Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design of Energy Efficient Shaft Systems

    By W. J. Kempson

    In recent years, substantial progress has been made with respect to the definition and control of the primary energy requirements in underground mines. Little has, however been done to develop a more

    Aug 1, 2013

  • CIM
    Integration of Oil Sands Tailings and Reclamation Planning with Longterm Mine Planning

    An optimized long-term mine planning determines the best order of material extraction, so that the Net Present Value (NPV) becomes maximum. In the case of oil sands surface mining, one of the key cons

    Aug 1, 2013

  • CIM
    The Sulphide Lake Gold-Bearing Belt, Lac La-Ronge District, Saskatchewan

    By J. B. Mawdsley

    A LITILE north of the geographic centre of the Province of Saskatchewan, 150 miles north of the city of Prince Albert, is a narrow green-stone and sedimentary belt of pronounced structural characteris

    Jan 1, 1940

  • CIM
    Developments in the Western Part of Rouyn District

    By W. F. James

    Introduction The season of 1927, from the point of view of mining development in the area west of Rouyn, was quite satisfactory. Serious prospecting and development' were undertaken over quite

    Jan 1, 1928

  • CIM
    WMCR - Kalgoorlie Nickel Smelter Operations Overview 1972 - 2005

    By J. Malone, D. Loth, J. Palmer

    WMC Resources' Kalgoorlie Nickel Smelter was commissioned in 1972 at a design capacity of 30,000 tpa of contained Nickel in matte. A series of upgrades and progressive improvements have resulted

    Jan 1, 2005

  • CIM
    Detection and Prevention of Early Plumbism

    By K. Raht

    LEAD poisoning is perhaps the oldest and, until recent years, the most misunderstood of all industrial diseases. Hippocrates appears to have recognized a relationship in the colic experienced by a pat

    Jan 1, 1941

  • CIM
    The Political and Policy Context Shaping Canadian Energy

    By Paul Stothart

    Agenda 1)Key Political and Policy Issues 2)Relevance to the Mining Sector ?All parties vying to be the greenest ?Regulation, indoor air, health issues combined into Clean Air Act ?International c

    May 1, 2007

  • CIM
    An Overview of Paste and Thickened Tailings Disposal on Surface

    By Murray W. Grabinsky

    This paper considers thickening mine tailings to dense non-segregating slurry or paste for surface disposal. The driving motivation for this initiative is the elimination of ponds, reduction in contai

    Nov 1, 2002

  • CIM
    Effects of the Rolls’ Speed and Pressure on the HPGR Performance during Gold Ore Grinding

    By H. Dundar, C. Dzomeku

    An extensive testwork was performed around the HPGR plant at GoldFields Ghana Limited Tarkwa Gold Mine. The HPGR was used to prepare the feed for heap leaching. The circuit was configured in such a wa

    Jan 1, 2012

  • CIM
    Private Regulatory Fragmentation As Public Policy: Governance In Canada?s Mining Industry (DRAFT / ABRIDGED VERSION)

    By José Carlos Marques

    This paper addresses recent calls to study the role of the state in private regulation. Using an historical, organizational-field approach, I trace and explain the evolution of public debates and inte

    Aug 1, 2013

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls (36201383-38b6-40ff-a8ef-b5e69088dfb5)

    By J. Drozdiak

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    TransAlta's Centralia Mine

    Centralia?Mine Operations ?Centralia Mine ?Mountainous Terrain ?High rainfall (greater than 50 inches/yr) ?Multiple Pit/Multiple Seam ?Truck/Shovel Prestripping ?Dragline Overburden ?Coal Wash

    May 1, 2001

  • CIM
    The Evolution of Maintenance Management into the 21st Century ? The Need to Implement Best practices

    By Ron Doucet

    Industry today is now more than ever dependent on its assets and on the standard of maintenance. Changes in technology, environmental regulations, a continually improving focus on safety and global co

    May 1, 2003

  • CIM
    Diamonds, Kimberlites, Lamproites and Related Rocks in the United States

    By W. Dan Hausel

    "Abstract-Hundreds of diamonds have been found in the United States. The majority of the discoveries occurred during the 19th century as a by-product of placer gold mining. Most of these early diamond

    Jan 1, 1995

  • CIM
    Multi-Component Autogenous Pilot Trials (2276d61f-fbab-4986-8788-619a8e669f37)

    By N. Plint, D. Philips, J. Sweet, B. Durant

    A pilot scale AG milling campaign was conducted at the AngloAmerican Platinum pilot plant in South Africa. Different blends of hard: soft (silicate: chromite) and coarse: fine particles in the AG mill

    Jan 1, 2012

  • CIM
    Towards Mechanistic Descriptions of Charge and Slurry Transport in Tumbling Mills (9cf2cc6c-a5a7-4d0b-861d-5dfc2f8aa93b)

    By D. J. Parker, G. B. Tupper, I. Govender

    Positron-Emission-Particle-Tracking (PEPT) has enabled the non-invasive observation of charge and slurry transport in model mills under operational conditions. We use high quality PEPT data to infer t

    Jan 1, 2012

  • CIM
    Numerical Model Parametric Study on the Effect of Stope Undercutting

    By H. Zniber El Mouhabbis

    Ore dilution or stope overbreak increases the cost of production and ultimately reduces the profitability of a mining operation. The adverse economic impact of ore dilution is due to the added costs a

    May 1, 2009

  • CIM
    Precision of Sampling Systems and Regimes

    By J. W. Merks

    "The accuracy of a measurement on minerals and ores can be assured by applying suitable and unbiased procedures but its precision is a function of the number of primary increments and their mass, the

    Jan 1, 1985

  • CIM
    Un système de refroidissement localisé sous-terre pour nos opérations à la mine Laronde

    By Nathalie Gauthier

    Bien que le système de ventilation du Puits Penna soit de taille imposante et que plus de $30M y seront engloutis pour son développement, aucun budget spécifique n?avait été préalablement consenti pou

    May 1, 2003

  • CIM
    The Impact of Heap Operational Changes on the Copper Production at Zaldivar

    By S. C. Bouffard

    Barrick's Zaldivar operation in Chile produces copper by heap leaching, solvent extraction, and electrowinning. The heap consists of a dynamic pad, and its stacking and operating conditions have

    Jan 1, 2007