Technical Note - Borealis Project: A Fast-Track Approach to Mine DevelopmentBy W. E. Coughlin, R. L. Faverty, F. H. Lightner
Introduction The intent of this paper is to present the general strategy and method of implementation to achieve a "fast-track" mine development. The major objectives of a "fast-track" or rapid devel
Jan 11, 1983
-
Ventilation on demand (VOD) auxiliary fan project ? Vale Inco Limited, Creighton MineBy O?Connor. D. F.
The ever increasing energy costs associated with mining at depth has become an important issue that needs to be addressed for future sustainable production. Vale Inco Limited?s Creighton Mine being th
Jan 1, 2009
-
Open Pit TBM Driven Drainage Tunnel?Ok Tedi MineBy Tony Peach
Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost
-
Evaluation Of Capillary Rise Methods For Determining Wettability Of Powders (5db810bc-2051-4544-80b4-3fdee5f4e379)By R. L. Wolfrom, R. Hogg, S. Chander
A gravimetric method for measuring rates of capillary rise in powders was explored. Methods to improve reproducibility and consistency of the results were investigated. In particular, the effects of
Jan 1, 2002
-
Automation Controls Can Lower Plant CostsBy Steve Kral
Not too many years ago, mining was in one of its cyclic down-sides. This forced mining companies into some innovative thinking to bring down the costs of production. And they have. Mining equipment
Jan 1, 2006
-
Scaleup Experience In Gold-Silver Heap LeachingBy Daniel W. Kappes
Testing ores for heap leach operations traditionally follows a progression of bottle roll tests, bucket and column leach tests, and very expensive large field leach tests. Enough data is now available
Jan 1, 1981
-
Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case StudyBy D. Drymonitis, G. Gialoglou
"Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a
Jan 1, 2005
-
Mining Foundation of the Southwest Honors Year 2000 InducteesThe 18th annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held on Saturday, Dec. 2, 2000 at The Westin La Paloma in Tucson, AZ. The 200
Jan 1, 2000
-
Fully automated analysis of chemical and physical properties of individual mineral species in heavy mineral sands by computer controlled scanning electron microscopy (CCSEM)By R. K. McLimans, C. Knudsen, S. Bernstein, D. Frei
Computer Controlled Scanning Electron Microscopy (CCSEM) is used to analyze indivdual mineral fractions in heavy mineral sands. CCSEM is a fully automated particle analysis technique for the determina
Jan 1, 2005
-
Determining Quantitative Mineralogy Using A Modified Modan Approach On The Questa Rock Pile Materials, New Mexico - Preprint 09-020By V. T. McLemore
Petrographic analysis of rocks is traditionally performed with optical microscopy using thin sections and point counting. However, this does not provide accurate mineral proportions for sedimentary, v
Jan 1, 2009
-
The assessment of noise from block cutting machines using the P-wave velocityBy M. S. Delibalta, S. Kahraman, R. Comakli
The block cutting machine is one of the most important noise sources in the stone processing factories. In this study, the assessability of the noise from the block cutting machines in the stone proce
Jan 1, 2011
-
Life Of Mine Schedule From Multiple Pits: A Case Study For The Tenke Fungurume Mining DistrictBy R. Benito
This paper describes the development of a life of mine schedule (LOM) for one of the world?s largest known sedimentary Copper-Cobalt districts located in the Katanga Province, Democratic Republic of C
Jan 1, 2011
-
Modeling And Simulation Of Mineral Processing Circuits Using JKSIMMET And JKSIMFLOATIn recent years there have been significant advances in computing power and programming technology, enabling more complicated processes to be modelled in greater detail. This has led to increased unde
Feb 27, 2013
-
An Introduction To Virtual Design And Construction (VDC)By Matthias Rheinlander
The paper will describe Virtual Design and Construction (VDC) as a tool which will enable us to build a project ?virtually? on a computer before constructing and operating it in the real world. VDC co
-
Concentrations and fractionation of REEs in marine ferromanganese crust deposits controlled by water depthBy Andrea Koschinsky, Peter E. Halbach, Margret Halbach, Andreas Jahn
"Ferromanganese crusts contain hydrous Mn and Fe oxides as main metal compounds together with some economically interesting minor elements such as Co, Ni, Ti and Cu and trace metals such as Mo, W, Nb,
Sep 1, 2014
-
3DOPT A Basis For A Mining Engineering System And A Routine To Optimize An Open Pit In Three Dimensions ? IntroductionThe purpose of the 3DOPT Program is to determine, starting from drill hole data, the optimum economic mining limits for an open pit. The economic limits are defined as those which maximize total profi
Jan 1, 1966
-
Molybdenum Supply ForecastingBy Rex E. Loesby
The dramatic increase in molybdenum prices from the low of less than $2.50/lb in 1999 to more than $40/lb in 2005 has caught the attention of molybdenum mine owners and exploration project developers.
Jan 1, 2007
-
Extension of the main ventilation system at LKABs Kiruna Mine for the new main haulage level 1365 mBy L. Mukka
The existing main mine ventilation system for the production areas to the Kiruna mine was constructed during the period 1994-1996 and extended with 4 more shafts, including fan stations, for the sea o
Jan 1, 2009
-
Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case HistoryBy Bob Rautenberg
The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s
-
Finding Added Value At Newmont Through Large-Scale Mining Sequence, Cutoff Grade And Process Optimization Using Mixed Integer Linear ProgrammingBy L. Clark
Despite near-record commodity prices, the mining industry continues to search for ways to maintain profits in these times of steadily increasing energy prices and steadily decreasing grades. The pres
Jan 1, 2007