Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Iron Ore Washing – Achieve More with Fewer Resources

    By M Zlatev, S Silge

    Producers of primary resources such as iron ore face the challenge of processing crude materials with increasing levels of impurities, which may result in the requirement for wet processing. This resu

    Jul 13, 2015

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Regular Measurement Defines Upgrades on Scrubber Screens

    By R Wilson, S Luke, R Williams, B Freeburn

    "In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e

    Oct 10, 2016

  • AUSIMM
    Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological Modelling

    By F Flitti, M Haest, O Dominguez, D Mittrup, G Hird

    The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u

    Jul 13, 2015

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Mitigation of Post-blast Fume in Soft Ground and Wet Conditions

    By S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri

    Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric

    Aug 24, 2015

  • AUSIMM
    Improving crusher throughput using a problematic ore index based on simple, first principles geology

    By T Walton, C Perring, M Pepper, G Gerber

    The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st

    Mar 22, 2022

  • AUSIMM
    Misima Mines milling operation: one of the World's lowest cost conventional gold extraction plants

    Milling operations at Misima Mine are discussed, with specific reference to the application of energy and cost saving concepts. Design stage innovations and post-commissioning developments are covered

    Jan 1, 1994

  • AUSIMM
    Applicability of Categorical Simulation Methods for Assessment of Mine Plan Risk

    By A Jewbali, R Perry, R Inglis, L Allen

    "The use of conditional simulation to characterise mine plan uncertainty is increasing for the assessment of risk in mining projects. While the development of grade uncertainty profiles is relatively

    Nov 24, 2014

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper Concentrator

    By M L. Muller, A R. O’Donnell

    The Mount Isa Mines (MIM) Copper Concentrator has an extensive history of reagent trials, with different reagents coming in and out of favour over the years. The research and use of carbon depressants

    Aug 29, 2018

  • AUSIMM
    Ground support rationalisation at Golden Grove

    By R Varden

    This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications

    Mar 29, 2023

  • AUSIMM
    Opportunities for rare earth element recovery from waste streams

    By K Clode, J Al-Shdifat, S Daykin

    Planning for a circular economy allows for previously untapped market opportunities to be explored, resulting in new, innovative revenue generating opportunities, while also reducing environmental imp

    Sep 1, 2024

  • AUSIMM
    Reverse circulation drill commissioning at Lihir open pit to provide data for medium term planning

    By M Akop, G Phillips, L Elliott

    An estimation geologist has many tools in their kit and using the correct one for the job is vital for creating a useful model. Reconciliation is a key step to monitor the performance of a resource mo

    Mar 22, 2022

  • AUSIMM
    Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mine

    By B J. Hutchison, S Gannon, J Chambers, D Oko-oboh

    The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min

    Sep 20, 2017

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Demonstrating Efficiency Gains from Installing Truck Turntables at Crushers

    By P A. Grossman, J H. Rubinstein, M Brazil

    The installation of truck turntables at above-ground crushers has the potential to yield gains in efficiency and productivity by eliminating the need for the trucks to turn around and reverse up to th

    Nov 24, 2014

  • AUSIMM
    Effect of Mineral Density for Milling Magnetite Ores

    By P Holtham, W Valery, P Baguley, A Jankovic

    There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m

    Jul 13, 2015

  • AUSIMM
    Improved forged grinding media performance with carbon content greater than 1.0%

    By R Bose, M Bovell, G Cheong

    Grinding media is a major consumable in mineral processing and therefore decreasing costs associated with its consumption is regularly considered a key goal for the minerals processing industry. Grind

    Aug 29, 2018