Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Ground support systems at Rampura Agucha Underground Mine

    By B Banerjee, N Kumar, S Parihar

    Rampura Agucha Pb-Zn Mine (RAM) is located about 200 km to the south-west of Jaipur in the state of Rajasthan, India. Open pit mining operations commenced in 1988 and continued to 2018. RAM open pit f

    Nov 29, 2022

  • AUSIMM
    Tunnelling in Unsolidified Water Bearing Sandstone-Construction of Tsugaru Tunnel (Futamata Construction Section)

    By Kaji S

    The Tsugaru Tunnel, located on the Honshu island approach to the Seikan Tunnel, is 5,880 m long and has a "Shinkansen" cross section of 90 m2 area. The geological formation through which the tunne

    Jan 1, 1987

  • AUSIMM
    Exploration Implications of Palaeomagnetic Overprint Chronology in the McArthur Basin

    By Wyborn L, Giddings J. W, Plumb K. A

    The McArthur, Balma (new name) and Habgood Groups are thick (up to 4.5 km) correlative sequences of shallow water evaporitic carbonates, mudstones and sandstones that are exposed largely within the

    Jan 1, 1994

  • AUSIMM
    Cemented Rockfill OptimisationùThe Rock Attrition Model and Fill Raise Orientation Effect

    By J Szymanski, S Planeta

    In pursuit of optimising the cemented rockfill system fragmentation of the aggregate, while travelling through the surface-to-underground aggregate transport raise, was investigated and a æfines estim

    Jan 1, 1998

  • AUSIMM
    Core & Shell Pillar Recovery Stoping in Mount Isa Silver/Lead/Zinc Mine

    Mount Isa mine is the largest underground mine in Australia and is located 2,000 kilometres north-west of Brisbane. This mine has been in continuous operation since 1931 and in 1986/87 the silver/lea

    Jan 1, 1990

  • AUSIMM
    Ventilation of an Open Pit Iron Ore Mine in the Pilbara Region of Western Australia

    By Mouritz M

    Ventilation characteristics and the occurrence of nocturnal surface inversions have been investigated within the Mount Whaleback open cut iron ore mine at Newman in Western Australia. When winds ar

    Jan 1, 1988

  • AUSIMM
    Sulphide Oxidation in Pyritic Overburden a Controlled Leach Column Study

    By Bowdler RJ, Lowson RT, Sarbutt JV

    There have been few long-term studies of sulphide oxidation under controlled conditions. The object of this study was to investigate the oxidation and leaching characteristics of pyritic mine materi

    Jan 1, 1988

  • AUSIMM
    Mass Transfer Studies for a Pulsed Disc and Doughnut Extraction Column

    By H R. C Pratt, G W. Stevens

    Hydrodynamic and mass transfer performance are presented for a 72.5 mm diameter pulsed disc and doughnut column of the type used by Western Mining Corporation, Olympic Dam Operation, for the extractio

    Jan 1, 2000

  • AUSIMM
    Current Drilling and Blasting Practice in the 1100 Orebody-Mount Isa

    Mount Isa Mines Ltd. annually extracts 5.6 million tonnes of copper ore from the 1100 Orebody. All production is by longhole open stoping, with an increasing emphasis on pillar recovery. Drilling an

    Jan 1, 1988

  • AUSIMM
    Equipment Selection for Narrow Vein Operations

    By Hare G

    The emphasis in Australia, until recently, has been on large scale mining methods with drive sizes in excess of 4.5 metres square and the acceptance of high dilution ratios, even when working in relat

    Jan 1, 1993

  • AUSIMM
    Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical Techniques

    By D J. Bradshaw, B Lottermoser, A Parbhakar-Fox

    "Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency

    Sep 29, 2013

  • AUSIMM
    The Geomet Curve – A Model for Implementation of Geometallurgy

    By J Vann

    Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo

    Sep 5, 2011

  • AUSIMM
    A System for Ore Tracking in Autonomous Mining

    By E Nettleton, A Melkumyan

    A probabilistic system for autonomous tracking of excavated ore in mining would be highly valuable. Currently, mine sites can have a vast array of sensors; examples include excavator load cells, bucke

    Sep 26, 2011

  • AUSIMM
    Towards the Elimination of Conventional Surface Slurried Tailings Storage Facilities

    By D J. Williams

    The approach to the disposal and storage of mine tailings is slowly evolving. Tailings disposal has been based on minimising short-term capital and operating costs, with rehabilitation costs discounte

    Jul 27, 2015

  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016

  • AUSIMM
    Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator training

    By P Oikkonen

    Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and

    Mar 29, 2023

  • AUSIMM
    Draw Control Optimisation along the Production Drift in Sublevel Caving Mines

    By A Gustafson, G Shekhar, P Boeg-Jensen

    The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend

    May 9, 2016

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    Seismically Active Mines ù To Buy or Not to Buy

    In recent years there have been many changes in mine ownership due to the on-going rationalisation towards larger mining companies. Larger companies inevitably find it hard to manage small mining oper

    Jan 1, 2002