Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Comparison of Ore Hardness Measurements for Grinding Mill Design for the Tenke ProjectBy David Meadows, John Starkey
"As part of the ongoing project development for the Tenke Fungurume Copper-Cobalt Project in the Democratic Republic of Congo, Phelps Dodge Corporation has examined methodologies for determining the s
Jan 1, 2007
-
Integration of gyratory crusher liner wear and operational performance for better crusher managementBy P. P. Rosario, D. M. Maijer
The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC
Jan 1, 2006
-
The David Bell Mine Water Quality Management Strategy (e343643b-635a-4023-9840-0613ce7068b5)By K. Meyer, M. E. Goddfellow
"At Teck-Corona Operating Corporation's David Bell Mine, a water quality management strategy is employed to produce both a chemically and biologically clean effluent prior to discharge to the environm
Jan 1, 1991
-
Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and InstallationBy Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt
"In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due
Jan 1, 2013
-
Design Considerations for Mine Waste Management at the Meadowbank Gold ProjectBy Cameron J. Clayton
Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec
May 1, 2004
-
Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and BlastingBy Roy McKinstry, Mark Rantapaa, Thomas Bolles
"More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi
Jan 1, 2004
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Namew Lake Mill ProjectBy K. Hoover, G. Labarre, S. Rantanen
"As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan
Jan 1, 1990
-
American Barrick Goldstrike Operation in Elko Nevada - A Summary of the Operation and Future ExpansionsBy R. H. Colquhoun, A. W. Bolland, H. J. H. Pieterse
"American Barrick Resources Corporation acquired the goldstrike property in north eastern Nevada in early 1987. Since that time, the company has undertaken an extensive development program. This paper
Jan 1, 1992
-
An Investigation on Processing Characteristics of Gold Ore Samples from Barry Deposit, QuebecBy S. Kelebek, E. Yalcin
"Two composite samples of a gold-bearing ore from North Western Quebec (Barry Township) were tested to assess their grindability, recovery by flotation and Knelson concentrator as well as extraction u
Jan 1, 2008
-
Process Mineralogy of Sudbury Platinum Group Minerals as Determined by Mineral Liberation AnalyzerBy Manqiu Xu, Andrew Lee, Frederick D. Ford, Cara Wercholaz
"Platinum-group minerals (PGM) typically occur in such low concentrations that quantitative mineralogical evaluation is difficult or impossible. The FEI MLA system used by Vale Base Metals Technology
Jan 1, 2011
-
Optimization of the paste backfill plant at Louvicourt mineBy J. Cayouette
In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through
Jan 1, 2003
-
Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper MineBy M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh
"The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.
Jan 1, 1999
-
Development Status of Thin, Spray-on Liners for Mining and Civil Engineering ApplicationsBy James F. Archibald
Research has been conducted for the Workplace Safety and Insurance Board of Ontario (WSIB) to characterize thin, spray-on lining materials (TSLs), as well as combinations of TSLs and conventional spra
May 1, 2006
-
Two problems, one solution — Auto shredder residue/plastics compositesBy J. Lazareck
"XPotential Products Inc. has developed technologies to convert auto shredder residues and other forms of plastic waste into useful products such as posts suitable for retaining walls and parking curb
Jan 1, 2004
-
A Simulation Model For Underground Roadway Development ProcessesBy Ernest Baafi
A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr
Oct 1, 2009
-
The Nanisivik MillBy A. C. T. Bigg
"The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of
Jan 1, 1980
-
Innovations in Reagent Technology: New Collectors and Modifiers for Difficult to Treat OresBy T. Bhambhani, D. R. Nagaraj
"Ultramafic Ni ores present significant challenges in processing in that both recoveries and grades are not satisfactory, due to the presence of Mg silicates in large amounts. Significant quantities o
Jan 1, 2012
-
Design and Operation of a Future MillBy D. E. Pickett, J. A. Roland Faucher
"INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow
Jan 1, 1979
-
The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical ProjectBy Jan E. Nesset, Phillip J. Mackey
"Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain
Jan 1, 2003