information both for safety and for equipment scheduling reasons. It is useful to
Jan 1, 1979
-
Improved Training Reduces Worker Injuries
By Steve Kral
U.S. mines are among the most efficient, productive and safest in the world. Much of that efficiency is due to the high-technology equipment and processes available to the industry. The U.S. mining
Jan 1, 2002
-
Industrial Minerals 2004 – Pumice and Pumicite
By G. C. Presley
Estimated domestic production of pumice and pumicite in 2004 increased about 23 percent since 2003, according to the U. S. Geological Survey (USGS). The USGS estimate of domestic production of 687 kt
Jan 1, 2005
-
Evaluating Options For Gold Heap Process Optimization Using A Comprehensive Process Model
By S. Garcia, J. Gebhardt, D. McBride, A. Hernandez, A. Esplín, M. Cross
The Minera Yanacocha operation consists of several heaps interconnected with ponds and gold recovery plants and presents various operating challenges. A comprehensive process model has been developed
Jan 1, 2007
-
Pressure Sulfuric Acid Leaching of Manganese-Rich Slag with Pyrite as Additive Mining, Metallurgy and Exploration
By Shanming He, Jinliang Wang, Xiaoming Wang, Chunfa Liao
Large amounts of manganese-rich slag were generated from smelting low-grade manganese ore containing high iron and high phosphorus in electric furnace or blast furnace, which contain 25–40 mass% Mn. T
-
Pressure Sulfuric Acid Leaching of Manganese-Rich Slag with Pyrite as Additive Mining, Metallurgy and Exploration (7db33dda-c50f-417f-8a4f-b58cc9ccfa5b)
By Shanming He, Jinliang Wang, Xiaoming Wang, Chunfa Liao
Large amounts of manganese-rich slag were generated from smelting low-grade manganese ore containing high iron and high phosphorus in electric furnace or blast furnace, which contain 25–40 mass% Mn. T
-
Olympic history to be made with medals provided by Teck Resources
Canadian mining giant Teck Resources Ltd. will be the exclusive supplier of the metals used in the production of the more than 1,000 medals to be awarded at the Vancouver 2010 Olympic and Paralympic W
Jan 1, 2010
-
In Situ Stress Measurement In A Jointed Basalt: The Suitability Of Five Overcoring Techniques
By T. A. Rundle, K. Kim, W. M. McCabe, E. C. Gregory
Overcoring tests were conducted at the Near-Surface Test Facility(NSTF) to assess the suitability of five techniques (U.S. Bureau of Mines borehole deformation gauge (BDG), Commonwealth Scientific and
Jan 1, 1983
-
Multi-Gravity Separator: An Alternate Gravity Concentrator To Process Coal Fines
By A. K. Majumder
The multi-gravity separator (MGS) is a novel piece of equipment for the separation of fine and ultra-fine minerals. However, the published literature does not demonstrate its use in the separation of
Jan 1, 2007
-
Increased TBM Mobility and Adaptations for Special Projects
By Dennis Ofiara
Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin
Jan 1, 2008