Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Outotec’s Fully Automated Smelter 2020 – The Vision, the Status and the Future
By Joey Hoang, Robert Johansson, Tapani Keronen, Mikael Jåfs, Jani Jansson, Mikko Korpi
At the Copper 2016 conference in Kobe, Japan, Outotec introduced a vision for the year 2020, wherein smelting would make use of four digital cornerstones: intelligent instruments, advanced process con
Jan 1, 2019
-
Expansion of Uranium Milling at Denison Mines Limited
By E. LaRocque
"Long term contracts requiring delivery of 6,000,000 pounds of U308 per year to its customers have made it necessary for Denison Mines to expand its milling capacity from 7,100 tons per day to 15,000
Jan 1, 1982
-
Development of the automatic GO-60 drill
By R. England
"This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.
Jan 1, 1987
-
Changing Company Culture
By Frank B. Amon
Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla
May 1, 2004
-
Galvanizing plant trial using the nickel-zinc process
By C. J. Allen, L. Battiston
"Introduction It has long been recognized by the hot-dip galvanizing industry that the characteristics of the galvanized coating can be influenced significantly by steel and pro cessing variables. Pro
Jan 1, 1987
-
Gold Alloy Deformation Processed Metal - Metal Matrix Composite Wire
By Timothy W. Ellis
Wire Bonding is the dominant IC interconnection process presently used in the semiconductor assembly industry (1). The flexibility, adaptability and cost of wire bonding will continue to keep it as th
Oct 1, 2003
-
Power Quality and Production Improvement of an Iron Ore Mine by the use of an SVC
By Niklas Willemsen
Introduction to SVCs ? SVC = Static var Compensator ? Dynamic step-less control of reactive power without switching of passive components: ? Voltage control/stabilization ? Harmonics- and flicker
Aug 1, 2013
-
How Many Samples are Enough? Theoretical Determination of the Critical Sampling Density for a Greek Clay Quarry.
By Konstantinos Modis
According to recently established theoretical analysis and under certain conditions, a critical sampling density can be determined for an earth-related space-distributed natural variable. Sampling abo
Oct 1, 2009
-
Survey of metal values in the ground, 1987–2004
By H. Agnerian
"A survey of 925 mineral property transactions worldwide was carried out between 1987 and 2004. These mineral properties with reported Mineral Resources include 457 gold properties, 322 base metal pro
Jan 1, 2006
-
Cultivator shank manufacture and evaluation
By R. W. Pugh, D. G. Bellow
"This paper will describe how cultivator shanks are made in one company and how the manufacturing was studied with a view to increasing product consistency and reducing manufacturing cost. The product
Jan 1, 1982
-
Simulating the Mine-Mill Interface
By J. A. Meech, G. R. Baiden
"A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru
Jan 1, 1987
-
Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies
By Jerry Ran
Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin
May 1, 2004
-
The Bethlehem Molybdenum Plant
By E. A. Lowe, A. F. Bellamy, J. W. Smith
"In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall
Jan 1, 1980
-
Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches
By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak
A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic
Jan 1, 2007
-
Improving Safety With GPS-Based Proximity Detection Improving Detection
By Casey Erickson
Goldstrike Property ??Located in Elko, NV USA?Carlin Trend ??Mining Since 1985 ??27 Million Ounces of Gold Mined ??Production of 400,000 tons/day ??1,600 Employees
May 1, 2011
-
SmartEXEC Implementation Goldcorp Eleonore Project
By Michel Massé
Eleonore Project- Agenda ? Purpose and Technical Overview ? SmartEXEC Control Capabilities ? SmartEXEC System Archetecture ? SmartEXEC System Advantage Eleonore Project- Purpose and Technical O
Aug 1, 2013
-
Uppers drilling for mechanized cut-and-fill stoping at Brunswick Mining and Smelting No. 12 Mine
By R. W. Baker
"The development of uppers drilling at Brunswick Mining is reviewed. This paper describes design criteria for drilling patterns and the research required for selection of a suitable drill jumbo. The s
Jan 1, 1988
-
Aspects of Operational Mine Safety Assurance at the 4 South Mine, Quinsam Coal Mining Operation
By Paul Krivokuca
Outline Quinsam Coal Mine ?? Location ?? Mine History ?? Safety ?? Production ?? Hiring 4S Mine ?? Depillaring design ?? Structural mapping, Risk assessment ?? Rock Bolt Design Selection ??
May 1, 2008
-
Prevention of corrosion in aircraft -an overview of the evolution of materials and protective treatments
By L. Salnais
"Aluminum alloy structural components f or aircraft designed prior to the early 1970s, were machined from 2024, 7075 and 7079 plate, bar and forgings in either the T3xxx of the T6xxx tempers. Protecti
Jan 1, 1988
-
Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite
By A. Roca, G. Ríos, I. Ruíz, M. Cruells
Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert
Jan 1, 2019