Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Simulation as a tool for quantifying design parameters for material handling systems

    By D. W. Ginsberg, D. Cieplinski

    "The lifetime cost of a material handling system, or any mine system, can be reduced through the application of quality engineering. Dynamic simulation is a powerful tool that can be used to enhance t

    Jan 1, 1998

  • CIM
    The Clinometer Rule as Part of a Geologist's Equipment

    By T. B. Williams

    Most geologists have felt the need of a longer base than is ordinarily available when using a Brunton compass or other convenient instrument for taking strikes and dips in the field. To overcome this

    Jan 1, 1929

  • CIM
    Hydraulic Hose Inventory Management and Tracking for Fleets

    By Tim Deans

    This paper will address methods to manage hydraulic hose and coupling inventory so that parts will be available to build assemblies for the vast majority of equipment with as little inventory as possi

    Aug 1, 2013

  • CIM
    Micro-Macro Modelling of True Triaxial Behaviors of a Granite

    By S. S. Yuan, Q. Z. Zhu, J. F. Shao

    "This paper aims at enriching a homogenization-based anisotropic damage model for hard rocks under complex loading. A new damage criterion is proposed to capture material strain softening. Within the

    Jan 1, 2015

  • CIM
    Fluorspar mines at St. Lawrence, Newfoundland

    By JAMES E. TILSLEY

    Veins at St. Lawrence near the tip of the Burin Peninsula in southeast New/ oundland have been the major Canadian source of fluorspar. Some 2.8 million tonnes were shipped during the period 1933-1977,

    Jan 1, 1984

  • CIM
    Gold Recovery Improvement in Heap Leaching Operations

    By A. Ghahreman, M. Oliazadeh

    "Heap leaching is an attractive process for low grade deposits where the metal content of ore does not justify the high cost of milling and agitated leaching. In general, the heap leaching capital cos

    Jan 1, 2019

  • CIM
    Silicothermic Extraction of Magnesium from Dolomite by Induction Heating

    By N. K. Jaber

    The "Pidgeon Process" for the extraction of magnesium from dolomite ore utilizing ferrosilicon as the reducing agent has been studied extensively by active metallurgists such Mr L,M, Pidgeon the fathe

    Jan 1, 2006

  • CIM
    The Effect of Carbonate Ions on the Electrokinetic Properties of Bastnäsite, Monazite and Dolomite

    By K. E. Waters, E. R. L. Espiritu, G. R. da Silva

    "Rare earth (RE) elements are essential components of emerging green technologies. The increase in demand for these applications have driven the search and development of new rare earth deposits such

    Jan 1, 2016

  • CIM
    Lithium pegmatites in Ontario

    By MAX VOS

    Lithium is the lightest and electrochemically most reactive of all metals. Renewed interest in lithium coincides with research in lithium batteries and power generation by atomic fusion. Ontario lithi

    Jan 1, 1984

  • CIM
    Effect of Grinding Conditions on Selective Dispersion Flocculation of High Alumina Containing Iron Ore Slimes

    By Dharmendr Kumar, Pradip, Beena Rai, Venugopal Tammishetti

    "Due to rapid depletion of high grade Indian iron ores, there is a need to utilize low grade fines and slimes. However, these fines and slimes, in their current form, cannot be utilized in steel makin

    Jan 1, 2016

  • CIM
    Characterization of Solid Phases in the Iron-Sulfate-Water System Where Silver is Present

    By D. B. Dreisinger, A. A. Gunaratnam

    A pressure oxidation (POX)-hot cure (HC)-lime boil (LB) process is used in industry to recover silver from refractory gold sulfide ores containing minerals such as pyrite and arsenopyrite. Pressure ox

    Jan 1, 2017

  • CIM
    Case Study on Application of Cohesive Fracture in Cuttings Reinjection in West Africa

    By W. Standifird

    "Cohesive fracture is a mechanical model widely used for modeling quasi-brittle fracture in rocklike materials. This work discusses use of this model to simulate quasi-brittle fractures generated by i

    Jan 1, 2015

  • CIM
    Recent Improvements at Tamano Refinery

    By M. Narita, S. Nakayama, M. Fujihara

    Hibi Kyodo Smelting Co., Ltd. was founded in 1968 and celebrated its 50th anniversary in 2018. In 1972, we started producing copper cathode with a production capacity of 84 KTPY. Since the company fou

    Jan 1, 2019

  • CIM
    Aspects of Plasticity and Fracture under Bending in Al Alloys

    By D. J. Lloyd

    "Bending is involved in the forming of many sheet parts and it is important to understand the phenomena involved. In this paper the basic equations describing bending on a global scale are compared wi

    Jan 1, 2018

  • CIM
    Dissolution of Low Grade Gold-Bearing Material with Chloride/Chlorine Solutions

    By M. Clotilde Apua, A. F. Mulaba-Bafubiandi

    "The efficiency of hydrochloric acid (HCl) leaching of gold from low grade gold-bearing material has been investigated in the presence of sodium hypochlorite (NaOCl) to produce in situ chlorine gas wh

    Jan 1, 2012

  • CIM
    Evaluation of Scale Up Effect on High Pressure Grinding Roll (HPGR) Implementation at Pt Freeport Indonesia

    By G. Banini

    Prior to installation of High Pressure Grinding Rolls (HPGR) at PT Freeport Indonesia (PT-FI) a series of laboratory tests were carried out to determine the design parameters and also determine key pe

    Jan 1, 2012

  • CIM
    Development and practice of the Falconbridge chlorine leach process

    By E. Thune, F. Stålesen, E. O. Stensholt, O. M. Dotterud, E. E. Henriksen, P. O. Ramsdal

    "The development and commercial operation of the Falconbridge chlorine leach process have been described in papers in 1985 and 1987. Since this time, various process improvements have been implemented

    Jan 1, 2001

  • CIM
    No. 2 Shaft Raise, Aunor Gold Mines, Ltd.

    By G. H. Montgomery

    THE PROPERTY of Aunor Gold Mines, Limited, consists of eleven claims, located in Deloro township, approximately three miles southeast of the town of Timmins. Production began in 1940 and currently the

    Jan 1, 1957

  • CIM
    The Reichert Cone Concentrator

    By J. Hall Carpenter

    "Wet concentration has, in the history of ore dressing, been the primary treatment method following crushing, grinding and sizing, when these have been necessary. The evolution of new methods of gravi

    Jan 1, 1966

  • CIM
    Val d'Or Division

    "The Val d'Or Division now comprises the Lucien C. Beliveau Mine and Concentrator (formerly the Pascalis, described below) and the Chimo Mine. Cambior acquired an initial 50% interest in the Chim

    Jan 1, 1990