Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)

    By P. K. Frempong, S. D. Butt

    "A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no

    Jan 1, 2004

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Ensuring Adequate Safety When Using Hydrogen as a Fuel

    By D. Allan Coutts

    Demonstration projects using hydrogen as a fuel are becoming very common. Often these projects rely on project-specific risk evaluations to support project safety decisions. This is necessary becaus

    May 1, 2007

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Complex Networks on a Rock Joint

    By H. O. Ghaffari

    A complex network approach on a rough fracture is developed. In this manner, some hidden metric spaces (similarity measurements) between apertures profiles are set up and a general evolutionary networ

    May 1, 2009

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    An agent-based framework for open pit mine planning

    By K. Awuah-Offei

    Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in

    Jan 1, 2008

  • CIM
    Nanoparticle Flotation Collectors for Pentlandite

    By Manqiu Xu, Songtao Yang, Zongfu Dai, Robert Pelton

    "Hydrophobic polystyrene nanoparticle suspensions were evaluated as potential flotation collectors for pentlandite. Experiments involving both clean model mineral suspensions and complex ultramafic ni

    Jan 1, 2012

  • CIM
    Metallurgy of the Mt. Milligan Porphyry Gold/Copper Deposit

    By A. B. Cron, R. MacPhail, L. Melis, K. Armstong

    "Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1

    Jan 1, 1991

  • CIM
    Development of an Iron Ore Concentrate Fines Recovery Process from Copper Tailings

    By Lutz Markworth, Fernando Parra, Wolfram Jaspers

    "The worldwide demand of iron ore and the depletion of the high-purity deposits make it necessary to recover ores in increasingly fine size fractions or low Fe content in the feed material. Impurities

    Jan 1, 2008

  • CIM
    New Developments in Process Mineralogy of Platinum-Bearing Ores

    By Louis J. Cabri

    "Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum

    Jan 1, 2004

  • CIM
    Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, Chile

    By Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson

    "Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr

    Jan 1, 2008

  • CIM
    A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore

    "This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs

    Jan 1, 1989

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • CIM
    Methodologies for Scale Up of Grinding and Flotation Circuits for New CVRD Projects

    By K. L. C. Gonçalves, V. K. Alves

    "CVRD’s Department of Development and Technology – GETEK has been developing and perfecting a general methodology for scaling up flotation and grinding circuits over several years. This methodology ha

    Jan 1, 2006

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Water Management Design for Cigar Lake Uranium Mine

    By Ken Dyck Sr.

    "Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to

    Jan 1, 2006

  • CIM
    Iron and steel making in the third millennium

    By J. P. Sancho, L. F. Verdeja, J. I. Verdeja

    "This paper analyzes the present state of the different processes competing to keep their market shares within the future iron and steel business sector.The continuous transformations in the steel mak

    Jan 1, 2002