Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Aids to design for coal preparation plants

    By D. G. Osborne

    "The paper describes current 'tools' available to the coal preparation engineer for carrying out the evaluation of data, process design, selection of equipment and layout and design of coal

    Jan 1, 1985

  • CIM
    Amulet Flotation Mill Practice

    By W. G. Hubler

    It has been within only the last two or three years that enough progress has been made in preferential flotation to warrant metallurgists in recommending the installation of commercial-sized plants fo

    Jan 1, 1931

  • CIM
    Rheology of Latertic Ore and Mixed Mineral System Slurries

    By M. H. Colebrook

    Nickel laterites contain about 70% of all continental or terrestrial nickel resources; therefore the recovery of nickel from lateritic ores has large economic significance. The processing of lateritic

    Jan 1, 2006

  • CIM
    Equipment adaptation to tile Canadian North at Iron Ore Company of Canada

    By R. E. G. Caines, P. Alport

    "Operating heavy equipment in Labrador, where the winters are 8 months long and the temperature frequently drops below -40°F (-40°C) for days and sometimes weeks presents unique problems in both the o

    Jan 1, 1984

  • CIM
    Testing In Situ Aluminium Cell Control with the Dyna/Marc Cell Simulator

    By M. Dupuis

    Recently, a new approach to controlling alumina feeding in a H.H. cell has been proposed [1, 2 and 3]. This approach, labeled In Situ aluminium cell control, is based on a correlation between the slop

    Jan 1, 2011

  • CIM
    Use of oxygen in the Outokumpu flash smelting process

    By P. Hanniala, S. Harkki, B. Andersson

    "The Outokumpu Flash Smelting Process was put into commercial operation in 1949. The original process was based on the use of preheated air. The adoption of oxygen enrichment of the flash smelting pro

    Jan 1, 1982

  • CIM
    The thermal behaviour of chloride and sulphate bearing MSW incinerator ash

    By H. N. Tran, D. Barham

    "A systematic survey of the appropriate literature in terms of phase equilibria and possible reactions involving deposits in Municipal Solid Waste (MSW) incinerators are analyzed particularly with res

    Jan 1, 1991

  • CIM
    Automation of ore loading pockets using programmable control

    By S. P. Jekielek

    "This paper describes the automation of a mine hoist ore loading pocket using a programmable controller. It provides an introduction to programmable control, and outlines the various modes and operati

    Jan 1, 1980

  • CIM
    On Education ?and the Shortage of Technical and Scientific Manpower

    By F. R. Archibald

    A STATEMENT on this subject by A. D. Turnbull, presented and discussed at the Annual Business Conference of the Metallurgy Division, C.I.M., held in Ottawa on April 22nd 1957, led to creation of a com

    Jan 1, 1958

  • CIM
    Progressive Management and Engineering Evaluation of Pipeline Integrity

    By S. Kariyawasam, R. McNealy

    Pipelines are subject to multiple threats often requiring quantification of pipeline risk and engineering evaluation of in-line inspection and other data to effect discovery of conditions defined by t

    Jan 1, 2005

  • CIM
    Management cost control at Fording Coal Limited's Genesee Operations

    By Phil A. Keele

    "IntroductionGeneralThe Genesee Coal Mine is a joint venture of Fording Coal Limited and the city of Edmonton. The mine supplies thermal coal to the Genesee Generating Station operated by Edmonton Pow

    Jan 1, 1994

  • CIM
    Potash in the Central New Brunswick Platform?

    By S. R. McCutcheon

    "The regional stratigraphy of the Lower Carboniferous Windsor Group in the Moncton Subbasin indicates that evaporites could be present in the Marysville Subbasin, part of what was formerly called the

    Jan 1, 1983

  • CIM
    Experimental Measurements of the Copper Electrowinning Behavior and Current Efficiency Pre and Post Shorting

    By Michael L. Free, Zongliang Zhang, Joshua M. Werner

    In the copper electrowinning process, short-circuiting between the anodes and the cathodes is a critical problem that changes the current allocation among local electrodes and reduces the current effi

    Jan 1, 2019

  • CIM
    Treatment of ferro-manganese fines in an extended arc flash reactor

    By A. McLean, D. K. A Donyina, R. S. Segsworth

    "Various aspects of processing ferro-manganese fines generated during the crushing of standard ferro-manganese have been studied in laboratory-scaleplasma furnaces. These laboratory furnaces are based

    Jan 1, 1982

  • CIM
    The Emerald Lake concentrator design and commissioning

    By Gary Hawthorn

    "Laboratory testing, by Lakefield Research determined that, in spite of the relatively high pyrite content of the Golden Rose (GR) orebody, it would respond well to gravity concentration followed by e

    Jan 1, 1989

  • CIM
    Activation de la magnésia par déshydroxylation des rejets d'amiante du Québec

    By G. Gabra, M. Nagamori, J. J. Panneton

    "RESUMELa calcination contrôlée de 10 serpentine permet de produire de 10 magnésie active. Le degré de I'activation est mesure par 10 solubilité du magnésium dans les acides faibles tel que I&apo

    Jan 1, 1982

  • CIM
    Properties of Asbestos Fibers Imported into the United States

    By M. S. Badollet, N. W. Edgerton

    "A study of the physical properties of long grades of asbestos fibers imported into the United States during the past eight years has disclosed information that will contribute materially to effective

    Jan 1, 1960

  • CIM
    Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec

    By Louis Cabot

    A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A descript

    May 1, 2001

  • CIM
    Technical Advancements Towards Achieving 1500 T/a Production Rate At The Honeymoon Isr Operation

    By A. Rao, J. A. Davidson, B. L. Jones, K. W. Bowes, D. Craib

    Supported by ANSTO, Groundwater Science and Inception Consulting Engineers, Boss has embarked on a series of technical projects aimed at reinforcing the Project’s capability to meet its export permit

    Jan 1, 2020

  • CIM
    Development and Calibration of a Reconciliated Mineralogy Method Based on Multitechnique Analyses: Application to Acid Mine Drainage Prediction

    By H. Bouzahzah

    The field of quantitative mineralogy has evolved significantly through the development of image analysis techniques and information technology. Quantitative mineralogical characterization can now be r

    Jan 1, 2016