Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Outotec’s Fully Automated Smelter 2020 – The Vision, the Status and the Future

    By Joey Hoang, Robert Johansson, Tapani Keronen, Mikael Jåfs, Jani Jansson, Mikko Korpi

    At the Copper 2016 conference in Kobe, Japan, Outotec introduced a vision for the year 2020, wherein smelting would make use of four digital cornerstones: intelligent instruments, advanced process con

    Jan 1, 2019

  • CIM
    Expansion of Uranium Milling at Denison Mines Limited

    By E. LaRocque

    "Long term contracts requiring delivery of 6,000,000 pounds of U308 per year to its customers have made it necessary for Denison Mines to expand its milling capacity from 7,100 tons per day to 15,000

    Jan 1, 1982

  • CIM
    Development of the automatic GO-60 drill

    By R. England

    "This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.

    Jan 1, 1987

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • CIM
    Galvanizing plant trial using the nickel-zinc process

    By C. J. Allen, L. Battiston

    "Introduction It has long been recognized by the hot-dip galvanizing industry that the characteristics of the galvanized coating can be influenced significantly by steel and pro cessing variables. Pro

    Jan 1, 1987

  • CIM
    Gold Alloy Deformation Processed Metal - Metal Matrix Composite Wire

    By Timothy W. Ellis

    Wire Bonding is the dominant IC interconnection process presently used in the semiconductor assembly industry (1). The flexibility, adaptability and cost of wire bonding will continue to keep it as th

    Oct 1, 2003

  • CIM
    Power Quality and Production Improvement of an Iron Ore Mine by the use of an SVC

    By Niklas Willemsen

    Introduction to SVCs ? SVC = Static var Compensator ? Dynamic step-less control of reactive power without switching of passive components: ? Voltage control/stabilization ? Harmonics- and flicker

    Aug 1, 2013

  • CIM
    How Many Samples are Enough? Theoretical Determination of the Critical Sampling Density for a Greek Clay Quarry.

    By Konstantinos Modis

    According to recently established theoretical analysis and under certain conditions, a critical sampling density can be determined for an earth-related space-distributed natural variable. Sampling abo

    Oct 1, 2009

  • CIM
    Survey of metal values in the ground, 1987–2004

    By H. Agnerian

    "A survey of 925 mineral property transactions worldwide was carried out between 1987 and 2004. These mineral properties with reported Mineral Resources include 457 gold properties, 322 base metal pro

    Jan 1, 2006

  • CIM
    Cultivator shank manufacture and evaluation

    By R. W. Pugh, D. G. Bellow

    "This paper will describe how cultivator shanks are made in one company and how the manufacturing was studied with a view to increasing product consistency and reducing manufacturing cost. The product

    Jan 1, 1982

  • CIM
    Simulating the Mine-Mill Interface

    By J. A. Meech, G. R. Baiden

    "A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru

    Jan 1, 1987

  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Improving Safety With GPS-Based Proximity Detection Improving Detection

    By Casey Erickson

    Goldstrike Property ??Located in Elko, NV USA?Carlin Trend ??Mining Since 1985 ??27 Million Ounces of Gold Mined ??Production of 400,000 tons/day ??1,600 Employees

    May 1, 2011

  • CIM
    SmartEXEC Implementation Goldcorp Eleonore Project

    By Michel Massé

    Eleonore Project- Agenda ? Purpose and Technical Overview ? SmartEXEC Control Capabilities ? SmartEXEC System Archetecture ? SmartEXEC System Advantage Eleonore Project- Purpose and Technical O

    Aug 1, 2013

  • CIM
    Uppers drilling for mechanized cut-and-fill stoping at Brunswick Mining and Smelting No. 12 Mine

    By R. W. Baker

    "The development of uppers drilling at Brunswick Mining is reviewed. This paper describes design criteria for drilling patterns and the research required for selection of a suitable drill jumbo. The s

    Jan 1, 1988

  • CIM
    Aspects of Operational Mine Safety Assurance at the 4 South Mine, Quinsam Coal Mining Operation

    By Paul Krivokuca

    Outline Quinsam Coal Mine ?? Location ?? Mine History ?? Safety ?? Production ?? Hiring 4S Mine ?? Depillaring design ?? Structural mapping, Risk assessment ?? Rock Bolt Design Selection ??

    May 1, 2008

  • CIM
    Prevention of corrosion in aircraft -an overview of the evolution of materials and protective treatments

    By L. Salnais

    "Aluminum alloy structural components f or aircraft designed prior to the early 1970s, were machined from 2024, 7075 and 7079 plate, bar and forgings in either the T3xxx of the T6xxx tempers. Protecti

    Jan 1, 1988

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019